Construction Scheduler for Mega Hospital Program

US Army Corps of Engineers

St. Louis (MO)

On-site

USD 80,000 - 110,000

Full time

10 days ago
Application generator

Get a reply from this employer — a resume and cover letter tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

US Army Corps of Engineers in the St. Louis area seeks a project scheduler for the JCVA Hospital Mega Program. This DHA-based role supports DoD DHA requirements and oversees scheduling across a major hospital project from design through construction.

The position requires expert construction schedule analysis across firm fixed price, design-build, and IDaC contracts, guiding activities from design phases through construction to ensure on-time delivery.

Responsibilities

  • Direct Hire Authority solicitation for Department of Defense, Section 9905, DHA-based appointments.
  • Project scheduler in an Area Office overseeing the JCVA Hospital Mega Program.
  • Serves as expert of construction schedule analysis across multiple contracts (firm fixed price; design-build; Integrated Design and Construction IDaC) from design through construction.

Job description

US Army Corps of Engineers in the St. Louis area seeks a project scheduler for the JCVA Hospital Mega Program. This DHA-based role supports DoD DHA requirements and oversees scheduling across a major hospital project from design through construction.

The position requires expert construction schedule analysis across firm fixed price, design-build, and IDaC contracts, guiding activities from design phases through construction to ensure on-time delivery.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Interdisciplinary (Scheduler)
Interdisciplinary (Scheduler)

US Army Corps of Engineers • St. Louis (MO)

On-site
USD 80,000 - 110,000
Sr. Construction Scheduler (Level III)
Sr. Construction Scheduler (Level III)

APSI Construction Management • Torrance (CA)

On-site
USD 155,000 - 168,000
Scheduler
Scheduler

Street Legal Industries, LLC. • San Antonio (TX)

On-site
USD 90,000 - 130,000
Scheduler – Fort Hood
Scheduler – Fort Hood

Accura Engineering and Consulting Services, Inc. • Little Rock (AR)

On-site
USD 70,000 - 100,000
Competitive salary
Health, dental, and vision insurance
Retirement savings plan with company  
+3
Scheduler – Fort Hood
Scheduler – Fort Hood

Accura Engineering and Consulting Services, Inc. • Houston (TX)

On-site
USD 90,000 - 130,000
Competitive salary based on experience
Health, dental, and vision insurance
Retirement savings plan with company—M
+2
Scheduler – Fort Hood
Scheduler – Fort Hood

Accura Engineering and Consulting Services, Inc. • New Orleans (LA)

On-site
USD 95,000 - 125,000
Competitive salary
Health insurance
Retirement plan with company match
+2
Scheduler – Fort Hood
Scheduler – Fort Hood

Accura Engineering and Consulting Services, Inc. • Phoenix (AZ)

On-site
USD 90,000 - 130,000
Health insurance
Retirement plan
Paid time off
+2
Construction Project Scheduler
Construction Project Scheduler

M&J Engineering • Arlington (VA)

On-site
USD 165,000 - 215,000
Medical, dental and eye insurance
401(k) retirement plan
Life insurance
Scheduler – Fort Hood
Scheduler – Fort Hood

Accura Engineering and Consulting Services, Inc. • Dallas (TX)

On-site
USD 85,000 - 115,000
Competitive salary
Health, dental, vision insurance
Retirement plan with company match
+2
Master Scheduler
Master Scheduler

AppleOne Technical Staffing • Seattle (WA)

On-site
USD 95,000 - 200,000
Health coverage
Life and disability insurance
401(k) with company match
+2