Data Center Construction Tech Specialist (VDC/BIM)

PCL Construction

Abilene (TX)

Vor Ort

USD 75.000 - 110.000

Vollzeit

vor 30 Stunden
Sei unter den ersten Bewerbenden

Erhalte eine Antwort von diesem Arbeitgeber

Dein Lebenslauf und dein Anschreiben, genau auf das zugeschnitten, was gesucht wird.

Schaffe es an den ATS-Filtern vorbei

Benefits dieser Stelle

Employee ownership opportunities
Annual discretionary bonuses
401(k) with company match
Medical, dental and vision benefits
Life, AD&D and disability insurance

Zusammenfassung

PCL Digital Infrastructure, Inc. seeks an Integrated Construction Technology Specialist in Abilene, TX to support a growing data center business line.

You will build and validate virtual models, coordinate trade deliverables, and work with estimating on model compliance and BIM execution plans. The role emphasizes adoption of PCL technologies, cross-functional collaboration, and delivering integrated construction solutions within a national scale program.

Qualifikationen

  • Bachelor's degree or higher in a buildings-industry field (AEC, civil, architectural, etc.).
  • 2–4 years in construction-related fields, with 1–2 years in Virtual Design and Construction.
  • Understanding of construction sequences and processes.
  • Ability to translate 2D drawings into 3D/4D BIM models under supervision.
  • Proficiency in 3D modeling and ability to create content in VDC software.

Aufgaben

  • Builds, reviews, or validates virtual models from plans, specs, and elevations.
  • Collaborates on development of construction-site logistics models.
  • Supervises coordination and management of trade detailing and design deliverables.
  • Promotes and applies VDC tools and processes to projects.

Kenntnisse

Reading 2D drawings
Reading 3D drawings
Construction sequencing

Ausbildung

Bachelor's degree in AEC or related field

Tools

3D modeling software
VDC software
4D scheduling tools

Jobbeschreibung

PCL Digital Infrastructure, Inc. seeks an Integrated Construction Technology Specialist in Abilene, TX to support a growing data center business line.

You will build and validate virtual models, coordinate trade deliverables, and work with estimating on model compliance and BIM execution plans. The role emphasizes adoption of PCL technologies, cross-functional collaboration, and delivering integrated construction solutions within a national scale program.

Hol dir deinen kostenlosen, vertraulichen Lebenslauf-Check.

oder ziehe deine Datei hierhin.

Similar jobs

Ähnliche Jobs, die dir auch gefallen könnten

BIM & VDC Implementation Lead
BIM & VDC Implementation Lead

PCL Construction, Inc. • Phoenix (AZ)

Vor Ort
USD 70.000 - 100.000
VDC & BIM Specialist — Construction Tech Lead
VDC & BIM Specialist — Construction Tech Lead

PCL Construction, Inc. • Minneapolis (MN)

Vor Ort
USD 82.000 - 95.000
Competitive wages
Benefits program
Training through PCL College of Constr
+1
Integrated Construction Technology Specialist
Integrated Construction Technology Specialist

PCL Construction • Abilene (TX)

Vor Ort
USD 75.000 - 110.000
Employee ownership opportunities
Annual discretionary bonuses
401(k) with company match
+2
VDC Engineer - BIM & Construction Tech Lead
VDC Engineer - BIM & Construction Tech Lead

PCL Constructors Inc. • Arizona

Vor Ort
USD 90.000 - 120.000
Competitive wages and benefits
Mental health and wellness support
Award-winning employer focus on people
+3
Integrated Construction Technology Specialist
Integrated Construction Technology Specialist

PCL Construction, Inc. • Phoenix (AZ)

Vor Ort
USD 70.000 - 100.000
Field Engineer Student: Hands-On Data Center Experience
Field Engineer Student: Hands-On Data Center Experience

PCL Construction • Abilene (TX)

Vor Ort
USD 27.000 - 36.000
Virtual Construction Manager: Lead VDC/BIM for Data Centers
Virtual Construction Manager: Lead VDC/BIM for Data Centers

Adolfson & Peterson Inc. • Alexandria (VA)

Vor Ort
USD 104.000 - 172.000
Medical, Dental, Vision & Life
401(k)
Tuition Assistance
+1
VDC Engineer – Data Center BIM & 4D Modeling
VDC Engineer – Data Center BIM & 4D Modeling

EPI Power • San Marcos (TX)

Vor Ort
USD 85.000 - 125.000
Data Center BIM Designer | VDC Specialist
Data Center BIM Designer | VDC Specialist

Amazon Web Services (AWS) • Austin (TX)

Vor Ort
USD 97.000 - 160.000
VDC Engineer: Lead BIM & 4D Planning on Arizona Projects
VDC Engineer: Lead BIM & 4D Planning on Arizona Projects

PCL Construction, Inc. • Arizona

Vor Ort
USD 90.000 - 120.000
Competitive wages
Benefits program (mental health & well
Awards & recognition