Construction Scheduler - Naples, Italy - OCONUS

Bristol Companies

Napoli

Presencial

EUR 80.000 - 116.000

Jornada completa

14 días+

Una candidatura completa en un minuto

Currículum y carta de presentación personalizados, listos para enviar.

Supera los filtros ATS

Descripción de la vacante

Bristol Alliance of Companies seeks an experienced Scheduler to provide independent planning, scheduling, analysis, and schedule-risk support for NAVFAC EURAFCENT projects at NSA Naples, NSA Bahrain, and related sites.

The role requires a bachelor’s degree or equivalent scheduling experience, 5+ years in scheduling, DoD/Navy project exposure, and a current Secret clearance. Proficiency with Primavera P6 and related tools is essential.

Formación

  • Bachelor’s degree in engineering, Engineering Technology, or Construction Management with 5+ years scheduling experience; OR 10 years scheduling experience without a qualifying degree.
  • Experience scheduling construction projects valued at $25M or greater.
  • Proficiency with Primavera P6 and Claim Digger.
  • Experience analyzing cost-loaded NAS schedules and performing time-impact analysis.
  • Active Secret Clearance required.
  • Valid driver’s license.

Responsabilidades

  • Prepare and analyze planning, design, and construction schedules for diverse Navy facility types including housing, waterfront structures, medical facilities, administrative buildings, utilities, hangars, industrial facilities, command centers, and power plants.
  • Recommend reasonable construction durations for RFP/solicitation packages considering operational constraints, outages, secured area escorts, environmental permitting, and ancillary project interfaces.
  • Develop Basis of Schedule (BoSE) documentation and present schedule durations to Government stakeholders and leadership.
  • Review A/E-prepared schedule durations and propose adjustments based on constraints and conditions.
  • Participate in Cost Schedule Risk Analysis (CSRA) activities.
  • Serve as a non-voting technical member of Technical Evaluation Teams (TET) when schedule submissions are evaluated.
  • Analyze contractor cost-loaded Network Analysis Schedules (NAS), including critical path updates and delay impacts.
  • Collaborate with FEAD/ROICC representatives and provide schedule training and review guidance.
  • Provide schedule duration analysis and review comments at NAVFAC design milestones (35%, 65%, 100%).
  • Other duties as assigned.

Conocimientos

Primavera P6
Claim Digger
MS Project
MS Office Suite
Adobe Acrobat Pro
Schedule analysis
Written & oral communication
Team collaboration

Educación

Bachelor’s degree in engineering / Construction Management or related field

Herramientas

MS Office Suite

Descripción del empleo

Posting Details
  • Posted on September 14, 2026
Locations
  • Showing 1 location FPO, AE, FN 09621, USA
  • On-site
  • Construction
  • Full-Time
  • Requisition #: CONST001874
Description

Job Summary

The Scheduler provides independent, professional planning, scheduling, analysis, and schedule-risk support to NAVFAC EURAFCENT projects supporting NSA Naples, NSA Bahrain, and additional EURAFCENT locations. This role develops, analyzes, validates, and presents planning, design, and construction schedules for Navy shore facility types and ensures compliance with NAVFAC standards.

Bristol Alliance of Companies (Bristol) is committed to building lasting relationships that reflect our hard work, ingenuity, and dedication to safety. Every employee has an impact on our success, which benefits the Native Culture, land, and people of the Bristol Bay region.

Our values: People, Communities, Reputation, Teamwork, Trust, and Truth.

Essential Functions

  • Prepare and/or analyze planning, design, and construction schedules for diverse Navy facility types including housing, waterfront structures, medical facilities, administrative buildings, utilities, hangars, industrial facilities, command centers, and power plants.
  • Recommend reasonable construction durations for RFP/solicitation packages considering operational constraints, outages, secured area escorts, environmental permitting, and ancillary project interfaces.
  • Develop Basis of Schedule (BoSE) documentation and present schedule durations to Government stakeholders and leadership.
  • Review A/E-prepared schedule durations and propose adjustments based on constraints and conditions.
  • Participate in Cost Schedule Risk Analysis (CSRA) activities.
  • Serve as a non-voting technical member of Technical Evaluation Teams (TET) when schedule submissions are evaluated.
  • Analyze contractor cost-loaded Network Analysis Schedules (NAS), including critical path updates and delay impacts.
  • Collaborate with FEAD/ROICC representatives and provide schedule training and review guidance.
  • Provide schedule duration analysis and review comments at NAVFAC design milestones (35%, 65%, 100%).
  • Other duties as assigned.

