AI Datacenter Construction Cost Lead

Bitdeer Technologies Group

Massillon (OH)

Presencial

USD 180.000 - 260.000

Jornada completa

Hace 10 días

Una candidatura completa en un minuto

Currículum y carta de presentación personalizados, listos para enviar.

Supera los filtros ATS

Ventajas ofrecidas por este puesto de trabajo

Training and mentoring
Career growth opportunities
Competitive benefits

Descripción de la vacante

Bitdeer Technologies Group is seeking an AI Datacenter Electrical / High Voltage Construction Manager to lead delivery of HV and electrical infrastructure for Bitdeer’s AI datacenter builds. You will report to the VP, Data Center Construction and own electrical construction from interconnection through energization.

The role requires 10+ years in electrical construction for data centers or heavy industrial projects, hands-on HV substations experience, and coordination with utilities.

Formación

  • 10+ years in electrical construction for data centers or heavy industrial projects.
  • Hands-on experience with high‑voltage substations and MV switchgear.
  • Data center power trains including UPS, gensets, batteries and busways.
  • Knowledge of NEC, NFPA 70E, IEEE and NETA standards.

Responsabilidades

  • Oversee on-site HV substations construction and power equipment.
  • Coordinate interconnection, outages, and energization milestones with utilities.
  • Manage MV/LV distribution, switchgear, UPS, batteries, generators, busway.
  • Ensure safety programs per NFPA 70E and energized-work procedures.
  • Review MOPs and validate single-line diagrams.
  • Lead commissioning support and issue resolution.

Conocimientos

Electrical construction management
HV substations
MV/LV distribution
Project coordination
Safety leadership
Stakeholder communication

Educación

Bachelor's degree in Electrical Engineering

Herramientas

NEC
NFPA 70E
NETA standards

Descripción del empleo

About Bitdeer

Bitdeer is a world-leading technology company for Bitcoin mining and AI cloud.

Bitdeer is committed to providing comprehensive Bitcoin mining solutions for its customers. Apart from designing industry-leading ASIC chips and manufacturing mining rigs, the Group handles complex processes involved in computing across the value chain. This includes equipment procurement, transport logistics, datacenter design and construction, equipment management, and network and facility operations. Bitdeer also offers advanced cloud capabilities to customers with a high demand for artificial intelligence.

Headquartered in Singapore, Bitdeer operates globally with a diversified 3 GW energy portfolio, and deploys Bitcoin mining and HPC datacenters in the United States, Bhutan, Norway, Canada, Malaysia, and Ethiopia.

We are seeking

We are seeking an AI Datacenter Electrical / High Voltage Construction Manager to lead delivery of high-voltage and electrical infrastructure for Bitdeer’s AI data center builds. Reporting to the VP, Data Center Construction, you will own electrical construction from the utility interconnection and on-site substation through medium-voltage distribution, the power train, and data hall power delivery, through energization and commissioning.

You will manage electrical contractors and equipment vendors, coordinate with utilities, and enforce electrical safety on every site. The ideal candidate has hands‑on experience building HV substations and large data center electrical systems.

Location: Candidate's will work on site as needed and should be based out of one of the following areas: Texas and Ohio primarily. Specifically, Austin, TX; Rockdale, TX; Abilene, TX; Houston, TX; Massillon, OH, Clarington, OH; Columbus, OH; Cleveland, OH; Pittsburg, PA.

