Construction Schedule Manager

Engineered Structures, Inc. (ESI)

Meridian (ID)

Hybrid

USD 90,000 - 120,000

Full time

14 days+
Application generator

Get a reply from this employer — a resume and cover letter tailored to exactly what they’re hiring for.

Get past ATS filters

Benefits offered by this job

100% medical premium for employees and
families
Great upward mobility for careergrowth

Job summary

Engineered Structures, Inc. (ESI) in Meridian, Idaho is seeking a Construction Schedule Manager to build and manage project schedules, including critical path, subcontract input, and integration into Client’s Master Schedule. Expertise in CPM scheduling and Primavera/Microsoft Project is required.

The role features a hybrid work setup with weekly travel to the Meridian headquarters for in-person collaboration and team coordination.

Qualifications

  • 5+ years in the construction industry.
  • 8+ years in a role where critical path scheduling was integral.
  • Proficient with Microsoft Project and Primavera scheduling software.
  • Ability to build and maintain CPM schedules utilizing input from project team, subcontractors and Clients.
  • Ability to build out Level 1-5 project schedules from construction drawings.
  • Understanding of schedule logic, float analysis and critical path analysis.
  • Ability to import and export P6 schedules for integration into a Master Schedule.

Responsibilities

  • Build, manage and update critical path schedules in Primavera and/or Microsoft Project.
  • Conduct pull planning or other methods to establish a baseline schedule and secure buy-in.
  • Provide schedule narratives to team and management on updates and variances.
  • Maintain schedule documentation: baseline, biweekly updates, and look-aheads for contractors.
  • Incorporate subcontractor updates and integrate the construction schedule into a Client’s Master Schedule.
  • Perform time impact analysis and support change management with schedule alignment to scope.

Skills

CPM scheduling
Project coordination
Communication skills
Detail-oriented
Time management
Team collaboration

Tools

Microsoft Project
Primavera
MS Office (Excel)

Job description

The Construction Schedule Manager is responsible for building and managing project schedules to assist with the successful completion of construction projects. They will be responsible for all aspects of schedule control, including: building and maintaining a critical path schedule, integration of subcontract input, integration of the construction schedule into Client’s Master Schedule, monthly updates and reporting on schedule status, resource loading and reporting as required, assistance with change control when required, and keeping the Project Manager informed on areas of concern or options for schedule optimization. This position requires the applicant to be familiar with standard concepts, practices, and procedures related to CPM (Critical Path Method) scheduling.

Our Scheduling Manager position is based out of our Meridian, Idaho headquarters, with the flexibility of a hybrid work arrangement. This role will require weekly travel to our headquarters for in-person collaboration and team coordination.

