Electrical Engineer — Data Center Construction

Overwatch-Mission-Critical

De Soto (KS)

On-site

USD 90,000 - 140,000

Full time

8 days ago

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Benefits offered by this job

Health insurance
Dental insurance
Vision insurance
Life insurance
401(k) retirement plan
Paid time off

Job summary

Overwatch Mission Critical is seeking a mechanical/electrical design professional to support the construction and management of state-of-the-art data centers. You will apply knowledge of UPS, switchgear, batteries and generators, and work with design consultants to ensure specifications, safety, and arc-flash compliance.

Candidates should have 5+ years of relevant experience in design administration or construction administration, preferably in mission-critical systems.

Qualifications

  • 5+ years of experience in mechanical/electrical engineering, design administration, and/or construction administration.
  • Mission critical systems or complex elec/mech commercial/industrial systems.

Responsibilities

  • Strong knowledge of UPS, Battery, Switchgear and Generator systems from design, compliance and safety. Understanding specifications and arc flash studies as well as breaker coordination.
  • Detailed Design Coordination: Technical review and coordination
  • Design package reviews
  • Page turns
  • Technical input
  • Design decision trackers
  • OPR / PDG CDEs
  • Liaise with design consultants, customer discipline SMEs,

Skills

Mechanical engineering
Electrical engineering
Design administration
Construction administration
Communication skills

Education

Electrical Engineering degree

Job description

Overwatch Mission Critical is seeking a mechanical/electrical design professional to support the construction and management of state-of-the-art data centers. You will apply knowledge of UPS, switchgear, batteries and generators, and work with design consultants to ensure specifications, safety, and arc-flash compliance.

Candidates should have 5+ years of relevant experience in design administration or construction administration, preferably in mission-critical systems.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Onsite Electrical Project Manager - Data Center Builds
Onsite Electrical Project Manager - Data Center Builds

Overwatch-Mission-Critical • Barstow (TX)

On-site
USD 120,000 - 180,000
Health insurance
Dental insurance
Vision insurance
+3
Electrical Engineer
Electrical Engineer

Overwatch Mission Critical • De Soto (KS)

On-site
USD 90,000 - 140,000
Health insurance
Dental insurance
Vision insurance
+3
Electrical Engineer Assistant — Data Center Construction
Electrical Engineer Assistant — Data Center Construction

Overwatch-Mission-Critical • Midlothian (TX)

On-site
USD 90,000 - 130,000
Health insurance
Relocation assistance
Senior Electrical Engineer
Senior Electrical Engineer

Engineering-Resource-Group • Port Reading (NJ)

On-site
USD 90,000 - 120,000
Electrical Engineer
Electrical Engineer

Overwatch-Mission-Critical • Claremore (OK)

On-site
USD 90,000 - 130,000
Health insurance
Dental insurance
Vision insurance
+3
Electrical Engineer, Data Center
Electrical Engineer, Data Center

Blue Signal Search • San Francisco (CA)

On-site
USD 120,000 - 180,000
Competitive base compensation
Exposure to full lifecycle projects
Cross-disciplinary collaboration
+2
Electrical Design Engineer
Electrical Design Engineer

Daksta • United States

Remote
USD 120,000 - 200,000
Bonus
Benefits
Senior Design Manager, Data Center Construction
Senior Design Manager, Data Center Construction

Overwatch-Mission-Critical • Irving (TX)

On-site
USD 120,000 - 180,000
Health insurance
Dental insurance
Vision insurance
+3
Data Center Electrical Engineer: Mission-Critical Design
Data Center Electrical Engineer: Mission-Critical Design

NV5 • Nevada

On-site
USD 90,000 - 130,000
Medical, dental, and life insurance
401(k) plan
PTO and paid holidays
+1
Electrical Project Engineer for Data Center
Electrical Project Engineer for Data Center

INT Technologies • Denver (CO)

On-site
USD 85,000 - 110,000
Health insurance
401(k) plan
Generous paid time off