A complete application in a minute
Tailored resume and cover letter, ready to send.
California Department of Water Resources in Merced County seeks a supervisor to lead a multi-disciplinary planning and scheduling team. You will oversee routine and major maintenance and construction activities at hydroelectric generating and pumping plants and related facilities, and manage SAP PMP plans and bills of materials.
This permanent, full-time in-office role reports to the Lead Planner Scheduler, overseeing the field division, and requires a solid understanding of the State Water
At DWR, leadership is about more than oversight – it’s about empowering people to succeed. Join us and help shape a culture of growth and achievement.
Under direction of the Lead Planner Scheduler, as a supervisor, assists with oversight on all activities of a multi-disciplinary trades and crafts planning and scheduling team. These activities include the planning, organizing, and scheduling of routine and major maintenance and construction activities at hydroelectric generating and pumping plants and facilities, including aqueducts, reservoirs, canals, pipelines, dams, spillways, checks sites, roadways, tunnels, and other such civil features; directs and oversees the field division's Preventive Maintenance Program (PMP) which includes creation of new maintenance plans and adjustment to existing maintenance plans in the SAP system; responsible to create bills of material within the SAP system. Monitors and serves as Subject Matter Expert for data collected via the SAP Mobility system. The ideal candidate shall demonstrate a solid understanding of the State Water project’s mission and its financial structure.
Job Code #: 536258
Classification: CHIEF HYDROELECTRIC PLANT OPERATOR
Salary Range: $10,198.00 - $13,654.00
# of Positions: 1
Work Location: Merced County
Telework: In-Office
Job Type: Permanent, Full Time
(209) 827-5112