Senior Planner

Jabil

Penang

On-site

MYR 90,000 - 130,000

Full time

14 days+
Application generator

Stand out for this role — generate a tailored resume and cover letter in about a minute.

Get past ATS filters

Job summary

Jabil in Penang, Malaysia is seeking an experienced Master Scheduler to manage all planning activities for the assigned workcell and mentor Production Planners and Document Coordinators.

You will own Master Production Scheduling (MPS), BOMs, and material planning while ensuring 100% on-time delivery through tight demand and capacity alignment. APICS certification and leadership in planning are highly valued.

Qualifications

  • Bachelor’s degree + 5 years of experience, or Masters + 3 years of related experience, or PhD without experience.
  • APICS certification and Supervisor experience preferred.
  • Thorough knowledge of MRP, lead times for components, internal run rates, test development lead times, machine programming lead times and the chronology of events to build a product.

Responsibilities

  • Own production planning, BOM and document control with or without additional support.
  • Develop Master Production Schedule (MPS) and load into ERP system, including PO coverage.
  • Ensure 100% on-time delivery and 95% MPS goal.
  • Analyze material and capacity requirements and communicate constraints to the Workcell and customer.
  • Lead the Workcell on BOMs and routings for accurate WIP tracking and inventory movement.

Skills

MRP knowledge
Production planning
Demand forecasting
BOM management
Capacity planning

Education

Bachelor’s degree in related field
APICS certification
Master’s degree (optional)

Tools

ERP system
Power BI
Rapid Response
eDashboard

Job description

At Jabil (NYSE: JBL), we are proud to be a trusted partner for the world's top brands, offering comprehensive engineering, supply chain, and manufacturing solutions. With 60 years of experience across industries and a vast network of over 100 sites worldwide, Jabil combines global reach with local expertise to deliver both scalable and customized solutions. Our commitment extends beyond business success as we strive to build sustainable processes that minimize environmental impact and foster vibrant and diverse communities around the globe.

Job Summary

Manage all planning activities for the dedicated assigned workcell and mentor the Production Planners and Document Coordinators in the workcell.

Essential Duties and Responsibilities
  • Ensure 100% on-time delivery.
  • Establish build readiness.
  • Maintain efficiency of capacity and customer sizing.
  • Maintain accurate revenue forecasting.
  • Maintain material control and liability.
  • Develop Master Production Schedule (MPS) and load into Jabil’s ERP system, including Purchase Order (PO) coverage.
  • Reconcile the MPS to customer PO coverage weekly to ensure that Jabil is not exposed over and above customer PO coverage or other authorized customer demand.
  • Ensure the MPS is always 100% accurate and achievable.
  • Achieve and maintain 95% MPS goal.
  • Own production planning, BOM and document control with or without additional support.
  • Analyze material and capacity requirements and communicate constraints to the Workcell and customer based on accurate customer demand.
  • Maintain the workcell’s capacity planning model; drive resolution on uneven capacity utilization that keeps Jabil focused on the customer but efficiently utilizing manufacturing resources.
  • Meet daily with the Workcell and manufacturing team to assess production schedules, (adjust as necessary based on production results) optimize run quantities, and minimize changeovers to help achieve 100% on time delivery.
  • Maintain the customers’ latest contract on file at all times and be familiar with the terms and conditions of the contract regarding customer liability of material planning and production scheduling. This includes the liability window for Jabil material purchase order placement, purchase price for components, and liability for any in-house materials (purchased and manufactured).
  • Be the workcell’s “expert” on all planning activities by supporting the Production Planner goal of never starting to build product without having a valid PO, adequate material quantities, and accurate BOM and an accurate routing.
  • Lead the Workcell on the creation of Bills of Material (BOMs) and routings that allows accurate tracking of WIP assemblies and accurate inventory movement transactions.
  • End-of Life (EOL) management should include chairing a meeting 30 days prior to the last planned build date to create tactics to support the EOL strategy. The Master Planner would own the build schedule, corrections and resolution of MPS to customer demand, planned tactics on deadlines for assemblies out of the various work areas on the floor, deadline for last shipment, and support plan for potential RMAs.
  • Manage Jabil purge process for internal Workcell purges.
  • Adhere to all safety and health rules and regulations associated with this position and as directed by supervisor.
  • Comply and follow all procedures within the company security policy.
Management & Supervisory Responsibilities
  • Typically reports to Management. Direct supervisor job title(s) typically include: TBD
  • Job is NOT directly responsible for managing other employees (e.g., hiring/termination and/or pay decisions, performance management).
Education & Experience Requirements

Bachelor’s degree + 5 years of experience, or Masters + 3 years of related experience, or PhD without experience. APICS certification and Supervisor experience also preferred. Thorough knowledge of MRP, lead times for specific component types, internal run rates, test development lead times, machine programming lead times and complete understanding of the chronological sequence of events that must occur in order to build a product. Or an equivalent combination of education, training, or experience.

Process Ownership & Governance
  1. 1. Process Ownership & Governance Planning SMEs own the definition, deployment, and governance of planning processes: i) MPS approval & alignment ii) Customer commit logic iii) Production scheduling rules iv) Planning Rules of the Road compliance
  2. 2. Standards, Best Practices & Audits Planning SME accountable for: i) Site and regional standard work ii) Baseline assessments iii) Closing audit GAPs with zero NC expectation iv) Scaling best practices across sites
  3. 3. Planning Tools & Digital Transformation Planning SMEs drive: i) Tool standardization (Power BI, Rapid Response, eDashboard) ii) Automation (RPA, macros, API, DF initiatives) iii) Reduction of manual planning work
  4. 4. Performance Metrics Ownership Planning SMEs own planning KPIs, especially: i) Review KPI gaps ii) Define corrective actions iii) Support sites that miss targets
  5. 5. Training, Certification & Capability Building Planning SME responsible for: i) Training content ii) Certification governance iii) Planner skill progression iv) Succession planning
  6. 6. Escalation, Crisis & Hands‑On Support Planning SME expected to, when site faces issue: i) Step in hands‑on ii) Provide root cause analysis iii) Stabilize operation iv) Coach site teams
Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Planner Sr
Planner Sr

Jabil • Simpang Empat

On-site
MYR 90,000 - 130,000
Planner Sr
Planner Sr

Jabil • Malaysia

On-site
MYR 80,000 - 110,000
Senior Planner
Senior Planner

Sinergia Talents • Penang

On-site
MYR 120,000 - 180,000
Senior Master Planner & Production Scheduler
Senior Master Planner & Production Scheduler

Jabil • Simpang Empat

On-site
MYR 90,000 - 130,000
Planning Manager
Planning Manager

Jabil • Penang

On-site
MYR 150,000 - 210,000
Senior Production Planner MPS, BOM & Capacity
Senior Production Planner MPS, BOM & Capacity

Jabil • Malaysia

On-site
MYR 80,000 - 110,000
Planner
Planner

Jabil Sdn Bhd (Global Business Center) • George Town

On-site
MYR 56,000 - 89,000
Planner I/II/Sr
Planner I/II/Sr

Jabil • Penang

On-site
MYR 60,000 - 90,000
Planner
Planner

Jabil • Penang

On-site
MYR 55,000 - 75,000
Planning & Production Control Manager
Planning & Production Control Manager

GENIC TECHNOLOGY (MALAYSIA) SDN. BHD. • Sepang

On-site
MYR 120,000 - 240,000