A complete application in a minute — tailored resume and cover letter, ready to send.
Hecla Mining Company’s Greens Creek Mine in Juneau, Alaska seeks a Civil Engineering Intern to join the integrated engineering team. You’ll begin with safety, assist in geotechnical sampling, surveying, and data collection while supporting tailings placement planning and daily reporting.
The internship runs between May and September 1, 2027. You must be enrolled in a Civil/Geotechnical engineering program for Fall 2026 and be able to pass pre-employment drug testing; housing is provided and
If you are unable to complete this application due to a disability, contact this employer to ask for an accommodation or an alternative application process.
Technical Greens Creek, Juneau, AK, US
As a Civil Engineering Intern, you will be part of an integrated engineering team providing engineering support services to operation. You’ll start every job with safety first by inspecting your workplace, your equipment. To thrive in this role, you must work safely while working with geotechnical sampling, surveying, and performing data collection.
Hecla Mining Company produces more than 45 percent of all silver in the United States, and has operating mines in Alaska, Idaho, and Yukon Territory, Canada. We also own exploration properties in world-class mining districts throughout North America. Hecla’s philosophy is to operate mines safely by promoting a deeply rooted value-based culture, leveraging mining skills developed over the Company’s long history, and applying innovative new practices. Hecla’s responsibility is to the safety and health of our people, the communities we call home, and the environment we operate in.
Hecla’s Greens Creek Mine in southeast Alaska is one of the largest and lowest-cost primary silver mines in the world, and it is the cash generating engine of the Company. The Greens Creek ore body contains silver, zinc, gold and lead, and it lies within the Admiralty Island National Monument. The Greens Creek property includes 17 patented lode claims and one patented mill site claim. The entire project is accessed by boat. It consists of the mine, an ore concentrating mill, a dry stacked tailings facility, a ship-loading facility, camp facilities, and a ferry dock.
Applicants must possess current authorization to work in the United States.