Earned Value Management System (EVMS) Compliance Lead Engineer

Ingenium Professional Services

Richland (WA)

On-site

USD 120,000 - 160,000

Full time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Benefits offered by this job

Medical/Dental/Vision Insurance
401K
Life Insurance
Disability
PTO
Parental Leave
Military leave

Job summary

A leading engineering firm is seeking a Compliance Lead Engineer for the Earned Value Management System (EVMS). The role involves supporting compliance assessments, leading project teams, and ensuring deliverables meet contractual requirements. Candidates should have a strong background in EVMS, cost engineering, and excellent communication skills. Preferred qualifications include experience with Primavera P6 and Cobra. This position offers a flexible work schedule with remote options and comprehensive benefits.

Qualifications

  • Possess the legal right to work in the U.S. without sponsorship.
  • Able to pass a drug screen and background check.
  • Demonstrated knowledge of Earned Value Management.
  • Demonstrated knowledge of Earned Value Management subject matter.
  • Experience in cost engineering activities including estimating, cost control, and cost analysis.
  • Proven project experience as a cost engineer and/or scheduler.
  • Proficiency in PC operating systems and Excel, Word, and PowerPoint.
  • Strong oral and written communication and briefing skills.

Responsibilities

  • Support the development of the project EVMS Description.
  • Act as point-of-contact for external EVMS assessments.
  • Develop training classes and mentor project personnel.
  • Lead for external EVMS assessments and EIA-748-related matters.
  • Support development of EVMS data collection and summarization structures.
  • Ensure EVMS contract deliverables meet contractual requirements.
  • Lead efforts to resolve EVMS discrepancies from reviews.
  • Develop training and mentor personnel on EVMS best practices.
  • Coordinate EVMS process changes across project organizations.
  • Review CAM Notebook, storyboards, WADs, and PAD for compliance.

Skills

Knowledge of Earned Value Management
Cost engineering
Oral and written communication
Communication
Microsoft Office

Education

Experience in cost engineering functions
U.S. government certified EVMS experience

Tools

Primavera P6
Cobra
Microsoft Excel
Microsoft Word
Microsoft PowerPoint

Job description

Earned Value Management System (EVMS) Compliance Lead Engineer

Job Openings Earned Value Management System (EVMS) Compliance Lead Engineer

About the job Earned Value Management System (EVMS) Compliance Lead Engineer
Company Description

Ingenium Professional Services Inc. is a nationally recognized, award-winning, certified Service-Disabled Veteran-Owned Small Business. Ingenium's Corporate Headquarters is in Oak Ridge, Tennessee. Ingenium holds experience in project management, process improvement, facility operations, engineering and design, environmental engineering, and construction management.

Ingenium Professional Services is the preferred partner for customers worldwide for engineering and environmental technical services by building long-term relationships founded on trust and respect. Ingenium Professional Services provide the best in business and technology solutions to companies such as the U.S. Department of Energy, ORNL Oak Ridge National Laboratory, LANL Los Alamos National Laboratory, U.S. Army Corps of Engineers, and Energy Solutions to name only a few.

Job Description

Responsibilities:

  • Support the development and maintenance of the project Earned Value Management System Description and applicable project procedures.
  • Provide leadership, guidance, and direction to all affected personnel (Senior Management, Area Project Managers, Control Account Managers (CAMs), Project Controls Engineers, and other support personnel) to assure that they are sufficiently knowledgeable of Earned Value Management System (EVMS) requirements, processes, procedures and reporting to execute their work scope in full compliance with contractual requirements.
  • Maintain and execute a documented EVMS compliance assessment process to ensure full compliance with contractual requirements.
  • Act as the point-of-contact and lead for external EVMS assessments or matters related to the EIA-748 EVMS Standard.
  • Provide support for the development of EVMS data collection and summarization structures needed to satisfy internal and customer assessment requirements.
  • Ensure EVMS contract deliverables are accurate and developed in compliance with contractual requirements.
  • Lead project efforts to resolve EVMS discrepancies identified through internal and external reviews.
  • Develop and keep current training classes, mentor project personnel, and provide program oversight for establishing EVMS best practices.
  • Coordinate with all affected project organizations/functions regarding the implementation of the project earned value management process and procedure changes.
  • Review the CAM Notebook webpage, storyboards that flow chart EVMS work processes, Work Authorization Documents (WADs), and Project Authorization Document (PAD) and ensure they are all kept current with compliance requirements.
  • Provide oversight for the baseline change process.
  • Provide support for variance analysis and corrective actions.
  • Review and support the ongoing updates to EVMS metrics.
  • Carry out supervisory responsibilities in accordance with the Company's policies, procedures, and applicable laws.

