Commissioning Field Superintendent - Data Center Construction

Canadian-Breaks-Consulting,-LLC

Childress (TX)

On-site

USD 155,000 - 205,000

Full time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Benefits offered by this job

Health insurance - BCBS PPO
Dental & Vision Insurance
2 weeks PTO

Job summary

Canadian Breaks Consulting, LLC (CBC) seeks a Commissioning Field Superintendent – Senior Consultant to lead field teams onsite in Childress, TX, directing startup and QA/QC across mechanical, electrical, and control systems. The role requires coordinating with design professionals, clients, and subcontractors in a fast-paced environment.

The ideal candidate has 7+ years in construction with 3+ years in commissioning leadership, is comfortable working onsite among loud equipment, and can obtain

Qualifications

  • 7+ years of construction experience, including 3+ years leading commissioning, startup, or field QA/QC on industrial, high-tech, semiconductor, or mission-critical projects.
  • Able to work fully onsite in Childress, TX, near loud equipment, and pass a pre-employment drug screen; must be eligible to work in the United States without sponsorship.
  • Experience leading commissioning field teams across multiple buildings or areas on one program; familiarity with startup sequencing of mechanical, electrical, and low-voltage scopes.

Responsibilities

  • Lead the commissioning field team onsite and manage startup activities and field QA/QC from start to finish.
  • Coordinate mechanical, electrical, low-voltage, and controls groups for sequential startup.
  • Drive integrated systems testing and load bank testing in the field and ensure safety readiness.

Skills

Leadership
Field QA/QC
On-site work
Coordination
Safety compliance
Time management
Interpersonal skills
Team collaboration
Problem solving

Education

OSHA 30 Certification

Tools

Prolog
Procore
E-Builder
Bluebeam
Microsoft Project
Primavera P6
AutoCAD
Revit
Navisworks
CSI MasterFormat

Job description

Commissioning Field Superintendent – Senior Consultant
About CBC

Canadian Breaks Consulting, LLC is a growing consulting firm based in Amarillo, TX serving clients with customized project management solutions to complex problems on critical projects.

Our Mission: "To plan, manage, and execute projects with hearts, hands, and feet of Christ."

Our Core Values
Integrity:

A commitment to Truth with a consistent and uncompromising adherence to strong moral and ethical principles and values.

Excellence:

A constant and consistent drive to uphold and raise standards in whatever you do.

Prudence:

A commitment to taking the extra step and considering the reasonableness of your actions as well as their consequences.

Stewardship:

An unwavering willingness to carefully and responsibly manage interests separate from and greater than your own.

About the Role
Introduction

The Commissioning Field Superintendent collaborates with design professionals, clients, subcontractors, and craftspeople to address complex commissioning coordination issues and is on the front line of avoiding and solving the technical problems that arise. This position is fully onsite at the project in Childress, TX.

Years of Experience

7+ years of combined construction experience, including 3+ years leading commissioning, startup, or field QA/QC on industrial, high-tech, semiconductor, or mission-critical projects