What you will be responsible for
HV & Utility Interconnection
  • Substation Delivery: Manage construction of on-site HV substations, including power transformers, breakers, protection and control, and grounding.
  • Utility Coordination: Coordinate interconnection, outage planning, and energization milestones with utilities and transmission providers.
  • Energization Planning: Plan and execute safe, staged energization sequences with utility, contractor, and commissioning teams.
Electrical Construction Management
  • MV/LV Distribution: Oversee installation of MV and LV distribution, switchgear, transformers, UPS, batteries, generators, busway, and PDUs/RPPs.
  • Contractor Oversight: Manage electrical contractors for safety, quality, productivity, and schedule.
  • Equipment Readiness: Track long‑lead electrical equipment from factory witness testing through delivery, setting, and terminations.
Quality, Testing & Commissioning
  • Installation Quality: Verify installation against drawings, specifications, NEC, and manufacturer requirements.
  • Electrical Testing: Coordinate NETA acceptance testing, relay testing, and protection coordination studies.
  • Commissioning Support: Support Level 1-5 commissioning and resolve electrical issues and punch‑list items.
Electrical Safety
  • Safety Programs: Enforce NFPA 70E, arc‑flash, LOTO, and energized‑work procedures.
  • Switching Procedures: Review and approve Methods of Procedure (MOPs) for energization and switching.
  • Documentation: Ensure single‑line diagrams, as‑builts, and arc‑flash labeling are accurate at turnover.
How you will stand out
  • Experience: 10+ years in electrical construction for data centers, utilities, or heavy industrial projects, including HV substations.
  • HV/MV Systems: Hands‑on experience with high‑voltage substations, MV switchgear, and utility interconnections.
  • Data Center Power: Experience with data center power trains, including switchgear, UPS, generators, battery systems, and busway.
  • Codes & Standards: Working knowledge of NEC, NFPA 70E, IEEE, and NETA standards.
  • Education: Bachelor’s degree in Electrical Engineering or a related field, or equivalent experience (e.g., licensed electrician with progressive leadership).
  • Certifications: Professional certifications such as PE, a journeyman or master electrician license, or OSHA 30‑Hour.
  • AI/HPC Power: Experience with high‑density AI/HPC power distribution and rapid power ramps.
  • Safety Leadership: Stops work when it is unsafe and sets a high bar for electrical safety.
  • Problem Solving: Resolves field issues quickly with engineers and vendors.
  • Coordination: Aligns utilities, contractors, and vendors around one energization plan.
  • Clear Communication: Explains electrical risks and trade‑offs to non‑electrical stakeholders.
What you will experience working with us
  • A culture that values authenticity and diverse perspectives.
  • An inclusive, respectful environment with open workspaces and an energetic, start‑up spirit.
  • A fast‑growing company with opportunities to network with industry pioneers and enthusiasts.
  • The ability to contribute directly and make an impact on the future of the digital asset and AI computing industry.
  • Involvement in new projects and in developing processes/systems.
  • Personal accountability, autonomy, rapid growth, and learning opportunities.
  • Attractive benefits and development such as training and mentoring.

Bitdeer is committed to providing equal employment opportunities in accordance with country, state, and local laws. Bitdeer does not discriminate against employees or applicants based on conditions such as race, color, gender identity and/or expression, sexual orientation, marital and/or parental status, religion, political opinion, nationality, ethnic background or social origin, social status, disability, age, indigenous status, and union.

Consigue la evaluación confidencial y gratuita de tu currículum.

o arrastra y suelta tu archivo aquí

Similar jobs

Puestos de trabajo similares que vale la pena comparar

AI Datacenter Electrical / High Voltage Construction Manager
AI Datacenter Electrical / High Voltage Construction Manager

Bitdeer (NASDAQ: BTDR) • Clarington (OH)

Presencial
USD 120.000 - 180.000
Training and mentoring
Competitive benefits
AI Datacenter Electrical / High Voltage Construction Manager
AI Datacenter Electrical / High Voltage Construction Manager

Bitdeer Technologies Group • Columbus (OH)

Presencial
USD 140.000 - 210.000
Training and mentoring
AI Datacenter Electrical / High Voltage Construction Manager
AI Datacenter Electrical / High Voltage Construction Manager

Bitdeer • Austin (TX), Abilene (TX), Clarington (OH), Pittsburgh

Presencial
USD 150.000 - 210.000
Training and mentoring
AI Datacenter Electrical / High Voltage Construction Manager
AI Datacenter Electrical / High Voltage Construction Manager

Bitdeer Technologies Group • Pittsburgh

Presencial
USD 150.000 - 210.000
AI Datacenter Electrical / High Voltage Construction Manager
AI Datacenter Electrical / High Voltage Construction Manager

Bitdeer Technologies Group • Columbus (OH)

Presencial
USD 130.000 - 170.000
AI Datacenter Construction Manager
AI Datacenter Construction Manager

Bitdeer Technologies Group • Massillon (OH)

Presencial
USD 120.000 - 160.000
Training & mentoring
Startup culture
Career growth
AI Datacenter Construction Cost Lead
AI Datacenter Construction Cost Lead

Bitdeer Technologies Group • Clarington (OH)

Presencial
USD 140.000 - 200.000
Training & mentoring
AI Datacenter Construction Cost Lead
AI Datacenter Construction Cost Lead

Bitdeer Technologies Group • Columbus (OH)

Presencial
USD 140.000 - 240.000
Training and mentoring
AI Datacenter Construction Cost Lead
AI Datacenter Construction Cost Lead

Bitdeer Technologies Group • Abilene (TX)

Presencial
USD 180.000 - 240.000
Training and mentoring
Equal opportunity employer
AI Datacenter Construction Manager
AI Datacenter Construction Manager

Bitdeer Technologies Group • Austin (TX)

Presencial
USD 120.000 - 190.000
Training and mentoring