This is a long-term assignment with a 9-80’s work schedule. The work hours are from 7:00 am – 4:30 pm Monday – Thursday and 7:00 am – 3:30 pm every other Friday. Flex Schedule options are available within a prescribed range. The position will initially be executed via remote work location/telework until the relocation is feasible.

Qualifications

Basic Qualifications

  • Possess the legal right to work and remain in the United States without sponsorship.
  • Must be able to complete and pass a pre-employment drug screen and background check including verification of employment, education, and travel.
  • Requires understanding of US government certified EVMS, deliverable content, issue identification/resolution, etc.
  • Demonstrated knowledge of Earned Value Management subject matter required.
  • Experience in performing, monitoring, or reviewing cost engineering functions, which include cost estimating, cost control, and cost analysis, in the field and the home office.
  • Proven project experience as a cost engineer and/or scheduler.
  • Proficiency in using PC operating systems and several basic software applications such as Excel, Word, and PowerPoint.
  • Skilled in oral and written communication, and providing management briefings.

Preferred requirements:

  • Multiple years US government certified Earned Value Management System experience.
  • Working knowledge of Primavera P6 and Cobra.
  • Flexibility to respond to urgent project requests and/or changing priorities.
  • Ability to work under pressure and with minimal supervision.
  • Demonstrated ability to work effectively across project organizations.
Additional information

Ingenium Professional Services is an Equal Opportunity Employer. Ingenium Professional Services does not discriminate on the basis of race, religion, color, sex, gender identity, sexual orientation, age, non-disqualifying physical or mental disability, veteran status, or any other basis covered by appropriate law. All employment is decided on the basis of qualifications, merit, and business need. All your information will be kept confidential according to EEO guidelines.

We offer benefits such as Medical/Dental/Vision Insurance, 401K, Life Insurance, Disability, PTO, Parental Leave, and Military leave. We treat our employees like family. You will never have to worry about an assignment ending and not having the choice of your next assignment.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Sr Eng III-EVMS Compliance Lead NS&E
Sr Eng III-EVMS Compliance Lead NS&E

Ingenium Professional Services • Richland (WA)

On-site
USD 85,000 - 115,000
Medical/Dental/Vision Insurance
401K
Life Insurance
+4
Earned Value Management SME
Earned Value Management SME

Insight Global • Fall River (MA)

On-site
USD 100,000 - 130,000
Eng III-Systems Engineer NS&E
Eng III-Systems Engineer NS&E

Ingenium Professional Services • Oak Ridge (TN)

On-site
USD 90,000 - 130,000
Medical/Dental/Vision Insurance
401K
Life Insurance
+6
Project Controls/EVMS Analyst
Project Controls/EVMS Analyst

Signature Science, LLC • Arlington (VA)

On-site
USD 110,000 - 150,000
PlannerScheduler Estimator
PlannerScheduler Estimator

Pinnacle Specialty Group, Inc. • Los Alamos (NM)

On-site
USD 90,000 - 130,000
Medical
Dental
Vision
+2
EVM Subject Matter Expert
EVM Subject Matter Expert

ARES Corporation • United States

On-site
USD 120,000 - 180,000
Medical Insurance
Vision Insurance
HSA/FSA Accounts
+5
Sr. EVMS Analyst
Sr. EVMS Analyst

Leidos • Huntsville (AL)

On-site
USD 92,000 - 167,000
Project Scheduler - Earned Value Management (EVM) Experience Required
Project Scheduler - Earned Value Management (EVM) Experience Required

Akima • Huntsville (AL)

Hybrid
USD 95,000 - 135,000
Earned Value Program Control Analyst
Earned Value Program Control Analyst

CACI • Denver (CO)

On-site
USD 82,000 - 172,000
Healthcare
Wellness programs
Retirement benefits
+1
Project Controls 4 (EVMS)
Project Controls 4 (EVMS)

Edgewater Technical Associates, LLC • Los Alamos (NM)

On-site
USD 120,000 - 170,000
Per Diem Available