In-Home SPED Tutor — Flexible Part-Time Impact

Tutor Me LA LLC

California

Vor Ort

USD 34.440 - 48.216

Teilzeit

14 Tage+

Eine vollständige Bewerbung in einer Minute

Maßgeschneiderter Lebenslauf und Anschreiben – versandbereit.

Schaffe es an den ATS-Filtern vorbei

Benefits dieser Stelle

Mileage reimbursement
Technology stipend
CalSavers retirement plan
Referral program
Performance incentives

Zusammenfassung

Tutor Me Education is seeking an In-Home Special Education Tutor to deliver personalized 1:1 instruction and socio-emotional support in students' California homes.

This flexible, part-time W-2 role starts with 2–10 hours/week, with room to grow, and offers premium rates for bilingual or credentialed tutors.

Requirements include BA or higher in Special Education, Psychology, or Education, experience with ASD/ADHD/Dyslexia, willingness to travel locally, and ability to pass a background check.

Qualifikationen

  • BA/BA or higher in Special Education, Psychology, or Education.
  • Experience supporting students with special needs (ASD/ADHD/Dyslexia).
  • Background check required.
  • Ability to travel to client homes.

Aufgaben

  • Lead 1:1 sessions tailored to students with diverse learning needs.
  • Implement lesson plans aligned to each student’s IEP goals with team support.
  • Adapt academic materials to each student’s learning profile.
  • Track progress and communicate with parents/guardians.
  • Foster a safe, inclusive environment to build confidence.

Kenntnisse

Empathy
Patience
Student-first approach

Ausbildung

BA or higher in Special Education / Psychology / Education

Jobbeschreibung

Pay: $25–$35+/hour, (Additional premium rates available based on credentials and experience) · Hours: ~2–10 hrs/week to start, room to grow · Location: In-home across California

About the Role

At Tutor Me Education, we connect passionate educators with neurodivergent students for high-impact, 1:1 in-home tutoring. As an In-Home Special Education Tutor, you'll deliver personalized academic instruction, socio-emotional support, and patient behavioral guidance aligned to each student's learning style and IEP goals — right in their home.

This is a flexible, part-time W-2 employee role. Start with one student (~2–10 hrs/week) and take on additional students whenever you'd like to grow your hours and income.

What You'll Do
  • Lead engaging 1:1 sessions tailored to students with diverse learning needs
  • Implement creative lesson plans aligned to each student's IEP goals (full resources and support from our team)
  • Adapt academic materials to each student's unique learning profile
  • Track progress after each session and keep open, empathetic communication with parents and guardians
  • Foster a safe, inclusive environment that builds confidence and resilience
Who We're Looking For
  • AA, BA, or higher (Special Education, Psychology, or Education preferred)
  • Hands-on experience supporting students with special needs or learning differences (e.g., ASD, ADHD, Dyslexia) — currently enrolled college students with this experience are encouraged to apply
  • Empathy, patience, and a student-first approach
  • Reliable vehicle for local travel to client homes
  • Ability to pass a background check
  • Bilingual (Spanish/English) a strong plus — premium rates available for bilingual matches
Pay

$25–$35+ per hour, based on your credentials, specialization, and the needs of the student you're matched with. Most roles fall in the $25–$35+ range; higher rates apply for credentialed or specialized tutors, higher-need cases, and bilingual (Spanish/English) matches.

Why Join
  • Real impact: build lasting 1:1 bonds and help shape a student's trajectory
  • Support: specialized curriculum resources and a dedicated team for student matching
  • Perks: performance-based incentives, referral program, mileage, technology reimbursement, and the CalSavers retirement option

Ready to make a difference? Apply in a few minutes and we'll match you with a student near you.

Tutor Me Education is an Equal Opportunity Employer. We celebrate all neurotypes.

We may use artificial intelligence (AI) tools to support parts of the hiring process, such as reviewing applications, analyzing resumes, or assessing responses and identifying potential inconsistencies or verification signals in application materials based on available information. These tools assist our recruitment team but do not replace human judgment. Final hiring decisions are ultimately made by humans. If you would like more information about how your data is processed, please contact us.

