Facilities Head: Transition Assets, Visayas Power

AboitizPower

Lapu-Lapu

Vor Ort

PHP 1.500.000 - 2.600.000

Vollzeit

14 Tage+

Eine vollständige Bewerbung in einer Minute

Maßgeschneiderter Lebenslauf und Anschreiben – versandbereit.

Schaffe es an den ATS-Filtern vorbei

Zusammenfassung

East Asia Utilities Corporation seeks an Executive Facilities Head to oversee transition assets across the Visayas, including diesel thermal units and battery energy storage systems (BESS). You will drive operations, maintenance, safety governance, and lifecycle decisions to optimize performance and profitability while meeting grid and regulatory requirements.

You will lead multi-site teams, coordinate with O&M and engineering, and shape asset strategies within the AboitizPower Transition

Qualifikationen

  • Bachelor's Degree in Electrical, Mechanical or Chemical Engineering with license.
  • Professional License (Required): Licensed Mechanical, Electrical, or Chemical Engineer.
  • Registered Engineer / PE status or advanced professional certification is a strong advantage.
  • At least 7-10 years in a diesel power plant or significant relevant experience.
  • At least 5 years in managerial capacity in operations or maintenance in a power generation facility.

Aufgaben

  • Oversees plant operations for diesel and BESS facilities across Visayas, ensuring start-up, operation, load changes, grid support and shutdown procedures.
  • Directs preventive, predictive, and corrective maintenance for mechanical, electrical, instrumentation, and storage systems.
  • Sets KPIs for site managers and operators; drives safety-first culture and governance.
  • Collaborates with Energy Trading & Sales to align market conditions with asset performance and revenue opportunities.
  • Ensures compliance with ERC, DOE, PGC, PDC, GMC, and NGCP requirements; manages risk and safety programs.
  • Represents the company in host communities and regulatory engagements to foster goodwill.

Ausbildung

Bachelor's Degree in Electrical, Mechanical or Chemical Engineering with license
Professional License (Required): Licensed Mechanical, Electrical, or Chemical Engineer
Registered Engineer / PE status or advanced certification
7-10 years in diesel power plant or relevant experience
5 years in managerial capacity in operations or maintenance

Jobbeschreibung

East Asia Utilities Corporation seeks an Executive Facilities Head to oversee transition assets across the Visayas, including diesel thermal units and battery energy storage systems (BESS). You will drive operations, maintenance, safety governance, and lifecycle decisions to optimize performance and profitability while meeting grid and regulatory requirements.

You will lead multi-site teams, coordinate with O&M and engineering, and shape asset strategies within the AboitizPower Transition

Hol dir deinen kostenlosen, vertraulichen Lebenslauf-Check.

oder ziehe deine Datei hierhin.

Similar jobs

Ähnliche Jobs, die dir auch gefallen könnten

Head of Transition Assets – Power & Storage
Head of Transition Assets – Power & Storage

Aboitiz Power Corporation • Lapu-Lapu, Cebu City

Vor Ort
PHP 3.000.000 - 5.000.000
Facilities Head - Transition Assets
Facilities Head - Transition Assets

Aboitiz Power Corporation • Lapu-Lapu, Cebu City

Vor Ort
PHP 3.000.000 - 5.000.000
Facilities Head - Transition Assets
Facilities Head - Transition Assets

AboitizPower • Lapu-Lapu

Vor Ort
PHP 1.500.000 - 2.600.000
ESS Electrical Supervisor
ESS Electrical Supervisor

Aboitiz Power Corporation (Power) • Lapu-Lapu

Vor Ort
PHP 893.000 - 1.339.000
ESS Electrical Supervisor
ESS Electrical Supervisor

AboitizPower • Lapu-Lapu

Vor Ort
PHP 1.200.000 - 2.000.000
ESS Electrical Supervisor
ESS Electrical Supervisor

Aboitiz Power Corporation • Lapu-Lapu

Vor Ort
PHP 1.200.000 - 2.000.000
BESS Project Cost Controller Specialist
BESS Project Cost Controller Specialist

Aboitiz Power Corporation (Power) • Pasig

Vor Ort
PHP 900.000 - 1.300.000
BESS Project Cost Controller Specialist
BESS Project Cost Controller Specialist

AboitizPower • Pasig

Vor Ort
PHP 900.000 - 1.400.000
Director, Renewables Outage & Capital Projects
Director, Renewables Outage & Capital Projects

AboitizPower • Makati

Vor Ort
PHP 3.500.000 - 6.000.000
Power Plant Shift Manager: Lead Safe, Reliable Ops
Power Plant Shift Manager: Lead Safe, Reliable Ops

Aboitiz Power Corporation (Power) • Mariveles

Vor Ort
PHP 1.800.000 - 2.400.000
Top-Standorte