Competencies

  • Skilled in written and oral communication, including technical correspondence and schedule narratives.
  • Ability to analyze complex construction schedules and identify critical path shifts.
  • Strong analytical and problem-solving abilities.
  • Ability to work collaboratively with diverse engineering and construction teams.
  • Skilled in Primavera P6, Claim Digger, MS Project, MS Office Suite, and Adobe Acrobat Professional.
  • Ability to interpret construction drawings, contract documents, and Federal building criteria.

Required Education and Experience

  • Bachelor’s degree in engineering, Engineering Technology, or Construction Management and a minimum of 5 years of scheduling experience; OR 10 years of scheduling experience without a qualifying degree.
  • Experience scheduling construction projects valued at $25M or greater.
  • Proficiency with Primavera P6 and Claim Digger.
  • Experience analyzing cost-loaded NAS schedules and performing time-impact analysis.
  • Active Secret Clearance required.
  • Valid driver’s license.

Preferred Education and Experience

  • Experience supporting Federal or DoD facilities construction projects.
  • Familiarity with NAVFAC processes and Unified Facilities Criteria (UFC).
  • Experience delivering schedule-related training.

Work Environment

The work environment characteristics described here are representative of those an employee encounters while performing the essential functions of this job. Reasonable accommodation may be made to enable individuals with disabilities to perform the essential functions.

  • Position may be subject to both inside and outside environmental conditions, noise sufficient to cause the worker to shout.
  • Position may be subject to a variety of physical conditions – proximity to moving mechanical parts, moving vehicles, electric current, working on scaffolding and high places, exposure to high heat or exposure to chemicals.
  • Position may be subject to atmospheric conditions – fumes, odors, dusts, mist, gases, or poor ventilation.
  • Position may be subject to close visual acuity to perform activities such as viewing a computer terminal and extensive reading.

Physical Qualifications

The physical demands described here are representative of those that must be met by an employee to successfully perform the essential functions of this job.

  • Mobility: must be able to stoop, kneel, reach, walk, lift, grasp, feel, talk, hear, and perform repetitive motions.
  • Hearing: must be able to hear audible safety alarms.
  • Visual Acuity: must be adequate to perform above listed tasks in a safe manner and perform activities such as viewing a computer terminal and extensive reading.
  • Lifting: must be able to exert up to 50 pounds of force occasionally and up to 20 pounds of force frequently, and/or a negligible amount of force constantly to lift, carry, push, pull or otherwise move objects, including the human body.

Equal Opportunity Employer/Protected Veterans/Individuals with Disabilities

This employer is required to notify all applicants of their rights pursuant to federal employment laws. For further information, please review the Know Your Rights notice from the Department of Labor.

Consigue la evaluación confidencial y gratuita de tu currículum.

o arrastra y suelta tu archivo aquí

Similar jobs

Puestos de trabajo similares que vale la pena comparar

Construction Manager
Construction Manager

Bb & E, LLC • Vicenza

Presencial
EUR 82.000 - 127.000
Cost Estimator - Naples, Italy - OCONUS
Cost Estimator - Naples, Italy - OCONUS

Bristol Companies • Napoli

Híbrido
EUR 78.000 - 113.000
PROGRAM ANALYST - OCONUS - Naples, Italy
PROGRAM ANALYST - OCONUS - Naples, Italy

Bristol Companies • Napoli

Híbrido
EUR 65.000 - 83.000
Health plan
Paid time off
401(k) plan
+1
Construction Scheduler — DoD Navy Projects, Secret Clearance
Construction Scheduler — DoD Navy Projects, Secret Clearance

Bristol Companies • Napoli

Híbrido
EUR 80.000 - 116.000
Construction Engineering Technician
Construction Engineering Technician

Bb & E, LLC • Vicenza

Presencial
EUR 55.000 - 75.000
Facility Planner
Facility Planner

BB&E Consulting Engineers and Professionals • Napoli

Presencial
EUR 90.000 - 120.000
Professional development opportunities
Local payroll and benefits compliance
Statutory leave and local market terms
Facility Planner
Facility Planner

Bb & E, LLC • Napoli

Presencial
EUR 90.000 - 120.000
Third-party employer of record
Construction Administrative Support Specialist
Construction Administrative Support Specialist

Bb & E, LLC • Viagrande, Catania

Presencial
EUR 42.000 - 62.000
Design Architect
Design Architect

BB&E Consulting Engineers and Professionals • Napoli

Presencial
EUR 70.000 - 90.000
Design Architect
Design Architect

Bb & E, LLC • Napoli

Presencial
EUR 70.000 - 90.000