Data Center Construction Technician — Travel & Training

Garrett Electric Company

Richland (WA)

Híbrido

USD 25.000 - 59.000

Jornada completa

Hace 4 días
Sé de los primeros/as/es en solicitar esta vacante

Consigue una respuesta de este empleador

Tu currículum y tu carta de presentación, adaptados exactamente a lo que buscan contratar.

Supera los filtros ATS

Ventajas ofrecidas por este puesto de trabajo

Employer-paid medical, dental, vision,
Life and disability insurance
401(k) match up to 5%

Descripción de la vacante

Garrett Electric is seeking a Full-Time Data Center Construction Technician to join our on-site team on large data center projects. You will install engineered support systems, read drawings, and coordinate with journeyman electricians across North America.

The role requires physical capability, willingness to travel, and comfort with heights in active construction environments. Competitive pay and comprehensive benefits accompany hands-on training and growth opportunities.

Formación

  • Construction experience preferred but not required.
  • Strong work ethic and willingness to learn.
  • Mechanical aptitude and ability to work with hand and power tools.
  • Comfortable working at heights and in active construction environments.
  • Ability to lift 50 pounds.
  • Willingness to travel for projects.
  • Reliable, team-oriented, and able to work in a fast-paced environment.

Responsabilidades

  • Install engineered support systems for electrical infrastructure.
  • Read and interpret construction drawings and layouts.
  • Install anchors, structural hardware, and support assemblies.
  • Build Unistrut, trapeze, and custom support systems.
  • Install firestop systems in walls, floors, and penetrations.
  • Perform layout using lasers, measuring tools, and construction drawings.
  • Dig and prepare trenches or excavations as needed for installations.
  • Operate aerial lifts and other jobsite equipment safely.
  • Maintain a clean, organized, and professional work area.
  • Coordinate with journeyman electricians and other construction trades.
  • Follow company safety standards and quality expectations.
  • Assist with material handling, staging, and job site organization.

Conocimientos

Mechanical aptitude
Team oriented
Lift 50 lbs
Willing to travel
Comfortable at heights

Descripción del empleo

Garrett Electric is seeking a Full-Time Data Center Construction Technician to join our on-site team on large data center projects. You will install engineered support systems, read drawings, and coordinate with journeyman electricians across North America.

The role requires physical capability, willingness to travel, and comfort with heights in active construction environments. Competitive pay and comprehensive benefits accompany hands-on training and growth opportunities.

Consigue la evaluación confidencial y gratuita de tu currículum.

o arrastra y suelta tu archivo aquí

Similar jobs

Puestos de trabajo similares que vale la pena comparar

Data Center Infrastructure Technician
Data Center Infrastructure Technician

Garrett Electric Company • Richland (WA)

Híbrido
USD 25.000 - 59.000
Employer-paid medical, dental, vision,
Life and disability insurance
401(k) match up to 5%
Data Center Water Treatment Technician — Remote & Travel
Data Center Water Treatment Technician — Remote & Travel

Garratt-Callahan Company • Indianapolis (IN)

Presencial
USD 80.000 - 100.000
401k
Health insurance
Dental insurance
+2
Data Center Construction: Traveling Electrical Foreman Lead
Data Center Construction: Traveling Electrical Foreman Lead

Jset • Atlanta (GA)

Presencial
USD 90.000 - 125.000
Competitive compensation
Performance-based bonus opportunities
Company-paid travel
+6
Senior Electrical Technician — Data Center Infrastructure
Senior Electrical Technician — Data Center Infrastructure

Core Scientific, Inc • Auburn (AL)

Presencial
USD 65.000 - 90.000
Data Center Field Technician - Build, Install & Learn
Data Center Field Technician - Build, Install & Learn

TechnoGuard, Inc. • Sterling (VA)

Híbrido
USD 28.000 - 34.000
Paid training
Travel opportunities with per diem
Traveling Electrical Foreman - Data Center Construction
Traveling Electrical Foreman - Data Center Construction

Jset • Fort Worth (TX)

Presencial
USD 90.000 - 125.000
Competitive Compensation
Bonus Opportunities
Company-Paid Travel
+3
Senior Field Technician: Data Center Construction
Senior Field Technician: Data Center Construction

Schnabel Engineering • Owings Mills (MD)

Presencial
USD 41.000 - 62.000
Medical insurance
Dental insurance
Flexible spending accounts
+9
Traveling Electrical Foreman – Data Center Construction
Traveling Electrical Foreman – Data Center Construction

JSET Automated Technologies LLC • Fort Worth (TX)

Presencial
USD 70.000 - 110.000
Competitive Compensation
Performance-Based Bonus Opportunities
Company-Paid Travel
+6
Data Center Technician (Entry Level)
Data Center Technician (Entry Level)

StarTech Networks Inc. • Atlanta (GA)

Presencial
USD 42.000 - 64.000
Data Center Technician I - Entry Level (Travel)
Data Center Technician I - Entry Level (Travel)

Equiliem • Sterling (VA)

Presencial
USD 28.000 - 34.000
Medical Insurance
Vision & Dental Insurance
Life Insurance
+4