Construction Scheduler: CPM, Lookaheads & Field Coordination

Maven Ventures

Southaven (MS)

On-site

USD 55,000 - 90,000

Full time

14 days+
Application generator

Don’t send a generic resume — generate a resume and cover letter tailored to this exact role.

Get past ATS filters

Job summary

SpaceXAI is seeking a construction scheduler to develop, maintain, and communicate CPM schedules used by field teams, subcontractors, and leadership. You will build baselines, update progress, and explain schedule impacts with recoveries.

The role emphasizes means-and-methods knowledge and challenges schedules that won’t work in the field. The successful candidate will own the critical path, produce short- to mid-term look-aheads, and collaborate across PMs, superintendents, estimators,

Qualifications

  • 4+ years of construction scheduling on active projects (GC, CM, owner's project controls, or specialty contractor).
  • 4+ years of experience using Oracle Primavera P6 with calendars, filters, and schedule quality checks.
  • 4+ years of experience with owner/CM specification-driven schedules (e.g., DCMA 14-point, USACE).
  • Proven ability to develop, maintain, and communicate CPM baselines and recovery plans.

Responsibilities

  • Build baseline CPM schedules from drawings, specs, estimates, bid packages, and sequences with WBS, logic, calendars, and proper constraints.
  • Maintain the live schedule: collect progress, update, and publish weekly look-aheads and monthly updates.
  • Own the critical path; identify near-critical work and explain end-date movements with data.
  • Produce three-week look-aheads aligned to the master schedule and field readiness.
  • Analyze schedule impacts from RFIs, change orders, late design outs, constraints, and weather.
  • Prepare time-impact analyses and what-if, recovery, and acceleration scenarios.
  • Coordinate with PMs, superintendents, estimators, procurement, design, owners/CMs, and subs to reflect committed dates.
  • Resource-load and cost-load the schedule where required; flag crew stacking and production-rate issues.
  • Prepare narratives, variance reports, S-curves, histograms, and executive summaries for reviews.
  • Support delay documentation with as-planned vs as-built records and delay categorization.
  • Enforce schedule standards: naming, coding, updates, backup, and version control for auditable files.
  • Facilitate Last Planner / pull planning sessions and translate commitments into CPM logic.
  • Visit the site regularly to validate the schedule against field progress.

Skills

CPM scheduling
Critical path
Delay analysis
Time-impact analyses
Cost loading
Earned value
Last Planner
BIM 4D
Navisworks
Power BI

Education

Bachelor’s in construction management
PMI-SP / PMP / PSP / CCM

Tools

Primavera P6
Navisworks
Power BI
Smartsheet
Procore
Autodesk Construction Cloud

Job description

SpaceXAI’s mission is to create AI systems that can accurately understand the universe and aid humanity in its pursuit of knowledge. Our team is small, highly motivated, and focused on engineering excellence. This organization is for individuals who appreciate challenging themselves and thrive on curiosity. We operate with a flat organizational structure. All employees are expected to be hands-on and to contribute directly to the company’s mission. Leadership is given to those who show initiative and consistently deliver excellence. Work ethic and strong prioritization skills are important. All employees are expected to have strong communication skills. They should be able to concisely and accurately share knowledge with their teammates.

ABOUT THE ROLE:

Develop, maintain, and communicate construction schedules that the field, subcontractors, and leadership can actually use. You will build CPM baselines, update them from real progress, flag risk early, and explain schedule impact of changes, delays, and recovery plans. This is not a data-entry role. You need enough means-and-methods knowledge to challenge a sequence that will not work in the field.

Superintendents run the work; project managers own cost and contracts; the scheduler is the person who can tell you what is actually driving the end date, what slips if a trade is late, and whether a recovery plan is real.

