A complete application in a minute
Tailored resume and cover letter, ready to send.
AccentCare, Inc. is seeking a Home Health Occupational Therapist in Windsor, Colorado, to deliver comprehensive OT services for home health patients. The role requires a Master’s degree in Occupational Therapy, state licensure, and travel to assigned areas.
The position offers a full-time schedule (40 hours/week), with a typical 8-hour shift, and a compensation range of $100,000–$123,000 per year plus a $15,000 bonus paid per point basis. Applicable benefits are provided.
AccentCare, Inc. is seeking a Home Health Occupational Therapist in Windsor, Colorado, to deliver comprehensive OT services for home health patients. The role requires a Master’s degree in Occupational Therapy, state licensure, and travel to assigned areas.
The position offers a full-time schedule (40 hours/week), with a typical 8-hour shift, and a compensation range of $100,000–$123,000 per year plus a $15,000 bonus paid per point basis. Applicable benefits are provided.