Get more replies from employers
Send a job-specific resume in minutes.
Spml Infra is seeking a Deputy Manager for BESS Integration to lead the design, integration and commissioning of containerized energy storage systems.
You will coordinate with BMS/PCS, SCADA and grid interfaces, develop SLDs and network layouts, and oversee FAT, on-site testing and grid compliance to meet utility standards.
Prepare Single Line Diagrams (SLD), Control schematics, and Communication network layouts (Modbus, Ethernet).
Lead on-site installation, BESS site testing (SAT), First Time Charging Performance guarantee test and grid compliance, including functional testing and performance validation.
Work with suppliers and EPC teams to ensure seamless interaction between Battery management systems (BMS) and PCS.
Ensure adherence to safety standards (e.g., UL 9540, NFPA 855) and Grid codes (e.g., IEEE 1547).
Bachelor?s/Master?s in Electrical Engineering or related field.
3?10+ years in power systems, renewable energy, or Energy storage, with experience in site testing and commissioning.
Knowledge of Battery technology (LFP), Inverter controls, and SCADA systems.
Proficiency in simulation tools (e.g., ETAP, PSCAD).
Disclaimer: This job description has been sourced from a public domain and may have been modified by Naukri.com to improve clarity for our users. We encourage job seekers to verify all details directly with the employer via their official channels before applying.