RESPONSIBILITIES:
  • Build baseline CPM schedules from drawings, specs, estimates, bid packages, and construction sequences (WBS, activity coding, logic, calendars, and constraints used sparingly and correctly).
  • Maintain the live schedule: collect progress from superintendents, project managers, and trades; update percent complete, remaining duration, and logic; publish a clean current-period update on a set cadence (typically weekly look-aheads and monthly official updates).
  • Own the critical path. Identify near-critical work, float erosion, and out-of-sequence progress. Tell the team why the end date moved, not just that it did.
  • Produce three-week (or similar) look-aheads that match the master schedule and what the field can actually crew.
  • Analyze schedule impact of RFIs, change orders, design late-outs, access constraints, long-lead procurement, weather, and labor shortages. Prepare time-impact analyses (TIA) and what-if, recovery, and acceleration scenarios.
  • Coordinate with project managers, superintendents, estimators, procurement, design, owners/CMs, and subcontractors so the schedule reflects committed dates, not wishful ones.
  • Resource-load and, where required, cost-load the schedule. Flag crew stacking, craft shortages, and unrealistic production rates.
  • Prepare narratives, variance reports, S-curves, histograms, and executive summaries for internal reviews and owner/CM submittals.
  • Support claims and delay documentation with contemporaneous records (as-planned vs. as-built, fragnets, delay categorization) when needed.
  • Enforce schedule standards: naming, coding, update process, backup, and version control so the file remains auditable.
  • Facilitate or support pull-planning / Last Planner sessions and convert those commitments into logic in the CPM model.
  • Visit the site regularly. A scheduler who never walks the job will be wrong.
BASIC QUALIFICATIONS:
  • 4+ years of construction scheduling on active projects (GC, CM, owner’s project controls, or specialty contractor).
  • 4+ years of experience using Smartsheet, MS Project, or similar and comfortability with multiple calendars, relationship types, filters, layouts, global vs. project data, and schedule quality checks (open ends, negative float, SS/FF overuse, constraints).
  • 4+ years of experience with owner/CM specification-driven schedules (e.g., DCMA 14-point, USACE, or similar quality metrics).
PREFERRED SKILLS AND EXPERIENCE:
  • Bachelor’s in construction management, civil engineering, or a related field — or equivalent field experience.
  • PSP (AACE), PMI-SP, PMP, CCM, or similar credential.
  • Experience with owner/CM specification-driven schedules (e.g., DCMA 14-point, USACE, or similar quality metrics).
  • Forensic delay analysis, time-impact analysis, and claims support.
  • Cost/resource loading, earned value, and integration with cost systems.
  • Last Planner / pull planning; BIM 4D (Navisworks, Synchro) is a plus.
  • Additional tools as applicable: Power BI, Smartsheet, Procore, Autodesk Construction Cloud.
ADDITIONAL REQUIREMENTS:
  • Willing to work extended hours as needed, including the current 6-day / 12-hour construction cadence.
  • Must be comfortable working in a fully onsite environment.

SpaceXAI is an equal opportunity employer. For details on data processing, view our Recruitment Privacy Notice.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Construction Scheduler - Memphis
Construction Scheduler - Memphis

SpaceXAI • Memphis (TN)

On-site
USD 90,000 - 130,000
Construction Scheduler - Memphis
Construction Scheduler - Memphis

Maven Ventures • Southaven (MS)

On-site
USD 55,000 - 90,000
Onsite Construction Scheduler — Master CPM & Field Planning
Onsite Construction Scheduler — Master CPM & Field Planning

SpaceXAI • Memphis (TN)

On-site
USD 90,000 - 130,000
Lead Scheduler
Lead Scheduler

Rider Levett Bucknall RLB • Milwaukee (WI)

On-site
USD 120,000 - 160,000
Construction Project Scheduler
Construction Project Scheduler

OnQCx • Boise (ID), Northern (KY)

On-site
USD 65,000 - 95,000
Health Insurance
Dental Insurance
Vision Insurance
+3
Project Scheduler
Project Scheduler

Smith Group of Americas • Dallas (TX)

On-site
USD 70,000 - 90,000
Project Controls Scheduler
Project Controls Scheduler

Jobtailor • Houston (TX)

On-site
USD 110,000 - 150,000
Scheduler V - Lead Scheduler
Scheduler V - Lead Scheduler

ENGICON CM • Los Angeles (CA)

On-site
USD 120,000 - 180,000
Senior Scheduling Engineer
Senior Scheduling Engineer

Turner Construction Company • San Antonio (TX)

On-site
USD 110,000 - 160,000
Project Scheduler (Operations)
Project Scheduler (Operations)

Network Cabling Services, Inc. • Houston (TX)

On-site
USD 70,000 - 90,000