A complete application in a minute
Tailored resume and cover letter, ready to send.
Fluidstack is building civilization-scale infrastructure for AI, delivering gigawatt-scale data centers and fast, scalable construction methods. You will lead on-site execution, sequencing trades, and removing blockers to keep crews productive and aligned with the project plan.
We value autonomy, urgency, and a rigorous, first-principles approach. This role requires travel and willingness to live where the work is, as projects span multiple sites and regions.
We exist to make humanity more free. For most of human history, you farmed or you starved. Technology gave people more time for the things they wanted to do, instead of things they had to do. Powerful AI will be the biggest lever for human choice we've ever built - but only if models are aligned with what humanity actually wants. There are groups building AI who don't share these goals. Whoever deploys frontier compute infrastructure fastest will decide whether AI expands human freedom or shrinks it.
We're singularly focused on delivering 10 to 100s of GWs of compute faster than anyone else, rethinking every layer of the stack. We acquire power, design and build data centers, and operate them - with teams spanning hardware and software. Speed and scale are our key differentiators. Come be a part of building civilization-scale infrastructure for AI.
We hire people who care deeply about this problem space. If that is you, please apply!
Be a barrel. Full autonomy. Own things end to end, take on scope without being asked, no permission required to operate outside your core role.
Insane urgency. We drive everything forward as fast as possible.
Reason from first principles. Challenge every assumption. Zero analogy thinking, no egos, the best idea wins.
Love of the game. The frontier of AI is the most interesting problem of our time. We put in long hours at high intensity to push the frontier forward.
Build something that actually matters. If you're going to spend your time, spend it on something that matters to the world.
Examples of key problems the team is working on
Put gigawatts in the ground, faster than anyone has. We're delivering one of the largest data center buildouts of its kind, with many sites running at once. Traditional construction management breaks at this scale, so we're building the model that replaces it.
Throw out traditional construction and invent how gigawatts get built. Tons of tools, layers of process, and administrative drag don't get you there. You'll strip all of that out and win by solving the real problem and beating the goal, not by managing toward it.
Productize the data center so we can build it a thousand times. You'll turn one-off construction into a repeatable, modular build, where the hundredth site goes up faster and cleaner than the first. That repeatability is the only way to reach the scale we're targeting.
Run the field on a gigawatt-scale data center build: sequencing, trade coordination, and daily production against the plan.
Walk the job daily and clear blockers before crews wait: RFIs, materials, access, inspections.
Enforce quality and safety standards at the workface, not from the trailer.
Coordinate with commissioning so systems complete in the order startup needs, not the order construction prefers.
The below is a starting point. We always make space for exceptional people, so if you don't fit this role exactly, tell us where you would.
You've superintended heavy industrial or mission critical construction and hit the dates.
You sequence trades in your head and spot a clash before it costs a day.
Inspectors and foremen both respect you, for different reasons.
You've closed out punch lists that stayed closed.
You'll travel and live where the work is.
Bonus: Data center MEP-heavy builds. Modular installation. OSHA 30. Commissioning handover experience.
Physical Requirements
Work in non-climate-controlled environments, including active construction areas, data halls, electrical and mechanical rooms, and outdoor spaces. Temperatures can be high or low, and conditions can be humid, loud or dusty.
Lift, carry, push and pull up to 40 pounds on your own.
Sit, stand, walk, kneel, bend and crouch for long periods, including full shifts on your feet.
Wear the required personal protective equipment (PPE), such as hard hats, safety glasses, steel-toed boots, gloves and hearing protection, and follow site safety rules.
Climb stairs and ladders, and move around equipment, cable trays and uneven surfaces.
We are committed to pay equity and transparency.
Fluidstack is an Equal Employment Opportunity Employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, sexual orientation, gender identity, disability and protected veterans’ status, or any other characteristic protected by law. Fluidstack will consider for employment qualified applicants with arrest and conviction records pursuant to applicable law.
Applicant Privacy Notice
AI Screening Notice
Ashby Bias Audit
You will receive a confirmation email once your application has successfully been accepted. If there is an error with your submission and you did not receive a confirmation email, please email careers@fluidstack.io with your resume/CV, the role you've applied for, and the date you submitted your application-- someone from our recruiting team will be in touch.