AI Datacenter Construction Manager

Bitdeer Technologies Group

Massillon (OH)

Presencial

USD 120.000 - 160.000

Jornada completa

Hace 10 días

Una candidatura completa en un minuto

Currículum y carta de presentación personalizados, listos para enviar.

Supera los filtros ATS

Ventajas ofrecidas por este puesto de trabajo

Training & mentoring
Startup culture
Career growth

Descripción de la vacante

Bitdeer is seeking an AI Datacenter Construction Manager to lead on-site delivery of Bitdeer’s AI data center builds. Reporting to the VP, Data Center Construction, you will be Bitdeer’s senior representative on site, accountable for safety, schedule, quality, and cost from mobilization through energization, commissioning, and turnover.

You will manage the general contractor and trade partners day to day, coordinate discipline leads, and keep the site moving to plan.

Formación

  • 10+ years in construction management, including 5+ years leading data center or mission-critical sites.
  • Experience delivering large, fast-track builds with multiple concurrent trades.
  • Working knowledge of civil, structural, MEP, and commissioning on data center projects.

Responsabilidades

  • Owner’s Representative: on-site lead and single point of accountability for the build.
  • Direct the general contractor and trade partners on safety, quality, productivity, and schedule.
  • Run site coordination meetings, look-ahead planning, and site logistics.
  • Drive the site schedule and short-interval plans, flag and recover critical-path slippage.
  • Review change requests, quantities, and pay applications with cost and procurement.
  • Report progress, risks, and issues to leadership and TPM.
  • Enforce site safety plans with the EHS Manager and lead by example in the field.
  • Coordinate disciplines and liaise with authorities for permits and inspections.
  • Support commissioning and turnover with as-builts and punch-list closure.

Conocimientos

Site leadership
Data center
Construction management
Civil/MEP/Electrical
On-site supervision

Educación

Bachelor’s degree in Construction Management, Engineering, or related field

Descripción del empleo

About Bitdeer

Bitdeer is a world-leading technology company for Bitcoin mining and AI cloud.

Bitdeer is committed to providing comprehensive Bitcoin mining solutions for its customers. Apart from designing industry-leading ASIC chips and manufacturing mining rigs, the Group handles complex processes involved in computing across the value chain. This includes equipment procurement, transport logistics, datacenter design and construction, equipment management, and network and facility operations. Bitdeer also offers advanced cloud capabilities to customers with a high demand for artificial intelligence.

Headquartered in Singapore, Bitdeer operates globally with a diversified 3 GW energy portfolio, and deploys Bitcoin mining and HPC datacenters in the United States, Bhutan, Norway, Canada, Malaysia, and Ethiopia.

We are seeking

We are seeking an AI Datacenter Construction Manager to lead on-site delivery of Bitdeer’s AI data center builds. Reporting to the VP, Data Center Construction, you will be Bitdeer’s senior representative on site, accountable for safety, schedule, quality, and cost from mobilization through energization, commissioning, and turnover.

You will manage the general contractor and trade partners day to day, coordinate discipline leads, and keep the site moving to plan. The ideal candidate has run large data center or mission-critical sites from the owner’s or general contractor’s side.

Candidate's will work on site and should be based out of one of the following areas: Texas and Ohio primarily. Specifically, Austin, TX; Rockdale, TX; Abilene, TX; Houston, TX; Massillon, OH, Clarington, OH; Columbus, OH; Cleveland, OH; Pittsburg, PA.

