Senior Closeout Planner | Master Scheduling & Critical Path

Hill International

Saudi Arabia

On-site

SAR 360,000 - 600,000

Full time

6 days ago
Be an early applicant

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Hill International seeks a Lead Planner in Saudi Arabia to drive planning and schedule reporting for the closeout portfolio. You will set schedule standards, develop integrated schedules, and provide critical path analysis to support closeout decisions.

Assignment through 2026 with potential extension. Requirements include 20+ years in planning, extensive experience on mega-projects in the region, and expertise in Primavera P6 and advanced Excel.

Qualifications

  • Minimum 20 years of planning and scheduling experience.
  • 10 years in major projects in Saudi Arabia/GCC.
  • Experience on mega-projects with multi-billion SAR portfolios.
  • Bachelor's degree in Engineering, Construction Management, or a related field.
  • PMI/PMO certifications preferred (PMP/ PMI-SP/ PSP/ AACE).
  • Forensic planning and delay analysis experience desirable.
  • Owner/IPMT/PMC or major program experience is an asset.
  • Expertise in Primavera P6 and advanced Microsoft Excel is mandatory.
  • Power BI development and reporting experience preferred.
  • Strong PowerPoint, Aconex, SharePoint and Microsoft 365 skills.

Responsibilities

  • Own schedule reporting and set the reporting cycle for the closeout portfolio.
  • Establish planning standards, coding requirements, and schedule templates.
  • Develop and maintain integrated schedules for demobilization, preservation, and closeout.
  • Prepare schedule forecasts, covering milestones, activities, and closure dates.
  • Perform critical path analysis, float analysis, and schedule health assessments.
  • Lead schedule review meetings with project, construction, and stakeholder teams.
  • Assess schedule updates for accuracy, logic, and reported progress.
  • Combine contract schedules into a portfolio view, identifying cross-contract dependencies.
  • Identify schedule slippage, constraints, and forecast changes, and their impact on closeout objectives.
  • Provide schedule substantiation for claims, disputes, and final account reviews.

Skills

Planning & scheduling
Critical path analysis
Progress measurement
Leadership

Education

Bachelor's degree in Engineering/Construction Management

Tools

Primavera P6
Microsoft Excel
Power BI
Aconex
SharePoint
Microsoft 365

Job description

Hill International seeks a Lead Planner in Saudi Arabia to drive planning and schedule reporting for the closeout portfolio. You will set schedule standards, develop integrated schedules, and provide critical path analysis to support closeout decisions.

Assignment through 2026 with potential extension. Requirements include 20+ years in planning, extensive experience on mega-projects in the region, and expertise in Primavera P6 and advanced Excel.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Senior Portfolio Planner – Closeout & Claims Analysis
Senior Portfolio Planner – Closeout & Claims Analysis

Sccsinternational • Saudi Arabia

On-site
SAR 350,000 - 550,000
Lead Planner
Lead Planner

Sccsinternational • Saudi Arabia

On-site
SAR 350,000 - 550,000
Senior Megaproject Scheduler | P6 Expert
Senior Megaproject Scheduler | P6 Expert

Hill International (Middle East) Ltd. • Saudi Arabia

On-site
SAR 600,000 - 1,000,000
Lead Planner
Lead Planner

Hill International • Saudi Arabia

On-site
SAR 360,000 - 600,000
Senior Project Scheduling and Controls Engineer
Senior Project Scheduling and Controls Engineer

Hill International • Al-Qassim Province

On-site
SAR 400,000 - 650,000
Senior Project Scheduling Lead
Senior Project Scheduling Lead

Hill International, Inc. • Riyadh

On-site
SAR 350,000 - 650,000
Senior Project Scheduling & Controls Leader
Senior Project Scheduling & Controls Leader

Hill International • Saudi Arabia

On-site
SAR 250,000 - 350,000
Lead Planner
Lead Planner

Hill International (Middle East) Ltd. • Saudi Arabia

On-site
SAR 600,000 - 1,000,000
Strategic Scheduling Lead for Major Projects
Strategic Scheduling Lead for Major Projects

Hill-International,-Inc • Saudi Arabia

On-site
SAR 450,000 - 750,000
Senior Project Scheduling & Controls Lead
Senior Project Scheduling & Controls Lead

Hill International • Abha

On-site
SAR 300,000 - 520,000