Consigue una respuesta de este empleador
Tu currículum y tu carta de presentación, adaptados exactamente a lo que buscan contratar.
Quetta Electric Supply Company (QESCO) is inviting online applications for the P.P.C Operator (BPS-05) post in Quetta. The recruitment targets Balochistan domicile holders aged 18-35, with two regular/contract posts available.
The role offers a base salary of PKR 32,000 per month under the BPS-05 pay scale, with benefits including medical facilities and pension under federal rules. Selected candidates will perform workshop and operational support duties, operate copiers and related equipment,
Active Prep BPS-05 QESCO/RECT/2026/01 PID(Q)145/26
Official recruitment notification, eligibility criteria, pay scale (BPS-05), quota allocation, and written screening test syllabus for P.p.c Operator in the Quetta Electric Supply Company (QESCO).
Online applications for this recruitment closed on November 14, 2026. Official screening test syllabus weightages, paper scheme, and practice materials are actively maintained for registered candidates preparing for the upcoming written examination.
P.P.C Operator (BPS-05) offers 2 Posts in Quetta Electric Supply Company (QESCO) (Quetta) with an estimated salary package of 32000 and an age limit of 18 - 35 years (General age relaxation admissible as per Federal Government Rules).
Case Number QESCO/RECT/2026/01
Department / Ministry Quetta Electric Supply Company (QESCO)
Total Positions 2 Posts
Job Type / Status Regular / Contract
Place of Posting Quetta
Age Limit 18 - 35 years (General age relaxation admissible as per Federal Government Rules)
Estimated Base Salary Package 32000
Posting Date October 30, 2026
Apply Before November 14, 2026 (Closed)
Local / Balochistan Domicile
Quetta Electric Supply Company (QESCO), operating under the administrative authority of the Ministry of Energy (Power Division), Government of Pakistan, officially invites online applications through the National Job Portal (NJP) from energetic, skilled, and physically fit candidates holding valid Balochistan Local / Domicile for appointment to the trade and operational support post of P.P.C OPERATOR (BPS-05) (BPS-05). Selected personnel will provide essential workshop craft, warehouse inventory, testing laboratory support, or administrative facility services across Balochistan.
Core daily responsibilities encompass maintaining robust operational workflows across power distribution divisions, central transformer repair workshops, equipment warehouses, and administrative headquarters. Appointees are expected to observe strict workplace safety standards, handle specialized utility machinery, tools, and materials with meticulous care, adhere to departmental reporting hierarchies, and respond promptly during utility operations, emergencies, or scheduled maintenance overhauls. Candidates must demonstrate honesty, diligence, and unwavering commitment to public service.
Quetta Electric Supply Company (QESCO) is a premier public sector power utility operating under the Ministry of Energy (Power Division), Government of Pakistan. QESCO is entrusted with the exclusive responsibility of electricity transmission, distribution, and retail supply across the vast geographical territory of Balochistan province, encompassing over 43% of Pakistan's land area. The organization operates an extensive infrastructure network comprising high-voltage 132kV and 66kV grid substations, thousands of kilometers of 11kV primary distribution feeders, low-tension distribution systems, and specialized transformer repair workshops. Headquartered in Quetta, QESCO plays a vital socio-economic role in electrifying rural townships, energizing deep-well agricultural tube wells, powering industrial estates, and supporting national grid stability. The company is committed to institutional modernization, operational safety, and fostering local engineering talent.
This master practical trade test curriculum and technical examination manual has been established by the Departmental Selection Committee of the Quetta Electric Supply Company (QESCO), Ministry of Energy (Power Division) for official recruitment to the trade and operational support post of P.P.C OPERATOR (BPS-05) (BPS-05) on Balochistan Local / Domicile Quota under advertisement PID(Q)145/26 (Case No. QESCO/RECT/2026/01). In accordance with federal recruitment regulations and statutory trade service rules for basic pay scales BPS-01 through BPS-05, eligible candidates are evaluated through a direct hands-on Practical Trade Test (70 Marks) and an Oral Technical Viva Voce (30 Marks), totaling 100 Marks. Candidates must achieve a minimum cumulative score of 50% to qualify for final selection.
The candidate is tested on specialized practical capabilities in Plain Paper Copier Operation, Large-Format Duplication & Reprographic Maintenance. The assessment ensures demonstrated technical craftsmanship, correct tooling deployment, methodical procedural execution, and strict adherence to utility safety protocols under operational workshop and facility conditions.
Assessment Competency Dimension
Evaluated Performance Criteria & Behavioral Indicators
1. Tool Selection, Setup & Pre-Operational Readiness 15 Marks Immediate identification of correct hand tools, machinery, measuring gauges, protective devices, or cleaning apparatus prior to commencing work.
2. Procedural & Craftsmanship Precision 20 Marks Methodical execution of trade operations, following step-by-step technical procedures, zero damage to equipment, materials, or facilities.
3. Troubleshooting & Practical Problem Solving 15 Marks Accurate identification of operational abnormalities, mechanical defects, material irregularities, or safety hazards, and prompt corrective remediation.
4. Occupational Health & Environmental Safety Compliance 10 Marks Strict adherence to PPE usage, chemical safety, ergonomic lifting, electrical clearances, fire safety rules, and clean workplace hygiene.
5. Speed, Diligence & Turnout Standards 10 Marks Completion of allocated workbench exercises within allotted time limits, exhibiting disciplined demeanor, professional turnout, and orderly tool care.
