KEY RESPONSIBILITIES
- Review tender documents
- specifications
- drawings
- BOQs and BMS control schematics
- Prepare detailed BMS Material Take-Offs
- MTOs
- and quantity calculations
- Estimate controllers
- I O modules
- sensors
- actuators
- valves
- meters
- control panels
- gateways
- software
- licenses and accessories
- Prepare detailed cost estimates covering materials
- engineering
- programming
- panel fabrication
- installation
- wiring
- testing
- commissioning
- software
- integration and labor costs
- Obtain and evaluate quotations from BMS manufacturers
- suppliers and subcontractors
- Prepare technical and commercial quotations according to tender requirements
- Select suitable BMS products and approved-equivalent alternatives where permitted
- Identify scope gaps
- exclusions
- assumptions and deviations
- Prepare comparison sheets and negotiate supplier pricing
- Coordinate with Sales
- Design
- Procurement
- Project and Commissioning teams
- Assist with technical submittals
- compliance statements and tender clarifications
- Attend pre-bid meetings and conduct site visits when required
- Maintain estimation databases
- rate sheets and historical project cost records
- Ensure accurate estimates and timely tender submissions
TECHNICAL KNOWLEDGE
BMS DDC PLC-based control systems HVAC Controls Building Automation AHUs FCUs VAVs Chillers Pumps Cooling Towers Sensors Actuators Control Valves Dampers VFDs DDC Controllers I O Modules BACnet Modbus M-Bus KNX Energy Meters Third-Party System Integration BMS Workstations Servers Graphics Software Control Panels Field Wiring HVAC Control Schematics Points Lists MEP BMS Drawings Specifications BOQ Preparation Quantity Take-Off Cost Estimation Pricing Commercial Analysis
Technical KnowledgeThe candidate should have a good understanding of:
- BMS/DDC/PLC-based control systems
- HVAC controls and sequences of operation
- AHUs, FCUs, VAVs, chillers, pumps, cooling towers, and ventilation systems
- Temperature, humidity, pressure, flow, CO₂ and other field sensors
- Control valves, dampers, actuators, and variable-frequency drives
- Digital and analog I/O requirements
- DDC controllers and I/O modules
- BMS networking and communication protocols such as BACnet, Modbus, M-Bus, KNX, etc.
- Energy meters and integration of third-party systems
- BMS workstations, servers, graphics, software, and licenses
- Control panels and field wiring
- HVAC control schematics and points lists
- Reading MEP/BMS drawings and specifications
- BOQ preparation and quantity take-off
- Costing, pricing, and commercial analysis
Typical Estimation Process
- Tender Documents
- Specification Review
- Drawing Review
- Point List / MTO
- Equipment Selection
- Supplier Quotations
- Material Cost
- Labor & Engineering Cost
- Integration Cost
- Overheads
- Markup
- Technical/Commercial Proposal
Qualifications
- Bachelor's or diploma in Electrical Engineering, Electronics, Instrumentation, Mechatronics, Mechanical Engineering, or related discipline.
- Typically 5 years of experience in BMS estimation, HVAC controls, building automation, or ELV systems.
- Experience with commercial, residential, hospitality, healthcare, industrial, or infrastructure projects is advantageous.
- Good knowledge of Microsoft Excel and preferably AutoCAD.
- Experience with BMS manufacturers/platforms is an advantage.
Key Skills
- Strong analytical and numerical skills
- Excellent knowledge of Excel and cost estimation
- Ability to interpret technical drawings and specifications
- Knowledge of HVAC and control systems
- Supplier/subcontractor quotation analysis
- Attention to detail
- Commercial awareness
- Tender management and deadline management
- Technical report and quotation preparation
- Communication and negotiation skills
- Ability to coordinate with multiple departments
- Estimation accuracy
- Tender submission within deadlines
- Compliance with project specifications
- Accuracy of material quantities and costing
- Reduction of scope omissions and commercial risks
- Supplier quotation turnaround time
- Successful handover of awarded projects
- Accuracy of estimated versus actual project costs