Don’t send a generic resume — generate a resume and cover letter tailored to this exact role.
Christensen Stucco is hiring a Deck Builder with Trex specialization in the United States. You will perform ledger flashing, structural framing, Trex decking, and railing installations to manufacturer standards.
Expect a hands-on role with a strong emphasis on accuracy, safety with power tools, and finishing quality that families will enjoy for decades. Strong preference for deck-building or residential framing experience.
$22–$38
Composite decks that last 25 years and look incredible. Proper ledger flashing, structural framing, Trex composite decking, and railing systems. Build something families will use for decades.
Deck building at Christensen Stucco means building Trex composite decks to manufacturer standards — proper ledger flashing, structural framing, composite decking, and custom railing systems.
7:00 AM
Review Plans and Layout
Dallas reviews the deck design with the crew. Dimensions, railing style, access points, special features. You know the finished product before you drive the first screw.
8:00 AM
Ledger and Footings
Ledger board installation with proper flashing — this is the most critical step. A ledger that allows water infiltration destroys the house framing. Dallas inspects every ledger personally.
9:30 AM
Post and Beam Framing
Set posts, install beams, frame the deck structure. Level and square — everything downstream depends on the framing being right. Dallas checks with a level at every stage.
11:00 AM
Install joists at proper spacing for Trex composite. Blocking at ends and mid-span. Hidden fastener system requires precise joist spacing — you learn to work to tight tolerances.
1:00 PM
Trex Decking
Trex composite decking with hidden fasteners. Consistent spacing, proper end cuts, clean board-to-board transitions. Trex looks best when it's installed to exact manufacturer spec.
3:00 PM
Railing Systems
Aluminum railing, cable railing, or Trex composite railing. Post spacing, top and bottom rail, baluster installation. The railing is what people notice first — it needs to be perfect.
Deck building experience is strongly preferred. Framing skills and comfort with power tools are essential.
Previous deck building or residential framing experience strongly preferred.
Miter saw, circular saw, drill, framing nailer. You need to be comfortable and safe with all of them.
You need to understand why ledger flashing matters, why post spacing matters, why the framing has to be right. Not just how to do it — why.
Decks are visible — homeowners look at them every day. The work needs to look as good as it performs.
Deck layout involves a lot of measurement and calculation. You need to be comfortable with numbers.
Carrying lumber, concrete, and heavy materials. This is physical work.
Most contractor jobs mean working for whoever showed up today. At Christensen Stucco you work for Dallas — one owner, one crew, one standard. That means something.
$22–$38 / Hour
Paid based on your actual skill level. Dallas doesn't lowball good people.
No seasonal layoffs. Dallas keeps his crew working 12 months a year.
Learn From a Master
50 years of stucco knowledge. Most crews never get this kind of training.
Real Crew — No Subs
You're a Christensen crew member — not a day laborer. That's a different thing.
Quality Work You're Proud Of
Dallas doesn't cut corners. You'll build things that last 40 years and know it.
Direct Access to Dallas
No HR department. No middle management. You work directly with the owner.
From Dallas
A deck built right lasts 25 years and becomes the family's favorite place in the summer. A deck built wrong fails at the ledger inside of 5 years and costs the homeowner twice as much to fix. I build decks that last — and I want crew members who understand why that difference matters.
Know someone who'd be a good fit for a different role? Send them here.