Evaluation Dimension
Assessed Knowledge Domain & Articulation
1. Core Trade Knowledge & Operating Principles 10 Marks Fundamental understanding of trade tools, machinery operation, material properties, and routine maintenance duties.
2. Maintenance Practices & Safe Work Protocols 10 Marks Knowledge of preventive maintenance intervals, lubrication regimes, chemical handling rules, and fire extinguisher operation (PASS protocol).
3. Emergency Response & Professional Ethics 10 Marks Composure during workshop emergencies, reporting hierarchy, punctuality, honesty, and disciplined public service ethics.
Candidates will be assigned the following real-world practical tasks under the direct observation of the technical evaluation board:
Pre-Operational Readiness & Safety Inspection: Inspect paper supply trays, load fresh moisture-free A4 paper reams, verify toner level indicator shows > 70% capacity.
Step-by-Step Technical Execution Procedure: Examine original tender document (80 pages), check for staples, folded corners, or paper clips; align original pages neatly and place face-up in ADF input tray; access digital control touch panel; select 'Double-Sided to Double-Sided (2->2)' copy mode; set copy density to Auto-Exposure; select 'Collate & Sort' mode with top-corner single staple; program job for 50 complete sets; press Start; monitor paper feed from Tray 2; observe first completed set for print clarity, page alignment, and staple positioning; verify sharp legibility of fine technical drawings; complete 50-set run without feed interruption; box finished dossiers in dispatch cartons.
Crucial Occupational Safety & Operational Precautions: Keep loose neckties, jewelry, and long sleeves away from high-speed rotating document feeder rollers.
Apparatus, Tooling & Equipment Checklist: Large-format digital engineering copier/plotter (A0/A1 size), 80 gsm bond paper roll (36-inch width), roll spindle, cutting blade.
Pre-Operational Readiness & Safety Inspection: Power down paper feed drive on plotter, open front roll media cover, remove empty cardboard core.
Step-by-Step Technical Execution Procedure: Slide 36-inch bond paper roll onto steel media spindle, ensuring paper feeds over the top toward printer throat; adjust roll centering flanges tightly against roll edges; lift spindle assembly into plotter roll holder cradle; feed paper leading edge squarely into drive rollers until plotter emits beep; select media type 'Bond Paper 80g' on control display; place original A0 single-line electrical feeder diagram face-down on scanner glass; adjust scan resolution to 600 DPI monochrome; select reproduction ratio 100%; initiate reproduction; observe automatic synchronized horizontal cutter trimming paper roll cleanly at drawing trailing edge; fold blueprint along standard DIN folding sequence.
Crucial Occupational Safety & Operational Precautions: Avoid touching sharp internal rotary cutter blades; lift heavy paper rolls using proper leg lifting ergonomics.
Apparatus, Tooling & Equipment Checklist: Lint-free microfiber cloth, isopropyl alcohol cleaner, rubber platen roller cleaner, insulated plastic tweezers, service key.
Pre-Operational Readiness & Safety Inspection: Identify error code 'Paper Jam in Fuser Section C' on LCD panel, switch off main power switch, wait 10 minutes for fuser to cool.
Step-by-Step Technical Execution Procedure: Open side maintenance access door; locate hot fuser assembly; lift green fuser release levers to relieve roller pressure; grasp accordion-jammed paper sheet firmly with both hands across full width; pull paper gently and steadily in normal paper travel direction without tearing paper fibers; inspect fuser rollers with inspection torch to verify zero paper scraps remain; close fuser release levers; open scanner platen glass cover; moisten microfiber cloth with isopropyl alcohol; wipe optical glass scanner strip and document transport guide cleanly to remove toner dust, correction fluid spots, and fingerprints; close doors; power on machine and verify test copy.
Crucial Occupational Safety & Operational Precautions: WARNING: Fuser roller surfaces operate at 180°C to 200°C; never touch fuser rollers with bare hands when hot.
The evaluation committee conducts an oral examination evaluating theoretical grounding, operational knowledge, and emergency responsiveness:
Viva Question 1: Explain the electro-photographic (xerographic) copying process used in modern digital plain paper copiers.
Model Operational Response: Xerographic copying principles: (1) Charging: A high-voltage corona wire or charge roller applies a uniform negative electrostatic charge across the rotating photoreceptor drum surface. (2) Exposure: Laser beam scans the drum, discharging areas corresponding to white background and leaving an electrostatic latent image on dark areas. (3) Development: Positively charged toner powder is attracted to negatively charged latent image areas. (4) Transfer & Fusing: Paper receives a strong electrical charge, transferring toner to paper; paper passes through heated fuser rollers (180°C) where heat and mechanical pressure permanently melt and fuse toner resin into paper fibers.
Viva Question 2: Why is paper moisture content the leading cause of frequent paper jams and poor copy quality in digital copiers during humid or rainy weather?
Model Operational Response: Paper moisture effects on reprographics: (1) Paper Curl & Jamming: Paper is hygroscopic and absorbs atmospheric moisture. When moist paper passes through high-temperature fuser rollers, rapid moisture vaporization causes paper to curl, buckle, and jam in exit diverters. (2) Electrical Conductivity: Moist paper exhibits reduced electrical resistivity, which bleeds away electrostatic transfer charges. This results in weak toner transfer, faded gray prints, background toner scattering, and roller slippage in paper feed trays. Preventive rule: Store paper reams flat in original moisture-barrier wrappers until loading.
Candidates must demonstrate uncompromising adherence to federal workplace safety regulations, occupational hygiene protocols, and emergency response directives established by QESCO and the Ministry of Energy (Power Division):