Certified Weld Inspector — Data Center Construction (Travel)

SpaceXSI

Southaven (MS)

On-site

USD 39,000 - 72,000

Full time

14 days+

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

SpaceXSI is seeking a Certified Weld Inspector to support the buildout of high-performance data centers. The role inspects welds on large-bore piping and structural steel, validates quality from construction through turnover, and collaborates with welding, mechanical, structural, and operations teams.

Significant travel and onsite work are required for this hourly position with overtime. Ideal candidates hold AWS CWI certification, a high school diploma, and experience inspecting welded

Qualifications

  • Experience visually inspecting welded industrial piping and/or structural steel.
  • Knowledge of ASME and AWS welding standards is required.
  • NDT methods VT/MT/PT/UT/PAUT knowledge is preferred.

Responsibilities

  • Inspect welds in progress and on completion against codes, WPS, and drawings.
  • Verify welder qualifications before they are allowed to weld.
  • Monitor welding processes and ensure conformance to procedures and specs.
  • Record inspection results and communicate findings to construction and engineering.
  • Oversee on-site QA/QC activities and ensure proper documentation.

Skills

Field inspection experience
ASME Section IX knowledge
Non-destructive testing (VT/MT/PT/UT/{

Education

High school diploma or equivalency
AWS CWI certification

Job description

SpaceXSI is seeking a Certified Weld Inspector to support the buildout of high-performance data centers. The role inspects welds on large-bore piping and structural steel, validates quality from construction through turnover, and collaborates with welding, mechanical, structural, and operations teams.

Significant travel and onsite work are required for this hourly position with overtime. Ideal candidates hold AWS CWI certification, a high school diploma, and experience inspecting welded

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Certified Weld Inspector – Data Center Builds
Certified Weld Inspector – Data Center Builds

Maven Ventures • Southaven (MS)

On-site
USD 39,000 - 58,000
Certified Weld Inspector - Memphis
Certified Weld Inspector - Memphis

X.ai • Southaven (MS)

On-site
USD 39,000 - 58,000
Certified Weld Inspector (CWI) - Memphis
Certified Weld Inspector (CWI) - Memphis

SpaceXSI • Southaven (MS)

On-site
USD 39,000 - 72,000
Industrial Welder - Large Piping & Steel for Data Centers
Industrial Welder - Large Piping & Steel for Data Centers

Maven Ventures • Southaven (MS)

On-site
USD 39,000 - 55,000
Senior Welding Inspector (CWI) — Spaceflight Quality
Senior Welding Inspector (CWI) — Spaceflight Quality

Relativity Space, Inc. • Florida

On-site
USD 48,000 - 73,000
Welding Inspector Specialist – Night Shift
Welding Inspector Specialist – Night Shift

SpaceX • Texas

On-site
USD 90,000 - 120,000
Field Welding Inspector — Travel-Heavy, Quality Guardian
Field Welding Inspector — Travel-Heavy, Quality Guardian

UES, Inc. • Orlando (FL)

On-site
USD 60,000 - 90,000
Welding Inspector Specialist
Welding Inspector Specialist

SpaceX • Texas

On-site
USD 85,000 - 120,000
Certified Welding Inspector — Field QA/QC Leader (Travel)
Certified Welding Inspector — Field QA/QC Leader (Travel)

TEAM, Inc. • Roxana (IL)

On-site
USD 94,000 - 104,000
401k match
Paid vacation
Per-diem while traveling
+1
Senior Welding Inspector (AWS CWI) – Spacecraft
Senior Welding Inspector (AWS CWI) – Spacecraft

Telemetry Today LLC • Florida

On-site
USD 48,000 - 73,000
Competitive salary and equity
Generous PTO and sick leave
Parental leave
+1