  • AA, BA, or higher (Special Education, Psychology, or Education preferred)
  • Hands-on experience supporting students with special needs or learning differences (e.g., ASD, ADHD, Dyslexia) — currently enrolled college students with this experience are encouraged to apply
  • Able to commit to a student for the full school year. Consistency is central to a student's IEP progress, so we're looking for tutors who can build a lasting relationship rather than a short-term fill-in.
  • Empathy, patience, and a student-first approach
  • Reliable vehicle for local travel to client homes
  • Ability to pass a background check
  • Bilingual (Spanish/English) a strong plus — premium rates available for bilingual matches
  • Mileage
  • Technology Reimbursement
  • Performance Bonus Incentive
  • CalSavers Retirement Plan
Hol dir deinen kostenlosen, vertraulichen Lebenslauf-Check.

oder ziehe deine Datei hierhin.

Similar jobs

Ähnliche Jobs, die dir auch gefallen könnten

In-Home SPED Tutor - Flexible Part-Time 1:1 Impact
In-Home SPED Tutor - Flexible Part-Time 1:1 Impact

Tutor Me LA LLC • California

Vor Ort
USD 34.440 - 55.104
Performance-based incentives
Referral program
Mileage reimbursement
+2
In-Home SPED Tutor — Flexible 1:1 Impact
In-Home SPED Tutor — Flexible 1:1 Impact

Tutor Me LA LLC • California

Vor Ort
USD 34.440 - 48.216
Mileage reimbursement
Technology reimbursement
CalSavers retirement option
+2
In-Home SPED Tutor — Part-Time, Flexible Hours
In-Home SPED Tutor — Part-Time, Flexible Hours

Tutor Me Education LLC • Santa Monica (CA)

Vor Ort
PHP 2.114.180 - 2.959.852
Performance-based incentives
Referral program
Mileage reimbursement
+2
In-Home SPED Tutor (Flexible Hours, $25–$35+/hr, CA)
In-Home SPED Tutor (Flexible Hours, $25–$35+/hr, CA)

Tutor Me LA LLC • California

Hybrid
USD 34.440 - 48.216
Performance-based incentives
Referral program
Mileage reimbursement
+2
In-Home SPED Tutor | 1:1 Support & Flexible Hours
In-Home SPED Tutor | 1:1 Support & Flexible Hours

Tutor Me LA LLC • Coachella (CA)

Vor Ort
USD 34.440 - 48.216
Performance-based incentives
Referral program
Mileage reimbursement
+2
In-Home SPED Tutor — 1:1 Impact, Flexible Hours (CA)
In-Home SPED Tutor — 1:1 Impact, Flexible Hours (CA)

Tutor Me LA LLC • Daly City (CA)

Vor Ort
USD 34.440 - 48.216
Mileage reimbursement
Technology reimbursement
CalSavers retirement option
+2
In-Home SPED Tutor — Flexible 2–10 hrs/week (CA)
In-Home SPED Tutor — Flexible 2–10 hrs/week (CA)

Tutor Me LA LLC • Riverside (CA)

Hybrid
USD 34.440 - 48.216
Mileage reimbursement
Technology reimbursement
CalSavers retirement option
+2
SPED Tutor - Greater LA (West & San Gabriel Valley)
SPED Tutor - Greater LA (West & San Gabriel Valley)

Tutor Me Education • Beverly Hills (CA)

Vor Ort
USD 34.440 - 48.216
Performance Bonus Incentive
Mileage reimbursement
Technology reimbursement
+1
SPED Tutor - Greater LA (South & Southeast)
SPED Tutor - Greater LA (South & Southeast)

Tutor Me Education • Carson (CA)

Vor Ort
USD 34.000 - 48.000
Mileage reimbursement
Technology reimbursement
CalSavers Retirement Plan
+2
SPED Tutor - Inland Empire
SPED Tutor - Inland Empire

Tutor Me LA LLC • Joshua Tree (CA)

Vor Ort
USD 34.000 - 48.000
Mileage reimbursement
Technology reimbursement
Performance bonus incentive
+1