Concrete Carpenter - Data Center Construction Project (Cheyenne,WY)

Construction Job Force

Aurora (CO)

On-site

USD 34,000 - 45,000

Full time

2 days ago
Be an early applicant
Application generator

An application made for this job — a tailored resume and cover letter that speak straight to the posting.

Get past ATS filters

Benefits offered by this job

Per diem $100/day
Overtime available
Weekly pay
Long-term project

Job summary

Construction Job Force is seeking experienced Concrete Carpenters for a major data center construction project. Based on a contract-to-hire, the role is onsite in Aurora, CO, with long-term work, overtime, and per diem.

Ideal candidates will have 4+ years in concrete carpentry, experience with formwork, and ability to read blueprints. Per diem of $100/day is available for travelers; safety on site is emphasized.

Qualifications

  • 4+ years of commercial concrete carpentry experience.
  • Experience on large commercial or industrial construction projects.
  • Ability to read blueprints and layout work accurately.
  • Safety certifications are a plus but not required.
  • Must provide own steel-toed boots.

Responsibilities

  • Build, install, and strip concrete formwork for commercial construction projects.
  • Construct plywood form systems and Gates form systems.
  • Assist with grade beam, footing, slab-on-grade, and column construction.
  • Measure, layout, and assemble concrete forms according to project specifications.
  • Support concrete pours and finishing operations.
  • Construct temporary structures and perform site carpentry as needed.
  • Install doors, hardware, and other carpentry components throughout the project.
  • Maintain a safe and productive work environment.

Skills

Concrete carpentry
Blueprint reading
Formwork systems
Concrete placement
Safety aware

Job description

Concrete Carpenter - Data Center Construction Project

Location : Cheyenne, WY

Pay: $25.00 - $33.00/hour

Per Diem: $100/day worked (for employees traveling 75+ miles from home)

Schedule: 40-60 hours per week, Sundays off

Job Description

We are seeking experienced Concrete Carpenters to join a major data center construction project. This role offers the opportunity to work on a large-scale commercial concrete project with consistent overtime, per diem, and long-term work.

The ideal candidate will have experience building and assembling concrete formwork systems, assisting with concrete placements, and supporting all phases of structural concrete construction. Candidates will work alongside crews ranging from 5-30 craftsmen and report directly to the onsite Foreman.

Responsibilities

  • Build, install, and strip concrete formwork for commercial construction projects

  • Construct and maintain plywood form systems and Gates form systems

  • Assist with grade beam, footing, slab-on-grade, and column construction

  • Measure, layout, and assemble concrete forms according to project specifications

  • Support concrete pours and finishing operations

  • Construct temporary structures and perform site carpentry as needed

  • Install doors, hardware, and other carpentry components throughout the project

  • Maintain a safe and productive work environment

Qualifications

  • 4+ years of commercial concrete carpentry experience

  • Experience on large commercial or industrial construction projects

  • Strong experience with:

  • Grade beams

  • Grade beam footings

  • Slab-on-grade construction

  • Concrete columns

  • Plywood formwork

  • Gates form systems

  • Ability to read blueprints and layout work accurately

  • Strong understanding of concrete forming and placement processes

  • Safety certifications are a plus but not required

  • Must provide own steel-toed boots

Why Apply?

  • Competitive pay ranging from $25-$33/hour

  • $100/day per diem for qualified travelers

  • Significant overtime available

  • Opportunity to work on a high-profile data center project

  • Long-term project stability

  • Work alongside experienced commercial concrete crews

  • Weekly pay

Job Type & Location

This is a Contract to Hire position based out of Aurora, CO.

Pay and Benefits

The pay range for this position is $25.00 - $33.00/hr.

Individual compensation offered for this position within this range will depend on many factors, including qualifications, skills, relevant experience, job knowledge, geographic location, internal equity, and other pertinent job-related factors.

Eligibility requirements apply to some benefits and may depend on your job classification and length of employment. Benefits are subject to change and may be subject to specific elections, plan, or program terms. If eligible, the benefits

available for this temporary role may include the following

Medical, dental & visionCritical Illness, Accident, and Hospital401(k) Retirement Plan Pre-tax and Roth post-tax contributions availableLife Insurance (Voluntary Life & AD&D for the employee and dependents)Short and long-term disabilityHealth Spending Account (HSA)Transportation benefitsEmployee Assistance ProgramTime Off/Leave (PTO, Vacation or Sick Leave)

Workplace Type

This is a fully onsite position in Aurora,CO.

Application Deadline

This position is anticipated to close on Oct 19, 2026.

The company is an equal opportunity employer and will consider all applications without regards to race, sex, age, color, religion, national origin, veteran status, disability, sexual orientation, gender identity, genetic information or any characteristic protected by law.

San Francisco Fair Chance Ordinance:

Pursuant to the San Francisco Fair Chance Ordinance, for all positions located in the city and county of San Francisco, we will consider for employment qualified applicants with arrest and conviction records.

Massachusetts Lie Detector:

It is unlawful in Massachusetts to require or administer a lie detector test as a condition of employment or continued employment. An employer who violates this law shall be subject to criminal penalties and civil liability.

Use of Artificial Intelligence (AI):

We may use Artificial Intelligence (AI) to support parts of our hiring process, including sourcing, screening, and evaluating candidates. AI helps assess applications and qualifications, but final decisions are made by our hiring team. By applying, you acknowledge and agree that your application may be reviewed using AI tools.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Construction Technician/Concrete Labor
Construction Technician/Concrete Labor

Aerotek • Lakewood (CO)

On-site
USD 29,000 - 37,000
Medical, dental & vision
401(k) Retirement Plan
Per diem travel
Cleaner
Cleaner

Aerotek • Michigan City (IN)

On-site
USD 25,000 - 30,000
Medical, dental & vision
401(k) Retirement Plan
PTO / Vacation
Concrete Labor
Concrete Labor

Aerotek • Milwaukee (WI)

On-site
USD 30,000 - 55,000
Weekly pay
Benefits package
401(k)
Form Carpenter
Form Carpenter

Aerotek • State College

On-site
USD 34,000 - 48,000
Medical insurance
Dental insurance
Vision insurance
+3
Entry-Level Mechanic
Entry-Level Mechanic

Aerotek • Kansas City (KS)

On-site
USD 24,000 - 34,000
Overtime available
Rate increase after 520 hours contract
Special Inspector
Special Inspector

Actalent • United States

Remote
USD 60,000 - 90,000
Medical, dental, vision
Life insurance
401(k) plan
+1
Lead Commercial Carpenter
Lead Commercial Carpenter

Aerotek • College Park (MD)

On-site
USD 34,000 - 45,000
Medical, dental & vision
401(k) plan
Life Insurance
+2
Construction Laborer Operator - Caisson Installation
Construction Laborer Operator - Caisson Installation

Aerotek • Denver (CO)

On-site
USD 52,000 - 62,000
Medical, dental & vision
401(k) Retirement Plan
Life Insurance (Voluntary)
+4
Lead Commercial Carpenter
Lead Commercial Carpenter

Aerotek • College Park (MD)

On-site
USD 34,000 - 45,000
Medical, dental & vision
401(k) plan
Life Insurance
+2
Special Inspector
Special Inspector

Actalent • Minneapolis (MN)

On-site
USD 60,000 - 90,000
Medical insurance
Dental insurance
Vision insurance
+5