Senior Temporary Works Manager - Marine Bridge Construction

0003 Acciona Construcción Iberia S.A

Manila

On-site

PHP 900,000 - 2,100,000

Full time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

ACCIONA Construction is seeking a Temporary Works Manager based in the Philippines to lead the design, coordination, and technical assurance of temporary works for marine bridge construction. This role involves overseeing marine platforms, cofferdams, and lifting systems in offshore environments, ensuring safety and constructibility from design briefs to execution.

The position reports to the Design Manager and requires 15 years of experience in civil engineering, with at least 10 years in a

Qualifications

  • 15+ years total experience in civil projects.
  • Minimum 10 years in a similar temporary works/bridge role.
  • Strong knowledge of temporary works systems in marine/offshore environments.
  • Professional English proficiency.

Responsibilities

  • Lead design and coordination of all temporary works for marine bridge construction.
  • Develop safe, efficient temporary works solutions (cofferdams, falsework, formwork, lifting systems).
  • Review briefs and requirements to define scope and objectives.
  • Ensure compliance with codes and project specs.
  • Coordinate with permanent works designers, consultants, subcontractors.
  • Establish the construction temporary works design basis with load considerations.
  • Participate in project risk workshops.

Skills

Leadership
Problem-solving
Communication

Education

Degree in Civil Engineering

Job description

ACCIONA Construction is seeking a Temporary Works Manager based in the Philippines to lead the design, coordination, and technical assurance of temporary works for marine bridge construction. This role involves overseeing marine platforms, cofferdams, and lifting systems in offshore environments, ensuring safety and constructibility from design briefs to execution.

The position reports to the Design Manager and requires 15 years of experience in civil engineering, with at least 10 years in a

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Senior Temporary Works Design Lead – Marine Bridges
Senior Temporary Works Design Lead – Marine Bridges

ACCIONA • Bataan

On-site
PHP 2,500,000 - 4,500,000
Senior Temporary Works Design Lead – Bridge Construction
Senior Temporary Works Design Lead – Bridge Construction

ACCIONA Energía • Manila

Hybrid
PHP 2,500,000 - 4,500,000
Bridge Temporary Works Design Lead (Marine)
Bridge Temporary Works Design Lead (Marine)

Acciona (Australia) • Manila

On-site
PHP 1,800,000 - 3,000,000
Temporary Works Manager
Temporary Works Manager

Acciona (Australia) • Manila

On-site
PHP 1,800,000 - 3,000,000
Temporary Works Manager
Temporary Works Manager

0003 Acciona Construcción Iberia S.A • Manila

On-site
PHP 900,000 - 2,100,000
TEMPORARY WORKS MANAGER
TEMPORARY WORKS MANAGER

ACCIONA • Bataan

On-site
PHP 2,500,000 - 4,500,000
Temporary Works Manager
Temporary Works Manager

ACCIONA Energía • Manila

On-site
PHP 2,500,000 - 4,500,000
Senior Marine Piling Manager for Bridge Foundations
Senior Marine Piling Manager for Bridge Foundations

ACCIONA Energía • Manila

Hybrid
PHP 2,500,000 - 5,000,000
Senior Marine Piling Manager for Bridge Foundations
Senior Marine Piling Manager for Bridge Foundations

Acciona (Australia) • Manila

On-site
PHP 1,200,000 - 2,400,000
Lead Bridge Tower Construction Manager
Lead Bridge Tower Construction Manager

Acciona • Manila

On-site
PHP 3,000,000 - 9,000,000
Top Employer Philippines 2024/2025
Top locations