2nd Shift Packaging Tech — Growth & Proficiency

Nature’s Way, Inc.

Green Bay, Northern (WI, KY)

Hybrid

USD 42,000 - 54,000

Full time

11 days ago

Get more replies from employers

Send a job-specific resume in minutes.

Benefits offered by this job

Medical: PPO plans + company health账户
Dental coverage
Vision coverage
11 holidays off + competitive PTO
401K with company match
Educational assistance reimbursement
Product discounts
Wellness program
Disability insurance
Life and AD&D insurance

Job summary

Nature’s Way, Inc. is seeking a Packaging Technician for the Challenger Plant on 2nd shift (3:00pm–1:00am, Mon–Thu). The role covers operation and monitoring of packaging machines, adherence to SOP and cGMP standards, and documenting activities in a fast-paced manufacturing setting.

The position emphasizes quality, safety, and continuous improvement, with benefits starting day one and opportunities to advance through a proficiency program.

Qualifications

  • Must be proficient in two Packaging Zones (Zone 4 + 1 other).
  • Education/experience aligns with packaging roles and SOPs.

Responsibilities

  • Operate and monitor assigned packaging machines to detect product defects.
  • Follow SOP and cGMP guidelines and complete all related documentation accurately.
  • Maintain cleanliness of workspace, equipment, and materials at all times.

Skills

Two Packaging Zones proficiency

Education

High school diploma or GED preferred

Job description

Nature’s Way, Inc. is seeking a Packaging Technician for the Challenger Plant on 2nd shift (3:00pm–1:00am, Mon–Thu). The role covers operation and monitoring of packaging machines, adherence to SOP and cGMP standards, and documenting activities in a fast-paced manufacturing setting.

The position emphasizes quality, safety, and continuous improvement, with benefits starting day one and opportunities to advance through a proficiency program.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

2nd Shift Packaging Tech — Fast-Paced Growth Path
2nd Shift Packaging Tech — Fast-Paced Growth Path

Nature's Way • Green Bay (AL)

On-site
USD 22,000 - 30,000
Health/dental/vision benefits on day 1
401(k) with company match
Paid holidays and PTO
2nd Shift Packaging Technician – Growth Path & Higher Wages
2nd Shift Packaging Technician – Growth Path & Higher Wages

Nature's Way • Green Bay (WI)

On-site
USD 42,000 - 55,000
Medical insurance
Dental insurance
Vision plan
+1
Packaging Technician - 2nd Shift, Growth & Wages
Packaging Technician - 2nd Shift, Growth & Wages

Nature's Way • Green Bay (WI)

On-site
USD 42,000 - 54,000
Increased wages
Shift differentials
Proficiency program progression
2nd Shift Manufacturing Technician – Growth & Benefits
2nd Shift Manufacturing Technician – Growth & Benefits

Nature’s Way, Inc. • Green Bay (WI)

On-site
USD 25,000 - 36,000
Health insurance
Dental & Vision
401K
+2
3rd Shift Manufacturing Tech - Day 1 Benefits
3rd Shift Manufacturing Tech - Day 1 Benefits

Nature's Way • Green Bay (WI)

On-site
USD 42,000 - 56,000
Medical PPO plans
Dental coverage
Vision coverage
+8
Packaging Technician
Packaging Technician

Nature's Way • Green Bay (WI)

On-site
USD 42,000 - 54,000
Increased wages
Shift differentials
Proficiency program progression
2nd Shift Manufacturing Technician & Machine Operator
2nd Shift Manufacturing Technician & Machine Operator

Nature's Way • Green Bay (WI)

On-site
USD 36,000 - 48,000
Packaging Technician - 2nd Shift
Packaging Technician - 2nd Shift

Nature's Way • Green Bay (WI)

On-site
USD 42,000 - 55,000
Medical insurance
Dental insurance
Vision plan
+1
Packaging Technician - 2nd Shift
Packaging Technician - 2nd Shift

Nature's Way • Green Bay (AL)

On-site
USD 22,000 - 30,000
Health/dental/vision benefits on day 1
401(k) with company match
Paid holidays and PTO
2nd Shift Housekeeping – Packaging (2–10pm) | Day 1 Benefits
2nd Shift Housekeeping – Packaging (2–10pm) | Day 1 Benefits

Nature's Way • Green Bay (WI)

On-site
USD 32,000 - 42,000
Medical plans
Dental plan
Vision plan
+7