Beaumont Petrochemical Construction Scheduler (P6/MS Project)

Burrow Global LLC

Beaumont (TX)

On-site

USD 69,000 - 103,000

Full time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Burrow Global LLC is seeking an experienced Construction Planner/Scheduler for a 4-month field assignment in Beaumont, TX. You will develop, maintain, and update the master project schedule using Primavera P6 and MS Project, tracking field progress and coordinating with site execution, engineering, and procurement teams.

The role requires 5–8+ years of industrial construction scheduling, advanced proficiency in Primavera P6 and MS Project, and strong Excel reporting skills.

Qualifications

  • 5–8+ years of scheduling experience in industrial construction, weighted toward oil & gas, refining, petrochemical, or chemical terminal facilities.
  • Advanced proficiency in Primavera P6 Professional and MS Project and Microsoft Excel (advanced reporting/macros). Experience with Earned Value Management (EVM) tools is a plus.

Responsibilities

  • Develop and baseline the Primavera P6 CPM schedule for the terminal process facility, including construction, engineering, procurement, and commissioning activities.
  • Perform weekly site walkthroughs to audit and update field progress against baseline targets.
  • Identify schedule slippages and analyze critical and sub-critical paths; recommend mitigation or recovery schedules.
  • Align scheduling logic with site sequence requirements across civil, structural, piping, heavy lifts, E&I, and tie-ins.
  • Monitor resources and productivity metrics; support Look-Ahead schedules with site superintendents and subcontractors.
  • Produce weekly/monthly progress reports, S-curves, and milestone variance reports for leadership and client representatives.
  • Evaluate the schedule impact of field changes, RFIs, and scope modifications.

Skills

Schedule development
Critical path analysis
Excel reporting
Field coordination

Tools

Primavera P6 Professional
MS Project
Microsoft Excel

Job description

Burrow Global LLC is seeking an experienced Construction Planner/Scheduler for a 4-month field assignment in Beaumont, TX. You will develop, maintain, and update the master project schedule using Primavera P6 and MS Project, tracking field progress and coordinating with site execution, engineering, and procurement teams.

The role requires 5–8+ years of industrial construction scheduling, advanced proficiency in Primavera P6 and MS Project, and strong Excel reporting skills.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Petrochemical Construction Scheduler – P6 Pro, Beaumont
Petrochemical Construction Scheduler – P6 Pro, Beaumont

Burrow Global • Beaumont (TX)

On-site
USD 83,000 - 124,000
Construction Planner Scheduler
Construction Planner Scheduler

Burrow Global LLC • Beaumont (TX)

On-site
USD 69,000 - 103,000
Senior Planning & Scheduling Lead (Primavera P6)
Senior Planning & Scheduling Lead (Primavera P6)

Bechtel • Houston (TX)

On-site
USD 120,000 - 180,000
Total rewards program
Diversity and inclusion
P6 Scheduler (Contract / South LA)
P6 Scheduler (Contract / South LA)

Milestones • Westlake (LA)

On-site
USD 85,000 - 110,000
Lead Planner - Scheduling for Major EPC Projects (Houston)
Lead Planner - Scheduling for Major EPC Projects (Houston)

Bechtel • Houston (TX)

On-site
USD 120,000 - 170,000
Remote Senior Scheduler - Primavera P6 & CPM Expert
Remote Senior Scheduler - Primavera P6 & CPM Expert

Hill International • Beaumont (TX)

Remote
USD 85,000 - 120,000
Scheduler
Scheduler

Hill International • Beaumont (TX)

Remote
USD 85,000 - 120,000
Senior Project Scheduler – Infrastructure Projects
Senior Project Scheduler – Infrastructure Projects

Bechtel • Houston (TX)

On-site
USD 95,000 - 135,000
Senior Project Scheduler Pecos TX
Senior Project Scheduler Pecos TX

On Grid Infrastructure Services LLC • Pecos (TX)

On-site
USD 90,000 - 130,000
Per diem
401(k) matching
Dental insurance
+3
Senior Project Scheduler - Primavera P6 & CPM
Senior Project Scheduler - Primavera P6 & CPM

Gulf Interstate • Georgia

On-site
USD 110,000 - 140,000