A complete application in a minute
Tailored resume and cover letter, ready to send.
Crux AI is building integrated AI infrastructure in the United States to remove constraints on consequential AI ambitions. This role leads construction for Crux data center projects, accountable for safety, quality, schedule milestones, forecast accuracy, and cost through GMP and closeout.
You will manage general contractors and trade partners on fast-track, high-density builds and fit-outs, including work inside third-party powered shells.
Crux AI is a newly formed, U.S.-based integrated AI infrastructure company created to remove the physical and operational constraints on consequential AI ambitions. Crux brings together power, high-density data centers, TPU silicon, networking, orchestration software, and ongoing operations as one integrated system.
Crux is being capitalized to plan every layer together, develop each one to demanding standards, and operate the whole system with efficiency and reliability. That gives hyperscalers, frontier AI labs, sovereign customers, enterprises, and AI-native companies greater freedom to pursue the AI they are here to create.
You will be the owner’s construction leader for Crux data center projects — accountable for safety, quality, schedule milestones, forecast accuracy, and cost through GMP and closeout. You will manage general contractors, key trade partners, and owner-furnished equipment on fast-track, high-density builds and fit-outs, including work inside third-party powered shells. Speed to first power and first cluster is the product; your job is to buy schedule intelligently, protect it ruthlessly, and hand operations a building that commissions clean. You will also help set the construction playbook — contracting strategy, prefabrication approach, reporting cadence — that the next projects inherit.
Own onsite execution for one or more projects: safety program, quality program, schedule milestones, and weekly project reporting (financial, schedule, quality) to the executive team.
Manage GC and trade partner relationships — buyout, change order negotiation, forecast accuracy, and claims avoidance — and manage tenant-improvement work when building inside partner shells.
Track and drive the external dependencies that actually move data center schedules — utility energization, permitting and inspections, easements, long-lead equipment, and GC mobilization — treating each as a gated milestone with its own owner and remedy, not a line buried in the P6.
Own owner-furnished equipment through the site: procurement coordination, delivery logistics, storage, installation sequencing, and vendor QA/QC for switchgear, generators, cooling plant, and TPU infrastructure.
Run cost discipline the way an owner should: separate elected scope adds (schedule buys, capacity pull-ins) from market-driven cost movement in every forecast, with the decision record to defend both.
Drive schedule levers that reduce field labor in constrained markets — prefabricated skids, power modules, and cooling assemblies — and hold designs accountable for field labor content in constructability reviews.
Lead the construction-to-commissioning-to-operations handoff: commissioning support through Level 5/IST, punch list burn-down, first-time-right turnover packages, and warranty management in live facilities.
You will have the first power and first cluster delivered on or ahead of committed dates; closeout and warranty clean
Your project playbook (contracting, prefab, reporting) is adopted as the template for the next builds.
10+ years in construction management of large technical projects, including ground-up greenfield delivery, with direct data center experience strongly preferred; deep working knowledge of electrical and mechanical systems, codes, and fire protection.
Owner-side or owner’s-rep accountability for safety, quality, schedule, GMP accuracy, and change order negotiation on projects of $250M+
Fast-track delivery experience — schedule acceleration decisions, prefabrication strategies, and construction inside or around live/partner facilities.
Outcome driven and hands‑on leadership. This is a builder’s seat, not a supervisory one. You walk the site, read the contracts, and sit in the schedule sessions — close enough to the work to know when something is off before it shows up in a report.
Commercially sharp without being adversarial. You get to fair outcomes on change orders and claims while keeping the GC leaning in — the next project depends on the same market.
High tolerance for ambiguity. Design will still be moving, the supply chain will surprise you, and the customer date will not move. You absorb that and convert it into clear near‑term direction for the site rather than passing the chaos downstream.
Schedule realism over schedule theater. You forecast as a range anchored on external‑dependency risk, give early signal on the sites carrying it, and never average bad news into a healthy‑looking portfolio number.
AI‑agentic first. Fluent with AI agents — or committed to becoming so quickly — and you embed them as first principles in how you and your team work, defaulting to agentic workflows before adding headcount or process.
High‑density AI/HPC build experience (liquid cooling, 100kW+ racks, large UPS/generator plants).
Experience delivering fit‑outs inside third‑party powered shells or colo partner facilities.
Procore/ACC/Unifier or similar project controls stack fluency.
Commissioning management exposure (Levels 1–5, IST) on mission‑critical projects.
Experience at a hyperscaler or neocloud during a multi‑site construction ramp.
The annual salary range for this position has been estimated based on market data and other factors. However, a salary higher or lower than this range may be appropriate for a candidate whose qualifications differ meaningfully from those listed in the job description.
We offer generous base, bonus and additional incentive based compensation
Health, dental, and vision coverage for you and your dependents
Company‑paid life insurance and disability
Full suite of other optional benefits
401(k) Plan with 4% company match (USA employees)