Engineering Change Order (ECO) Coordinator/Drafter II

ExactHire

Garden Grove, Northern (CA, KY)

Hybrid

USD 65,000 - 85,000

Full time

12 days ago
Application generator

Stand out for this role — generate a tailored resume and cover letter in about a minute.

Get past ATS filters

Job summary

ExactHire is seeking a CAD Drafter in California to produce detailed working plans and drawings for components and assemblies. You will collaborate with engineers and the manufacturing team, manage ECOs, and ensure accuracy of drawings and bills of materials.

The role requires 3–5 years CAD drafting experience, proficiency in SolidWorks and AutoCAD, and the ability to work from notes or sketches in a fast-paced setting.

Qualifications

  • High School diploma or GED plus relevant on-the-job experience.
  • 3–5 years CAD drafting experience with PLM systems.
  • 3–5 years of experience creating assembly drawings, BOMs, and ECOs.
  • Strong written and verbal communication; US citizenship required.

Responsibilities

  • Coordinate Engineering Change Orders (ECO) and chair Change Control Board (CCB).
  • Create assemblies and fabrication drawings (light to medium complexity) using SolidWorks and AutoCAD.
  • Check drawings and BOMs for accuracy and completeness.
  • Perform other duties as assigned.

Skills

CAD drafting
3D CAD drafting tools
Communication skills
Independent & collaborative work

Education

High School Diploma or GED

Tools

SolidWorks
AutoCAD
Arena PLM/Empower

Job description

Brief Description of Job Duties:

Under limited supervision, perform standard drafting assignments based on work orders provided. Make adjustments in drawings or specifications. Prepare working plans, detailed drawings, and complete mechanical or electrical drawings for components and assemblies. Works from notes, verbal instructions, and rough or detailed sketches for engineering or manufacturing purposes. Verify completed work and check dimensions, materials to be used, and quantities.

Primary duties include, but are not limited to:
  • Engineering Change Control Coordinator - Manage engineering changes (ECO) through the approval and release cycle using an online system. Duties also include chairing the weekly Change Control Board (CCB) meeting.
  • Drafting duties - Create Assemblies and Fabrication drawings (light to medium complexity) using SolidWorks and AutoCAD software.
  • Check drawings and BOM’s for correctness
  • Perform other duties as assigned.
JOB REQUIREMENTS

The applicant MUST have the following qualifications:

  • High School Diploma or equivalent (GED) combined with relevant on-the-job experience.
  • 3 to 5 years of experience in a CAD drafting environment using PLM systems.
  • 3 to 5 years of experience creating assembly drawings, fabrication drawings, Bills of Materials (BOM), and Engineering Change Orders (ECO).
  • 3 to 5 years of experience in CAD drafting environment working to the drafting room standard manual.
  • 3 to 5 years of experience working with 3D CAD drafting tools
  • Excellent oral and written communication skills with the ability to collaborate effectively with engineers, the manufacturing team, and cross-functional stakeholders.
  • U.S. citizenship is required.
Mental Qualifications:
  • Ability to interpret and visualize complex technical drawings and blueprints.
  • Strong attention to detail and spatial reasoning skills.
  • Proficient in problem-solving and critical thinking.
  • Capable of managing multiple projects and meeting deadlines.
  • Comfortable working independently and collaboratively with engineers.
  • Competency in using CAD software and other design tools.
Physical Qualifications:
  • Ability to sit at a desk or workstation for extended periods.
  • Manual dexterity sufficient for operating computer equipment and drafting tools.
  • Clear vision (with or without corrective lenses) for close-up design and reading technical documents.
  • Occasionally, may be required to walk through our manufacturing environment.
Additional Desirable Experience:
  • Strong organizational skills and attention to detail, ensuring accuracy, consistency, and efficiency in both computer-based and administrative tasks.
  • Experience using AutoCAD software to create, modify, and maintain technical drawings and engineering documentation.
  • Familiarity with Arena PLM/Empower systems for managing product lifecycle data, engineering changes, and documentation.
  • Knowledge of IPC standards and their application to engineering drawings, documentation, and manufacturing processes.
  • Experience working in a drafting room environment with an understanding of drafting standards, procedures, and best practices.

Please note this job description is not designed to cover or contain a comprehensive listing of activities, duties or responsibilities that are required of the employee for this job. Duties, responsibilities, and activities may change at any time with or without notice.

*Placement in pay range depends on: years of relevant CAD drafting experience, 3D drafting tools experience, any of the additional desirable experiences such as knowledge of IPC standards, etc.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Engineering Drafter
Engineering Drafter

Ducommun, Inc. • Carson (CA)

On-site
USD 34,000 - 48,000
Equal Opportunity Employer
Veterans/Disabled
Mechanical Drafter
Mechanical Drafter

CPV Manufacturing • Kennett Square

On-site
USD 60,000 - 80,000
Major medical
PTO and holidays
CAD Design Drafter II
CAD Design Drafter II

Levare USA • Tulsa (OK)

On-site
USD 60,000 - 90,000
Drafter
Drafter

Synapse ITS • Plano (TX)

On-site
USD 50,000 - 75,000
CAD Design Drafter II
CAD Design Drafter II

Levare U.S., Inc. • Tulsa (OK)

On-site
USD 55,000 - 85,000
CAD Designer 1
CAD Designer 1

EFCO Forming & Shoring Solutions • Phoenix (AZ)

On-site
USD 60,000 - 76,000
CAD Designer 1
CAD Designer 1

EFCO Corp. • Phoenix (AZ)

On-site
USD 42,000 - 64,000
CAD Designer
CAD Designer

The Planet Group • Milwaukee (WI)

On-site
USD 55,000 - 75,000
CAD Design Drafter II
CAD Design Drafter II

Levare • Tulsa (OK)

On-site
USD 50,000 - 80,000
CAD Designer 1
CAD Designer 1

EFCO • South Holland (IL)

On-site
USD 55,000 - 75,000