What you will be responsible for
Site Leadership
  • Owner’s Representative: Act as Bitdeer’s on-site lead and single point of accountability for the build.
  • Contractor Management: Direct the general contractor and trade partners on safety, quality, productivity, and schedule.
  • Daily Coordination: Run site coordination meetings, look-ahead planning, and site logistics.
Schedule & Cost
  • Schedule Delivery: Drive the site schedule and short-interval plans, and flag and recover critical-path slippage.
  • Cost Oversight: Review change requests, quantities, and pay applications with cost and procurement.
  • Progress Reporting: Report progress, risks, and issues to the VP, Data Center Construction and the TPM.
Safety & Quality
  • Site Safety: Enforce site safety plans with the EHS Manager and lead by example in the field.
  • Quality Control: Verify work against drawings and specifications with the QA/QC Manager.
  • Issue Resolution: Resolve RFIs and field issues quickly with design and engineering.
Interfaces & Turnover
  • Discipline Coordination: Coordinate civil, electrical/HV, mechanical, fiber, and ELV scopes on site.
  • Authorities & Utilities: Work with local authorities, inspectors, and utilities on permits, inspections, and site access.
  • Turnover: Support commissioning and deliver punch-list closure, as-builts, and turnover.
How you will stand out
  • Experience: 10+ years in construction management, including 5+ years leading data center or mission-critical sites.
  • Project Scale: Experience delivering large, fast-track builds with multiple concurrent trades.
  • Technical Breadth: Working knowledge of civil, structural, MEP, and commissioning on data center projects.
  • Field Leadership: Proven ability to manage general contractors and trade partners on site.
  • Education: Bachelor’s degree in Construction Management, Engineering, or a related field, or equivalent experience.
  • Certifications: Professional certifications such as OSHA 30-Hour, PMP, or CCM.
  • Site-Based Work: Willingness to be based on site and to travel to or relocate to active project locations.
  • Field Leadership: Earns respect from contractors and crews and leads from the front.
  • Decisiveness: Makes sound calls quickly when field conditions change.
  • Communication: Keeps leadership informed with clear, timely updates.
  • Accountability: Owns the outcome of the site end to end.
What you will experience working with us
  • A culture that values authenticity and diverse perspectives.
  • An inclusive, respectful environment with open workspaces and an energetic, start-up spirit.
  • A fast-growing company with opportunities to network with industry pioneers and enthusiasts.
  • The ability to contribute directly and make an impact on the future of the digital asset and AI computing industry.
  • Involvement in new projects and in developing processes/systems.
  • Personal accountability, autonomy, rapid growth, and learning opportunities.
  • Attractive benefits and development such as training and mentoring.

Bitdeer is committed to providing equal employment opportunities in accordance with country, state, and local laws. Bitdeer does not discriminate against employees or applicants based on conditions such as race, color, gender identity and/or expression, sexual orientation, marital and/or parental status, religion, political opinion, nationality, ethnic background or social origin, social status, disability, age, indigenous status, and union.

Consigue la evaluación confidencial y gratuita de tu currículum.

o arrastra y suelta tu archivo aquí

Similar jobs

Puestos de trabajo similares que vale la pena comparar

AI Datacenter Construction Manager
AI Datacenter Construction Manager

Bitdeer Technologies Group • Abilene (TX)

Presencial
USD 150.000 - 230.000
AI Datacenter Construction Manager
AI Datacenter Construction Manager

Bitdeer Technologies Group • Austin (TX)

Presencial
USD 120.000 - 190.000
Training and mentoring
AI Datacenter Construction Manager
AI Datacenter Construction Manager

Bitdeer Technologies Group • Columbus (OH)

Presencial
USD 140.000 - 210.000
Training and mentoring
AI Datacenter Construction Manager
AI Datacenter Construction Manager

Bitdeer Technologies Group • Clarington (OH)

Presencial
USD 120.000 - 180.000
AI Datacenter Construction Manager
AI Datacenter Construction Manager

Bitdeer Technologies Group • Austin (TX)

Presencial
USD 140.000 - 190.000
AI Datacenter Construction Cost Lead
AI Datacenter Construction Cost Lead

Bitdeer Technologies Group • Clarington (OH)

Presencial
USD 140.000 - 200.000
Training & mentoring
AI Datacenter Construction Cost Lead
AI Datacenter Construction Cost Lead

Bitdeer Technologies Group • Columbus (OH)

Presencial
USD 140.000 - 240.000
Training and mentoring
Director, AI Datacenter Construction
Director, AI Datacenter Construction

Bitdeer Technologies Group • Austin (TX)

Presencial
USD 250.000 - 360.000
Director, AI Datacenter Construction
Director, AI Datacenter Construction

Bitdeer Technologies Group • Columbus (OH)

Presencial
USD 180.000 - 260.000
Director, AI Datacenter Construction
Director, AI Datacenter Construction

Bitdeer Technologies Group • Pittsburgh

Presencial
USD 220.000 - 320.000