Responsible for developing, implementing, and optimizing the Material Requirements Planning (MRP) system and overall production planning processes. This role will drive the integration of production planning, material management, inventory control, and procurement through systematic planning solutions to improve operational efficiency, material availability, and production continuity.
Key Responsibilities
- Lead the development, implementation, and optimization of the MRP system to support production planning and material requirements management.
- Establish MRP parameters, including BOM (Bill of Materials), lead time, safety stock, reorder points, lot-sizing rules, and inventory planning logic.
- Develop and optimize production planning systems and processes based on production capacity, demand forecasts, customer orders, and material availability.
- Analyze material shortages, excess inventory, slow-moving stock, and inventory turnover to improve material utilization and reduce inventory risks.
- Collaborate with IT, Production, Purchasing, Warehouse, and other relevant departments to develop MRP functions and ensure effective system integration.
- Review existing planning processes, identify gaps, and drive automation and digitalization initiatives to improve planning accuracy and efficiency.
- Establish standardized planning procedures, workflows, master data governance, and reporting systems.
- Monitor MRP performance, production plan adherence, material availability, and inventory accuracy, and provide improvement recommendations to management.
- Provide technical guidance and training to PMC team members on MRP systems, planning methodologies, and best practices.
Requirements
- Bachelor's degree in Supply Chain Management, Industrial Engineering, Manufacturing Engineering, Operations Management, or a related field.
- Minimum 5 years of relevant experience in Production Planning, Material Planning, PMC, or MRP system implementation/development in a manufacturing environment.
- Proven experience in MRP system development, implementation, enhancement, or ERP/MRP integration projects.
- Strong knowledge of BOM structure, material planning logic, production scheduling, inventory control, capacity planning, and procurement processes.
- Experience in ERP/MRP systems implementation, system configuration, process mapping, testing, and troubleshooting.
- Strong analytical, project management, problem-solving, and cross-functional coordination skills.
- Ability to independently lead system development projects and drive process improvements.