Una candidatura completa en un minuto
Currículum y carta de presentación personalizados, listos para enviar.
Aditya Birla Group's Andhra Pradesh Cement Works in Tadipatri invites an experienced Engineer for PF TPP (Operation- Desk Engr). The role focuses on safe, economical operation of boilers and turbines, startup/shutdown, and coordination with plant teams to ensure continuous power generation while meeting safety standards.
Required experience 5-6 years in power plant operation is essential. Join a flagship cement unit with a 4x25 MW power plant and multi-fuel capability, offering opportunities to
PF TPP (Operation- Desk Engr) - Engineer...
End Date 05 Nov 2026
Required Experience 5 - 6 years
Basic Section
No. Of Position 1
Grade 11
Organisational
BUSINESS Cement
BUSINESS_UNIT-1 Cement Manufacturing HO
BUSINESS_UNIT-2 Andhra Pradesh Cement Works
BUSINESS_UNIT-3 Andhra Pradesh Cement Works
DEPARTMENT-1 TPP Operation & Maintenance
Country India
State Andhra Pradesh
Industry Manufacturing
Boiler Operations Material Handling Water Quality Budgeting Steam Turbines MIS
To ensure safe & smooth TPP desk operation while start up- shutdown of boiler and turbine along with economic, uninterrupted and quality power generation by co-ordination with other agencies in the plant to rectify the abnormalities and report to Shift Incharge and SH operation. Ensuring Process optimisation, Handling of emergencies & Safe operation of boiler and turbine on most economic fuel mix efficiently.
Job Context: Andhra Pradesh Cement Works (APCW) : a unit of UltraTech Cement Limited, a flagship company of the Aditya Birla Group is situated at Tadipatri, District - Anantapur. APCW has 2 Lines. Line-1 was commissioned in 1998 with an installed capacity of 2 million tons (2 MTPA) cement annually, which has been enhanced to 2.7 MTPA over a period of six years through several improvements and modifications. Line-2 was commissioned in August 2008 with an installed capacity of 3.4 MTPA. The total cement production capacity of APCW, along with the associated Units, is 11 MTPA. The integrated plant is associated with two grinding units and one bulk terminal - Arakkonam Grinding Unit (ARCW) in Tamil Nadu, Ginigera Grinding Unit (GICW) in Karnataka and Shankarapalli Bulk Terminal (SBT) in Hyderabad. The unit has also established a thermal power plant of 4 X 25 MW capacity to cater the plant's power requirement.
The APCW Mine is located near Tummalapenta Village, Kolimigundla Mandal, Kurnool District at Andhra Pradesh. It has a production capacity of 9.20 MTPA. The mine lease extents up to 844.939 hector. It was opened in the year July 1997. The general geology falls in Narji Limestone formation of Kurnool system, age of 800 Mio years old. As per UNFC classification, mine has got the limestone reserves of 181.65 Mio MT as on 31 March 2012. It is one of the largest mines producing 9.20 Mio MTPA limestone at single location.
Major Challenges: Operation :
Maintaining maximum economic and quality power generation with respect to fluctuating power demand from the cement plant with Maintaining full loading, careful operations, avoiding wastages of steam, water, fuel, and auxiliary power for optimise the cost of generation inspite of no greed availibility.
Ensure the safe start up, operation & shutdown to minimise the delay & smooth functioning of all auxiliaries systems in context of high pressure & temperature parameters.
To run the boiler successfully on various (multi fuel) fuel mix such as Lignite, Mozambique, SAB, US & Petcock with maximum availability & without affecting the optimum boiler efficiency with maintaining parameters within specified limits.
Professional Experience description: (state key experiences required): Power plant operation of boilers and turbines
Critical Job competencies / Mandatory Skills:
Subordinate Team: Direct reports (nos.): 3 Indirect reports (nos.): 7
JOB PROFILE - (Please select the most essential points & supporting actions of the role).
1) Experience of field - desk operating of boilers & turbine during normal & emergency time, safe start-up & stoppage of plant, like to come in round the clock shifts.
2)Operational knowledge in CFBC Boilers, Steam turbines, water chemistry, and material handling system (Ash and coal handling plant) Operation.
3) Awareness about SAP, MIS, WCM, ISO & UTCL Safety standards.
4) Knowledge to collect performance parameters and calculate equipment efficiency and maintain record data.
KRA (Accountabilities) (Max 1325 Characters)
Supporting Actions (Max 1325 Characters)
KRA1 Plant operation:
KRA2 Shift management
KRA3 SHE (Safety, Health & Environment) along with Sustainability initiatives - Ensuring 100% compliance of all safety standards and all applicable recommendations related to their concerned area.
KRA4 System Management
KRA5 Safety, WCM & ISO implementation.
Maintaining the standard safety practices and participation in WCM / ISO activities. To look after the daily job activity by strick follow up of the safety practices to prevent the occurrence of any unwanted incident / accident
To increase the safety awareness among the workers and supervisors.
To take active participation in various WCM / ISO activities & implementation of some concepts like visual management etc. in field area.