Construction Scheduler

Embark Recruiting Solutions

Columbus (OH)

On-site

USD 70,000 - 90,000

Full time

14 days+

Get more replies from employers

Send a job-specific resume in minutes.

Job summary

A recruitment solutions company is seeking a Construction Scheduler in Columbus, OH. This full-time position requires a minimum of 3-5 years scheduling experience and strong knowledge of CPM, Primavera P6, and MS Project. The Scheduler will review and analyze construction schedules, prepare critical path schedules, and assist the project team with progress evaluations. Strong communication skills and the ability to utilize Microsoft Office products are also required for this role.

Qualifications

  • Minimum of 3-5 years’ scheduling experience.
  • Experience with construction schedules for the design-build phase of projects.
  • Knowledge/experience in time impact analysis.

Responsibilities

  • Review construction schedules and provide reports to project team.
  • Analyze scheduling scenarios to assist the project team.
  • Prepare a Critical Path Schedule (CPM).
  • Evaluate and monitor the Contractors progress schedule.

Skills

Critical Path Method (CPM) scheduling knowledge
Excellent computer skills
Experience with Primavera P6 scheduling software
Strong verbal and written communication skills

Education

BS degree in Civil Engineering or Building/Construction Management

Tools

Primavera P6
Microsoft Project
Microsoft Word
Microsoft Excel

Job description

Title: Construction Scheduler
Location: Columbus, OH
Duration: Direct Hire

Our client, located in Columbus OH, has an immediate need for a Scheduler. This is a direct hire / full time position. Details are as follows:

  • The scheduler shall have an in-depth knowledge of construction practices and sequencing
  • The construction scheduler shall review construction schedules with supporting documentation and provide reports to project team
  • Analyze scheduling scenarios to assist the project team
  • The scheduler shall demonstrate the ability to prepare a Critical Path Schedule (CPM)
  • Assist the Project Team in evaluating and monitoring the Contractors progress schedule as well as consulting and troubleshooting issues throughout the construction of the project
  • The scheduler shall have excellent computer skills with in-depth knowledge of Primavera P6 scheduling software and Microsoft Project.
  • Ability to utilize Microsoft Office products, specifically Word and Excel will be required
Experience:
  • Must have a minimum of 3-5 years’ scheduling experience
  • BS degree in Civil Engineering or Building/Construction Management is preferred
  • Strong background using Primavera P6 scheduling software
  • Experience with construction schedules for the design-build phase of the projects
  • Critical Path Method (CPM) scheduling knowledge/experience and the ability to analyze schedules to determine duration and logic issues
  • Experience developing detailed resource loaded design and construction schedules, and preparing progress/status reports and performance of earned value analysis
  • Experience with time impact analysis
  • Construction claims and change order experience is preferred
  • Construction scheduler should have experience integrating the construction schedule into the master schedule
  • Candidate must be able to demonstrate excellent verbal and written communications skills
  • The scheduler shall have excellent computer skills with in-depth knowledge of Primavera P6 scheduling software and Microsoft Project.
  • Ability to utilize Microsoft Office products, specifically Word and Excel will be required
Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Strategic Construction Scheduler: CPM & P6 Expert
Strategic Construction Scheduler: CPM & P6 Expert

Embark Recruiting Solutions • Columbus (OH)

On-site
USD 70,000 - 90,000
Construction Project Scheduler
Construction Project Scheduler

Kaye/Bassman International • Decatur (AL)

On-site
USD 70,000 - 100,000
Scheduling Manager / Scheduler
Scheduling Manager / Scheduler

LVI Associates • Cincinnati (OH)

On-site
USD 110,000 - 160,000
Health, dental, and vision insurance
401(k) or retirement plan options
Paid time off and paid holidays
+1
Scheduler
Scheduler

Holder Construction • Columbus (OH)

On-site
USD 70,000 - 110,000
Paid time off
Health, dental, and vision insurance
401(k)-retirement plan
+2
Senior Construction Scheduler — Primavera P6/CPM Expert
Senior Construction Scheduler — Primavera P6/CPM Expert

Holder Construction • Columbus (OH)

On-site
USD 80,000 - 100,000
Paid time off
Health, dental, vision, and life insurance
Shift differential pay for select roles
Senior Construction Scheduler | CPM & Primavera Pro
Senior Construction Scheduler | CPM & Primavera Pro

Holder Construction • Columbus (OH)

On-site
USD 70,000 - 110,000
Paid time off
Health, dental, and vision insurance
401(k)-retirement plan
Scheduler
Scheduler

IMC Construction • Port Reading (NJ)

On-site
USD 70,000 - 90,000
P6 Scheduler Data Center
P6 Scheduler Data Center

INFOTRON • Columbus (OH)

Hybrid
USD 90,000 - 120,000
Scheduling Consultant (Columbus, OH)
Scheduling Consultant (Columbus, OH)

Ya-Group • Columbus (OH)

On-site
USD 70,000 - 100,000
Project Scheduler (Operations)
Project Scheduler (Operations)

Network Cabling Services, Inc. • Houston (TX)

On-site
USD 70,000 - 90,000