Benefits
  • ESI covers 100% of the medical premium for all employees and families.
  • Great upward mobility for career growth
Responsibilities
  • Conduct Pull Planning or other methods of project planning to achieve buy in from all project stakeholders and establish a baseline schedule.
  • Build, manage and update critical path schedules in Primavera and/or Microsoft Project.
  • Facilitate Monthly Schedule Deep Dives for Project Teams to review the most updated forecast schedules and any variances to contract turnover dates.
  • Compile monthly executive schedule summary narratives for projects.
  • Ensure appropriate schedule documentation is included on projects: contract (baseline) schedule, biweekly updates, look ahead schedules for contractors.
  • Provide historical data on schedule durations and sequencing for projects.
  • Maintain schedule logic, manage float and resource loading.
  • Incorporate subcontractor updates and have the ability to integrate the construction schedule into a Client’s Master Schedule.
  • Complete periodic updates to the project schedule and provide analysis to the project team to include: overall comparison to previous update, remaining activities, critical path, 5 week look aheads, areas of concern, and potential mitigation.
  • Provide schedule narratives to team and management on schedule updates.
  • Assist with “what – if” analysis on project schedules with the team when issues or opportunities arise on the job.
  • Assist with change management and perform time impact analysis as needed by keeping the schedule aligned with the current scope of the project and have the ability to compare to the original baseline schedule. Provide appropriate schedule documentation to warrant time extensions to contracts.
  • Perform software training to construction team members.
  • Contributes to team effort by accomplishing related results as needed.
Qualifications
  • 5+ years in the construction industry.
  • 8+ years in a position where critical path scheduling was an integral part of your responsibilities.
  • Proficient with Microsoft Project and Primavera scheduling software.
  • Ability to build and maintain CPM (Critical Path Method) schedules utilizing input from the project team, subcontractors and Clients
  • Ability to build out Level 1-5 project schedules from construction drawings.
  • A thorough understanding of schedule logic, float analysis and critical path analysis.
  • Ability to import and export P6 schedules for integration into a Master Schedule.
  • Ability to resource load schedules (both crew make-up and cost).
  • An understanding of Earned Value Management and SPI (Schedule Performance Index) is not required but preferred.
  • Create thriving relationships between company, vendors, and clients.
  • Have a strong understanding of general construction and building envelope assemblies.
  • Ability to read and interpret project documents.
  • Proficient in the use of Microsoft Office, including Microsoft Excel.
  • Have a strong sense of self‑motivation and ability to multi‑task and effectively manage time.
  • Detail orientation sufficient to organize and manage multiple project tasks.
  • Excellent interpersonal skills, fostering effective communication both verbally and in written form.
Working Conditions
  • Fast‑paced working environment.
  • Manage several projects at one time.
  • Interrupted frequently to meet the needs and request of team members, clients, and subcontractors.
  • Working environment may be busy and noisy.
Physical Demands
  • Must be able to remain in a stationary position 50% of the time.
  • Constantly operates a computer, including keyboard, mouse, computer printer, and scanner.
  • Occasional lifting of items up to 25 lbs.
Travel Requirements

Occasional travel between local offices and job sites. May also be required to work on project sites outside of the Boise metropolitan area or in other states.

Disclaimer

The information contained herein is not intended to be an all‑inclusive list of the duties and responsibilities of the job, nor are they intended to be an all‑inclusive list of the skills and abilities required to do the job. Management may, at its discretion, assign or reassign duties and responsibilities to this job at any time. The duties and responsibilities in this job description may be subject to change at any time due to reasonable accommodation or other reasons. It is ESI’s commitment to incorporate Equal Opportunity and diversity principles in all aspects of work.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Construction Scheduler
Construction Scheduler

Hoffman Construction Co of America • Boise (ID)

On-site
USD 95,000 - 125,000
PM (AT Mechanical)
PM (AT Mechanical)

Engineered Structures Inc. • Meridian (ID)

On-site
USD 120,000 - 160,000
Medical premium fully covered
Scheduler Mid-career
Scheduler Mid-career

Stacy Witbeck • California (MO), Northern (KY)

Hybrid
USD 100,000 - 140,000
Employee ownership (ESOP)
Health insurance fully paid
HSA and FSA plans
+1
Project Scheduling Manager
Project Scheduling Manager

Hoffman Construction Co of America • Boise (ID)

On-site
USD 110,000 - 150,000
Senior Construction Scheduler - CPM/Primavera Expert
Senior Construction Scheduler - CPM/Primavera Expert

Engineered Structures, Inc. (ESI) • Meridian (ID)

Hybrid
USD 90,000 - 120,000
100% medical premium for employees and
families
Great upward mobility for careergrowth
Construction Project Scheduler
Construction Project Scheduler

OnQCx • Boise (ID), Northern (KY)

On-site
USD 65,000 - 95,000
Health Insurance
Dental Insurance
Vision Insurance
+3
Construction Project Scheduler
Construction Project Scheduler

OnQGlobal Inc • Boise (ID)

On-site
USD 65,000 - 95,000
Health Insurance
Dental Insurance
Vision Insurance
+3
Construction Scheduler
Construction Scheduler

Hoffman Construction Company • Boise (ID)

On-site
USD 95,000 - 125,000
Competitive pay
Ongoing professional training
Comprehensive health benefits
+1
Advanced Technologies Mechanical Project Manager
Advanced Technologies Mechanical Project Manager

Engineered Structures, Inc. (ESI) • Boise (ID), Northern (KY)

On-site
USD 140,000 - 190,000
Medical premiums covered for employee
Construction Scheduling Administrator
Construction Scheduling Administrator

Hoffman Construction Company • Boise (ID)

On-site
USD 50,000 - 70,000