Data Center Construction Installer (Field Role & Travel)

MCIS Inc

Temple (TX)

On-site

USD 42,000 - 52,000

Full time

14 days+
Application generator

Don’t send a generic resume — generate a resume and cover letter tailored to this exact role.

Get past ATS filters

Benefits offered by this job

Competitive benefits package
Weekly pay

Job summary

MCIS Inc in Temple, TX is hiring multiple Installation Department teammates to perform the physical duties on commercial construction sites, including installing raised flooring and high-density ceiling grids. Travel for extended periods (up to 4–6 months) may be required, and PPE must be worn.

This is a full-time, on-site role with a guaranteed 40 hours per week and weekly pay. Starting wage is $22.00 per hour, and a competitive benefits package is included; overtime and weekend work are common

Qualifications

  • U.S. citizenship or legal work authorization.
  • Willingness to travel up to 4–6 months at a time.
  • Experience in construction preferred.
  • Able to perform physical labor on active sites.
  • Background checks and drug testing may be required.

Responsibilities

  • Work with contractors and other construction professionals on job sites.
  • Install raised flooring systems in various environments.
  • Install high-density ceiling grid systems in different settings.
  • Use MCIS-provided tools.
  • Glue and nail floor coverings into place.
  • Maintain clean and safe work areas.
  • Perform additional duties as assigned by Senior Superintendent or Project Manager.
  • Work overtime or weekends as required.

Skills

Safety awareness
Tool operation
Physical stamina
Reliability

Tools

Hand tools
Power tools
Tile installation tools
Ceiling grid installation tools

Job description

MCIS Inc in Temple, TX is hiring multiple Installation Department teammates to perform the physical duties on commercial construction sites, including installing raised flooring and high-density ceiling grids. Travel for extended periods (up to 4–6 months) may be required, and PPE must be worn.

This is a full-time, on-site role with a guaranteed 40 hours per week and weekly pay. Starting wage is $22.00 per hour, and a competitive benefits package is included; overtime and weekend work are common

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Construction Installer
Construction Installer

MCIS Inc • Temple (TX)

On-site
USD 42,000 - 52,000
Competitive benefits package
Weekly pay
Construction Installer
Construction Installer

mcis (marshfield clinic information services) • Marietta (GA)

On-site
USD 28,000 - 39,000
Benefits package
Construction Installer: Raised Floors & Ceiling Grids
Construction Installer: Raised Floors & Ceiling Grids

mcis (marshfield clinic information services) • Marietta (GA)

On-site
USD 28,000 - 39,000
Benefits package
Interior Construction Installer: Raised Floors & Ceilings
Interior Construction Installer: Raised Floors & Ceilings

mcis (marshfield clinic information services) • Temple (TX)

On-site
USD 23,000 - 32,000
Weekly pay
Health insurance
Dental insurance
+4
Traveling Interior Construction Installer
Traveling Interior Construction Installer

MCIS Inc • Phoenix (AZ)

On-site
USD 28,000 - 34,000
Weekly pay
Health, dental, and vision insurance
Paid time off
+2
Construction Installer
Construction Installer

Mission Critical Interior Solutions, Inc. • Phoenix (AZ)

On-site
USD 28,000 - 33,000
Health insurance
Dental insurance
Vision insurance
+2
Construction Installer
Construction Installer

MCIS Inc • Phoenix (AZ)

On-site
USD 28,000 - 34,000
Weekly pay
Health, dental, and vision insurance
Paid time off
+2
Data Center Installers (Max $30/hr W2)
Data Center Installers (Max $30/hr W2)

Lenmar Consulting • Branchburg Township (NJ)

On-site
USD 45,000 - 75,000
Construction Installer
Construction Installer

mcis (marshfield clinic information services) • Temple (TX)

On-site
USD 23,000 - 32,000
Weekly pay
Health insurance
Dental insurance
+4
Travel-Ready Field Equipment Installer (Data Centers)
Travel-Ready Field Equipment Installer (Data Centers)

Vertiv Group Corporation • Abilene (TX)

On-site
USD 71,635,000 - 90,922,000