Enable job alerts via email!

RFQ For the Supply, Installation, Testing & Commissioning of a 3 kW Solar Power System

Pakistan Centre for Philanthropy

Islamabad

On-site

PKR 1,400,000 - 2,000,000

Full time

3 days ago
Be an early applicant

Job summary

An established philanthropic organization in Islamabad is seeking quotations for the supply, installation, testing, and commissioning of a 3 kW solar power system. The project requires experience with solar systems and compliance with electrical safety standards. The selected contractor will provide all necessary equipment, including solar panels, a hybrid inverter, and battery backup, along with user manuals and training for system operation.

Qualifications

  • Experience in supplying and installing solar power systems.
  • Understanding of electrical safety standards.
  • Ability to provide training for system operation and maintenance.

Responsibilities

  • Supply and install a complete 3 kW solar PV system.
  • Test and commission the installed system.
  • Provide user manuals and warranty documents.

Job description

Foundation for Ageing & Inclusive Development (FAID)

RFQ For the Supply, Installation, Testing & Commissioning of a 3 kW Solar Power System

For the Supply, Installation, Testing & Commissioning of a 3 kW Solar Power System

Location: Nowshera Office

1. Background

The Nowshera Office intends to install a 3 kW solar photovoltaic (PV) system to ensure uninterrupted and sustainable power supply. The system will utilize high-efficiency solar panels, a hybrid inverter, lithium battery storage, and appropriate mounting and protection equipment.

2. Objectives

  • To supply, install, and commission a complete 3 kW solar PV system in line with the provided specifications.
  • To ensure the system delivers reliable, renewable, and cost-effective power for office operations.
  • Must support 1AC (1.5 invertor), Water Dispenser, 4 LED Bulb and 2 Fans

3. Scope of Work

The Contractor shall be responsible for:

3.1 Supply of Equipment

  • Solar Panels: 8 panels , optimized for a 3 kW system output).
  • Mounting Structure: L2 14-gauge steel frame (4 units), weather-resistant and compatible with site conditions.
  • Inverter: Itel 4 Pro KW hybrid inverter (1 unit).
  • Battery Backup: Itel Lithium Power Bank (1 unit).
  • Miscellaneous Materials: High-quality wiring, breakers, and protection devices.
  • Secure mounting of solar panels on suitable structure (roof or ground).
  • Electrical connections between panels, inverter, batteries, and load center.
  • Installation of all protective devices and breakers.
  • Ensuring compliance with national electrical safety standards.

3.3 Testing and Commissioning

  • Performance testing under load conditions.
  • Calibration and configuration of inverter settings.
  • System handover to the client with a commissioning report.
  • Fully installed and operational 3 kW solar PV system.
  • User manual and warranty documents for all supplied equipment.
  • Training session for operation and maintenance.

5. Timeline

  • Project commencement: Within 5 working days of contract signing.
  • Installation and commissioning completion: Within 10 working days from commencement.

6. Roles and Responsibilities

Contractor: Supply, deliver, install, and test the complete system; provide training and documentation.
Client: Provide site access, confirm installation location, and facilitate necessary permits if required.

7. Warranty and Support

  • Minimum 5-year warranty on solar panels.
  • Minimum 2-year warranty on inverter and battery.
  • Free maintenance support for the first 6 months post-installation.

8. Payment Terms

As per the agreed contract, linked to delivery and commissioning milestones.

Apply By:

Quotations could be submitted via courier or in person on the below mentioned address:

contact: 051 8736476

Please fill the following infomation to view the application submission information.

Relevant Experience:Job Description:....

Get your free, confidential resume review.
or drag and drop a PDF, DOC, DOCX, ODT, or PAGES file up to 5MB.