Staff QC (Plant Lab) - Junior Engineer / Asst.Engineer

Aditya Birla Group

Andhra Pradesh

On-site

INR 500,000 - 800,000

Full time

47 hours ago
Be an early applicant

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Aditya Birla Group’s Andhra Pradesh Cement Works seeks a Staff QC (Plant Lab) to supervise quality parameters, maintain BIS records, and support shift QC activities. The role is based at APCW with integration into the APCW manufacturing unit and quality control department.

Experience in cement quality testing and familiarity with BIS compliance are preferred. The position is located in Tadipatri, Anantapur district, Andhra Pradesh, India.

Qualifications

  • Quality and QC testing activities
  • Maintain BIS records
  • Shift activities in quality parameters

Responsibilities

  • To ensure shift activities on quality parameters are working in good condition and BIS records are maintained.
  • Assist in quality control processes and routine testing within APCW.
  • Coordinate with manufacturing teams to ensure quality standards are met.

Skills

Quality
Quality Control Testing

Job description

Staff QC (Plant Lab) - Junior Engineer /...

ABG115611

  • Cement
  • Andhra Pradesh

End Date 20 Nov 2026

Required Experience 3 - 8 years

Basic Section

No. Of Position 1

Grade ST

Level Assistant Engineer

Organisational

BUSINESS Cement

BUSINESS_UNIT-1 Cement Manufacturing HO

BUSINESS_UNIT-2 Andhra Pradesh Cement Works

BUSINESS_UNIT-3 Andhra Pradesh Cement Works

DEPARTMENT-1 Manufacturing - APCW

DEPARTMENT-2 Quality Control

Country India

State Andhra Pradesh

Industry Manufacturing

Function Quality and Technical Services

Skills
Skill

Quality Quality Control Testing

CERTIFICATION
Job Description
Job Purpose

To ensure the Shift activities on quality parameters are working in good condition and maintaining BIS records.

Job Context:
Andhra Pradesh Cement Works (APCW) : a unit of UltraTech Cement Limited, a flagship company of the Aditya Birla Group is situated at Tadipatri, District - Anantapur. APCW has 2 Lines. Line-1 was commissioned in 1998 with an installed capacity of 2 million tons (2 MTPA) cement annually, which has been enhanced to 2.7 MTPA over a period of six years through several improvements and modifications. Line-2 was commissioned in August 2008 with an installed capacity of 3.4 MTPA. The total cement production capacity of APCW, along with the associated Units, is 11 MTPA. The integrated plant is associated with two grinding units and one bulk terminal - Arakkonam Grinding Unit (ARCW) in Tamil Nadu, Ginigera Grinding Unit (GICW) in Karnataka and Shankarapalli Bulk Terminal (SBT) in Hyderabad. The unit has also established a thermal power plant of 4 X 25 MW capacity to cater the plant's power requirement.
The APCW Mine is located near Tummalapenta Village, Kolimigundla Mandal, Kurnool District at Andhra Pradesh. It has a production capacity of 9.20 MTPA. The mine lease extents up to 844.939 hector. It was opened in the year July 1997. The general geology falls in Narji Limestone formation of Kurnool system, age of 800 Mio years old. As per UNFC classification, mine has got the limestone reserves of 181.65 Mio MT as on 31 March 2012. It is one of the largest mines producing 9.20 Mio MTPA limestone at single location.

Key Result Areas

KRA (Accountabilities) (Max 1325 Characters)

Supporting Actions (Max 1325 Characters)

KRA1 XFR & bailne appretus verification Daily own STD sample run XRF & Blaine appertusfor verification for same

KRA2 Quality Systems- Assist superior in Implementation of ISO, EMS, WCM related activities through involvement of team members in the section to improve productivity & quality standards. Assist Superior in- Identify and execute improvement study and kaizen. Identify & get rectify.Abnormalities. Spillage/leakages. Unsafe conditions/practices. 5S activities. Points emerged in campaigns. Execute implementation plan for Strategic quality projects. Quality improvement objectives. Improvement of WCM objectives & practices. EMS targets. Internal customer rating improvement. ISO system improvement. Statutory compliance. WCM activity boards updating. Model area development. Create awareness in team members. Visual controls development & implementation.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Staff Tech Services (Drawing) - Supervisor/Sr supervisor/Junior Officer
Staff Tech Services (Drawing) - Supervisor/Sr supervisor/Junior Officer

Aditya Birla Group • Andhra Pradesh

On-site
INR 400,000 - 700,000
PF Mechanical (Rclmr & Trans) - Engineer/Sr Engineer/Asst. Manager
PF Mechanical (Rclmr & Trans) - Engineer/Sr Engineer/Asst. Manager

Aditya Birla Group • Andhra Pradesh

On-site
INR 700,000 - 1,100,000
Staff QC (Shift Oprtn) - Junior Engineer / Asst. Engineer
Staff QC (Shift Oprtn) - Junior Engineer / Asst. Engineer

Aditya Birla Group • Andhra Pradesh

On-site
INR 400,000 - 560,000
PF TPP (Instrument BTG) - Engineer/ Sr. Engineer/ Asst. Manager
PF TPP (Instrument BTG) - Engineer/ Sr. Engineer/ Asst. Manager

Aditya Birla • Andhra Pradesh

On-site
INR 420,000 - 540,000
PF TPP (Operation- Desk Engr) - Engineer...
PF TPP (Operation- Desk Engr) - Engineer...

Aditya Birla Group • Tadipatri

On-site
INR 900,000 - 1,300,000
PF Mechanical (ShiftOperation)
PF Mechanical (ShiftOperation)

UltraTech Cement • Himachal Pradesh

On-site
INR 900,000 - 1,400,000
PF Instrument (DCS&Automation) - Asst.Manager / Sr.Engineer / Engineer
PF Instrument (DCS&Automation) - Asst.Manager / Sr.Engineer / Engineer

Aditya Birla Group • Andhra Pradesh

On-site
INR 600,000 - 1,200,000
PF Instrument (DCS&Automation) - Asst.Ma...
PF Instrument (DCS&Automation) - Asst.Ma...

Aditya Birla Group • Tadipatri

On-site
INR 800,000 - 1,400,000
PF Electrical (Raw Mill) - Asst.Manager/Sr.Engineer/Engineer
PF Electrical (Raw Mill) - Asst.Manager/Sr.Engineer/Engineer

Aditya Birla Group • Andhra Pradesh

On-site
INR 900,000 - 1,300,000
Staff Process (Shift Oprtn) - Assistant Engineer / Junior Engineer / Senior Supervisor
Staff Process (Shift Oprtn) - Assistant Engineer / Junior Engineer / Senior Supervisor

Aditya Birla Group • Karnataka

On-site
INR 350,000 - 550,000