A complete application in a minute
Tailored resume and cover letter, ready to send.
Fondazione Bruno Kessler - FBK is seeking a researcher to model, optimize, and manage battery energy storage systems within the BET Unit. You will develop physics-based and data-driven models, implement energy management strategies, and support integration into digital twin platforms for both European and national projects.
The role focuses on advancing energy storage integration, grid flexibility, and multi-market participation, with a 24-month fixed-term contract starting around January 2026,
The Centre on Sustainable Energy (SE) supports the development of devices and methods for generation, storage, and distribution of energy solutions at low environmental impact. This will be done in the perspective of energy sustainability, of systems and solutions that respect the environment and the quality of life, of solutions with a lower impact on health and on environmental pollution levels. The ground for the Centre on “Sustainable Energy” is based on the Decarbonization targets, which will demand for more flexibility of the energy system, through new gas and power grids and using energy vectors and storage solutions, as enablers for the wide penetration of renewables.
The Battery and Electrification Technologies (BET) Unit targets the development and optimal use of battery technologies in both mobility and stationary applications. BET focuses on current and upcoming battery and storage technologies (e.g., LIBs, SSBs, RFBs, HESS) working on a wide range of topics from material development and characterisation to demonstration activities in relevant environment, including of course modelling and optimal management.
The position concerns the modelling, optimisation, and advanced management of battery energy storage systems (BESS) and more in general energy storage systems (ESS) and their interaction with the power grid. The successful candidate will work in the Battery and Electrification Technologies (BET) Unit, supporting both European and national projects. The position is offered within the Horizon Europe project SMART-ESS (Smart Multi-Layer AI-Based Resilient Twin for Advanced Control of Energy Storage Systems), which develops and demonstrates advanced modelling, hybrid AI control, and digital twin technologies to improve the performance, flexibility, and integration of energy storage systems into power grids.
The activities of the successful candidate will focus on:
The ideal candidate should have:
Furthermore, the following elements will be positively evaluated:
Type of contract: fixed-term contract
Working hours: Full time (38 h per week)
Start date: Preferably January 2026
Duration: 24 months with the possibility of extending the contract depending on funding
Workplace: Povo (Trento) and Rovereto
Gross annual salary: From €41.245,00 to €47.182,01 depending on background and expertise in the field, plus objectives achievements bonus
More info at https://www.fbk.eu/en/work-with-us/