Data Center Construction Installer — Travel Ready

MCIS Inc

Marietta (GA)

On-site

USD 23,000 - 32,000

Full time

14 days+
Application generator

An application made for this job — a tailored resume and cover letter that speak straight to the posting.

Get past ATS filters

Benefits offered by this job

Competitive benefits package

Job summary

MCIS Inc is hiring multiple Installation Department team members to perform the physical demands typical of commercial construction job sites. You will safely operate hand and power tools to install raised flooring and high-density ceiling grid systems, with occasional travel and extended work periods as required.

We value integrity, reliability, punctuality, and a strong work ethic, and offer a competitive benefits package in a supportive, family-oriented culture.

Qualifications

  • Must be a U.S. Citizen or authorized to work in the U.S.
  • Willingness to travel for extended periods (up to 4-6 months at a time, if required)
  • Previous construction experience
  • Experience installing tile or drop-down acoustic ceiling grids is a plus
  • Ability to perform physical labor on active construction sites
  • Candidates may be subject to background checks and drug testing, depending on project site requirements

Responsibilities

  • Work alongside contractors and other construction professionals on job sites
  • Install raised flooring systems in various environments
  • Install high-density ceiling grid systems in different settings
  • Use specialized tools provided by MCIS
  • Glue and nail floor coverings into place
  • Maintain clean and safe work areas related to assigned tasks
  • Perform additional duties within your trade as assigned by the Senior Superintendent or Project Manager
  • Work overtime or weekends as required based on job site needs

Skills

Tool operation
Safety awareness
Physical stamina

Tools

Hand tools
Power tools
Ceiling grid tools

Job description

MCIS Inc is hiring multiple Installation Department team members to perform the physical demands typical of commercial construction job sites. You will safely operate hand and power tools to install raised flooring and high-density ceiling grid systems, with occasional travel and extended work periods as required.

We value integrity, reliability, punctuality, and a strong work ethic, and offer a competitive benefits package in a supportive, family-oriented culture.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Construction Installer
Construction Installer

MCIS Inc • Marietta (GA)

On-site
USD 23,000 - 32,000
Competitive benefits package
Construction Installer
Construction Installer

MCIS Inc • Phoenix (AZ)

On-site
USD 42,000 - 62,000
Weekly pay
Health, dental, and vision insurance
Paid time off
+2
Hands-On Interior Construction Installer (Flooring & Ceilings)
Hands-On Interior Construction Installer (Flooring & Ceilings)

MCIS Inc • Cedar Rapids (IA)

On-site
USD 26,000 - 36,000
Weekly pay every Friday
Health, dental, and vision insurance
Paid time off
+2
Construction Installer
Construction Installer

MCIS Inc • Cedar Rapids (IA)

On-site
USD 26,000 - 36,000
Weekly pay every Friday
Health, dental, and vision insurance
Paid time off
+2
Construction Installer – Flooring & Ceilings | Growth & PTO
Construction Installer – Flooring & Ceilings | Growth & PTO

MCIS Inc • Dallas (TX)

On-site
USD 23,000 - 32,000
Weekly pay
Health insurance
Paid time off
+1
Construction Installer
Construction Installer

MCIS Inc • Salt Lake City (UT)

On-site
USD 28,000 - 30,000
Weekly pay
Health insurance
Dental insurance
+4
Interior Construction Installer: Raised Floors & Ceilings
Interior Construction Installer: Raised Floors & Ceilings

mcis (marshfield clinic information services) • Temple (TX)

On-site
USD 23,000 - 32,000
Weekly pay
Health insurance
Dental insurance
+4
Construction Installer
Construction Installer

mcis (marshfield clinic information services) • Meridian (MS)

On-site
USD 28,000 - 34,000
Weekly pay
Health, dental, and vision insurance
Paid time off
+2
Data Center Installer
Data Center Installer

Essel • Meridian (MS)

On-site
USD 35,000 - 52,000
Competitive pay
Training provided
Safety-focused environment
Construction Installer
Construction Installer

MCIS Inc • Dallas (TX)

On-site
USD 23,000 - 32,000
Weekly pay
Health insurance
Paid time off
+1