Data Center Construction Equipment Operator

Nox Group

Pecos (TX)

On-site

USD 25,000 - 41,000

Full time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Nox Group is seeking an Equipment Operator to support large-scale data center construction projects across the country. You will safely operate heavy machinery and contribute to on-site site prep, material handling, and equipment maintenance while adhering to safety protocols.

The role requires physical stamina, outdoor work, and flexibility for overtime or weekend work in a fast-paced environment. Join our growing construction team and contribute to mission-critical projects.

Qualifications

  • Experience operating heavy machinery on construction sites.
  • Valid operator’s license or certification for relevant equipment.
  • Ability to work outdoors in varying weather conditions.
  • Strong attention to detail and safe operation.
  • Good verbal communication and teamwork.
  • Ability to troubleshoot minor equipment issues.
  • Work outside in loud environments; overtime and weekends as needed.

Responsibilities

  • Operate heavy machinery such as bulldozers, excavators, loaders, and cranes safely.
  • Perform tasks including grading, digging, loading materials with precision.
  • Prepare sites; clear, grade, and excavate for foundations.
  • Transport materials and coordinate with crew on-site.
  • Maintain equipment and report defects to maintenance.
  • Follow safety protocols and wear PPE on all tasks.
  • Document daily activities and hours worked; stay compliant with policies.

Skills

Heavy machinery experience
Operator certification
Physical stamina
Attention to detail
Communication skills
Problem solving
Outdoor work
Flexible hours

Job description

Nox Group is seeking an Equipment Operator to support large-scale data center construction projects across the country. You will safely operate heavy machinery and contribute to on-site site prep, material handling, and equipment maintenance while adhering to safety protocols.

The role requires physical stamina, outdoor work, and flexibility for overtime or weekend work in a fast-paced environment. Join our growing construction team and contribute to mission-critical projects.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Data Center Fabrication & Assembly Pro
Data Center Fabrication & Assembly Pro

Nox Group • Pecos (TX)

On-site
USD 32,000 - 42,000
Hyperscale Data Center Project Engineer
Hyperscale Data Center Project Engineer

RMCI • Harlingen (TX)

On-site
USD 85,000 - 130,000
Per Diem Available for This Role
EQUIPMENT OPERATOR - PER DIEM: $200/Day
EQUIPMENT OPERATOR - PER DIEM: $200/Day

Nox Group • Pecos (TX)

On-site
USD 25,000 - 41,000
Data Center Construction Director
Data Center Construction Director

RMCI • Pecos (TX)

On-site
USD 180,000 - 260,000
Data Center Construction Director – Mission-Critical
Data Center Construction Director – Mission-Critical

RMCI, Inc. • Pecos (TX)

On-site
USD 180,000 - 260,000
Field Safety Technician - Data Center Construction
Field Safety Technician - Data Center Construction

Nox Group • Tulsa (OK)

On-site
USD 34,000 - 48,000
Data Center Construction Project Manager
Data Center Construction Project Manager

Nox Group • Pecos (TX)

On-site
USD 110,000 - 160,000
Heavy Equipment Operator — $200/Day Per Diem
Heavy Equipment Operator — $200/Day Per Diem

Nox Group • Pecos (TX)

On-site
USD 45,000 - 60,000
$200 per day per diem
Competitive wages
Overtime & weekend work
+1
General Superintendent – Data Center Construction Leader
General Superintendent – Data Center Construction Leader

Nox Group • Harlingen (TX)

On-site
USD 120,000 - 200,000
Data Center Construction Area Superintendent
Data Center Construction Area Superintendent

RMCI • Phoenix (AZ)

On-site
USD 120,000 - 150,000