Qualifications
Required
  • 3+ years leading commissioning, startup, or field QA/QC on large industrial, high-tech, semiconductor, or mission-critical projects.
  • Demonstrated ability to lead a commissioning field team, sequence startups across mechanical, electrical, and low-voltage scopes, and hold subcontractors to an approved QA/QC plan.
  • Able to work fully onsite in Childress, TX, work in proximity to loud equipment and across all areas and levels of an active construction site, pass a pre-employment drug and alcohol screen, and work in the United States without sponsorship.
Preferred
  • Startup and turnover experience on data centers, semiconductor fabs, or other mission-critical facilities.
  • Field experience leading integrated systems testing and load bank testing on mission-critical power and cooling systems.
  • General contractor-side field experience on large-scale industrial or high-tech work.
  • Experience leading commissioning field teams across multiple concurrent buildings or areas on one program.
  • Hands-on familiarity with medium- and low-voltage distribution, large generators, UPS equipment, and electrical installations on large mechanical and process equipment.
  • Controls and BMS field experience, including installation oversight, point-to-point checks, and functional testing support.
  • Comfort with structured commissioning documentation systems and level-of-completion tracking.
  • OSHA 30 certification and current site-safety credentials.
  • Track record developing field engineers and QC specialists into independent startup roles.
  • Proficient in Windows and Microsoft Office 365 (Excel, Word, Outlook, Power Point and Teams), and have a strong understanding of working within a computer network.
  • Experience with project management software such as Prolog, Procore, E-Builder, Bluebeam, Microsoft Project, and Primavera Project Planner (P6).
  • Experience with design software such as AutoCAD, Revit and Navisworks.
  • Training in design and construction document reading, design specifications, survey theory and techniques.
  • Experience in organizing technical data in a neat and accurate method. Familiar with Construction Specifications Institutes (CSI) MasterFormat.
  • Strong understanding of construction means and methods, sequencing, and field practices.
  • Ability to work well and maintain a cooperative attitude in a fast-paced environment and manage multiple priorities.
  • Excellent time-management skills and ability to multi-task and prioritize work while frequently interrupted by phone calls and questions on work in progress.
  • Excellent written and oral communication skills with an ability to develop strong interpersonal relationships.
  • Ability to work closely with variety of trade and craft people in a field work situation. Patience and professionalism are essential.
  • Must be a strong team player with the ability to collaborate with various personnel within and across departments and at all levels of leadership.
  • Work schedule must be flexible to allow extended hours or off-shift work to accommodate changing construction schedule and sequences.
Key Responsibilities
  • Lead the commissioning field team onsite and manage startup activities and field QA/QC from start to finish.
  • Execute the commissioning levels in the field across assigned systems and areas, from pre-functional checklists through startup, functional performance testing, and integrated systems testing.
  • Lead integrated systems testing and load bank testing in the field, including failure-mode scenarios on power and cooling trains.
  • Witness testing against the sequences of operation and hold subcontractors and vendors to the approved test scripts.
  • Manage subcontractor QA/QC programs and schedule and coordinate the QC Specialists performing inspections.
  • Review subcontractor and vendor startup readiness, including startup schedules, delivered Owner Furnished Equipment, and the impact other subcontractors may have during startup.
  • Drive the commissioning issues log to closure in the field, including corrective work and retest verification.
  • Drive startup meetings with Area Construction Managers, design teams, subcontractors, and the client.
  • Coordinate mechanical, electrical, low-voltage, and controls groups so systems start in a workable sequence.
  • Oversee controls and building automation installation progress against schedule when that scope falls within the assigned area.
  • Ensure safety readiness and confirm all safety precautions are in place before any system is operated.
  • Manage commissioning documentation, checklists, and submittals so the record matches the installed condition.
  • Support turnover package assembly, including O&M manuals, training records, and warranty start dates.
  • Resolve complex commissioning coordination issues with design professionals, clients, subcontractors, and craftspeople.
Pay and Benefits

$155,000-$205,000

  • Fully covered Employee+Fam BCBS PPO health insurance
  • Fully covered Employee+Fam Dental & Vision Insurance
  • 2 weeks PTO
Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Commissioning Field Superintendent
Commissioning Field Superintendent

Canadian Breaks Consulting LLC • Childress (TX)

On-site
USD 155,000 - 205,000
Health insurance
Dental & Vision insurance
2 weeks PTO
Mechanical Field Superintendent
Mechanical Field Superintendent

Canadian Breaks Consulting LLC • Boise (ID)

On-site
USD 175,000 - 225,000
Health insurance
Dental insurance
Vision insurance
+1
Data Center Commissioning Lead – Onsite Field Expert
Data Center Commissioning Lead – Onsite Field Expert

Canadian-Breaks-Consulting,-LLC • Childress (TX)

On-site
USD 155,000 - 205,000
Health insurance - BCBS PPO
Dental & Vision Insurance
2 weeks PTO
Instrumentation & Controls Superintendent
Instrumentation & Controls Superintendent

Canadian Breaks Consulting LLC • Childress (TX)

On-site
USD 175,000 - 225,000
Fully covered Employee+Fam BCBS PPO健康?
Fully covered Employee+Fam Dental &amp
2 weeks PTO
Building/Area Superintendent
Building/Area Superintendent

Canadian Breaks Consulting LLC • Boise (ID)

On-site
USD 175,000 - 225,000
Health insurance
Paid time off
Project Manager - Semiconductor Facility
Project Manager - Semiconductor Facility

Canadian Breaks Consulting LLC • Boise (ID)

On-site
USD 190,000 - 230,000
Health insurance
Dental & Vision Insurance
Paid time off
Data Center Commissioning Project Manager
Data Center Commissioning Project Manager

Five and Fly • Arizona

Hybrid
USD 125,000 - 165,000
Performance-based bonus
Travel expenses per policy
Benefits eligibility per company plans
Mechanical Field Superintendent - Senior Consultant
Mechanical Field Superintendent - Senior Consultant

Canadian-Breaks-Consulting,-LLC • Boise (ID)

On-site
USD 160,000 - 200,000
Fully covered BCBS PPO healthinsurance
Dental & Vision Insurance
2 weeks PTO
Data Center Commissioning Project Manager
Data Center Commissioning Project Manager

Five and Fly, LLC • United States

Remote
USD 125,000 - 165,000
Competitive base salary
Performance-based bonus eligibility
Travel expenses and per diem
+1
Commissioning Manager - Construction
Commissioning Manager - Construction

Hamilton Barnes • Texas

On-site
USD 130,000 - 200,000
Medical, Dental & Vision Insurance
Health Savings Account
401(k) with employer match
+9