Setting-Out Engineer – Data Center Construction

TSL

Randstad

On-site

EUR 45,000 - 65,000

Full time

14 days+
Application generator

A complete application in a minute — tailored resume and cover letter, ready to send.

Get past ATS filters

Benefits offered by this job

Driving licence
Occasional travel

Job summary

TSL is recruiting a practical, accurate Setting Out Engineer to support the delivery of complex construction projects, including data centre works in the Netherlands. You will translate approved drawings and BIM data into precise positions on site, working under the Senior Project Manager to ensure accuracy and first-time right execution.

You will coordinate with CSA/MEP interfaces, Project Director, and subcontractors, maintain traceable survey records, and perform pre-pour and post-install

Qualifications

  • Degree or higher technical diploma in Civil Engineering, Geomatics, Land Surveying, Construction Engineering or related discipline.
  • 3+ years setting-out or site-engineering on large/complex construction projects.
  • Competence with robotic total stations and digital levelling equipment (Leica/Trimble/Topcon or equivalent).
  • Ability to read and interrogate construction drawings and BIM data (AutoCAD, Revit, Navisworks).

Responsibilities

  • Establish, verify and maintain survey control points, benchmarks and levels.
  • Set out foundations, structural elements, slabs, walls and openings.
  • Use robotic total stations and GNSS to achieve required accuracy.
  • Interpret drawings and BIM information before setting out work.
  • Perform as-built surveys and report deviations or clashes.
  • Coordinate with site teams and subcontractors on reference information and tolerances.

Skills

English proficiency
Read construction drawings
On-site teamwork

Education

Civil Engineering or related degree

Tools

AutoCAD
Revit
Navisworks

Job description

TSL is recruiting a practical, accurate Setting Out Engineer to support the delivery of complex construction projects, including data centre works in the Netherlands. You will translate approved drawings and BIM data into precise positions on site, working under the Senior Project Manager to ensure accuracy and first-time right execution.

You will coordinate with CSA/MEP interfaces, Project Director, and subcontractors, maintain traceable survey records, and perform pre-pour and post-install

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Setting Out Engineer
Setting Out Engineer

TSL • Randstad

On-site
EUR 45,000 - 65,000
Driving licence
Occasional travel
Data Centre Setting Out Engineer – Site Lead Near Amsterdam
Data Centre Setting Out Engineer – Site Lead Near Amsterdam

Future Engineering Recruitment Ltd • Amsterdam

On-site
EUR 52,000 - 68,000
Accommodation
Travel Allowance
Flights Home
+1
Data Centre Site Engineer: Precise Set-Out
Data Centre Site Engineer: Precise Set-Out

Sisk Group • Netherlands

Remote
EUR 50,000 - 70,000
26 days annual leave
Pension and benefits
Unlimited learning and development
Project Engineer: Data Center Delivery & Technical Coordination
Project Engineer: Data Center Delivery & Technical Coordination

TXM Recruit • Zuid-Holland

On-site
EUR 52,000 - 68,000
Site Engineer
Site Engineer

Future Engineering Recruitment Ltd • Amsterdam

On-site
EUR 52,000 - 68,000
Accommodation
Travel Allowance
Flights Home
+1
CSA Engineer – Data Centre Delivery Lead (Amsterdam)
CSA Engineer – Data Centre Delivery Lead (Amsterdam)

Winthrop Technologies • Amsterdam

On-site
EUR 60,000 - 90,000
Competitive salary package
Career growth opportunities
Collaborative team culture
Site Engineer
Site Engineer

Sisk • Eemshaven

On-site
EUR 50,000 - 70,000
Competitive salary
26 days annual leave
Pension and benefits
+1
CSA Engineer – Data Centre Projects (Amsterdam)
CSA Engineer – Data Centre Projects (Amsterdam)

Winthrop Technologies Ltd. • Amsterdam

Hybrid
EUR 55,000 - 85,000
Data Centre Engineering Lead (Senior) – Quality & Delivery
Data Centre Engineering Lead (Senior) – Quality & Delivery

Sisk • Amsterdam, Amstelveen

On-site
EUR 85,000 - 115,000
26 days annual leave
Pension and benefits
Unlimited learning and development
Senior Engineer, Data Centre - QA & Field Lead
Senior Engineer, Data Centre - QA & Field Lead

Sisk Group • Netherlands

Remote
EUR 90,000 - 130,000
26 days annual leave
Pension and benefits
Unlimited learning and development