Get a reply from this employer
Your resume and cover letter, tailored to exactly what they’re hiring for.
Amelia Coal Mine in Singrauli, MP, seeks a skilled Electrical Maintenance Engineer to manage, install, maintain and troubleshoot electrical infrastructure in the CHP and related systems. You will plan preventive maintenance and ensure safety standards are met to minimize downtime and optimize energy use.
The role focuses on keeping coal handling and loading processes running smoothly, coordinating with site teams, maintaining documentation, and adhering to statutory requirements.
Job Purpose
To manage and maintain the electrical systems and equipment in the Coal Handling Plant (CHP) and Rapid Loading System (RLS), ensuring safe, efficient, and reliable operation. Responsible for the planning, installation, maintece, and troubleshooting of electrical infrastructure, ensuring compliance with safety standards and regulations. The role aims to minimize downtime, optimize energy usage, and support the continuous and effective handling of coal from the mine to loading systems.
Job Context & Major ChallengesJob Context:
Amelia Coal Mine is located in the Main basin of Singrauli Coalfield, Singrauli District of Madhya Pradesh (~37 km from Singrauli City). The block has been allotted to THDC India Limited, a Mini Ratna Public Sector Undertaking (Joint Venture of NTPC Limited and Government of Uttar Pradesh). THDC has appointed Amelia Coal Mining Limited as their MDO. In FY2023, ACML has begun Overburden Removal and Coal Production. State of Art Technology utilized in Amelia Coal Mine is combination of shovels and dumpers and Surface Miners. Amelia Coal Mine is currently in the ramp-up phase with Peak Rated Capacity (PRC) of 5. 6 Million Tonnes Per Annum. Scope of the MDO includes Access to Site, Fice, deploy HEMM, Operate and Maintain Mine, excavate and deliver coal; Construction and Maintain of Coal Handling Plant (CHP), infrastructure including Conveyor (Mine to Railway Siding), Railway Siding, Approach and Access Roads; Arrange Power Supply, Undertake Land Acquisition, R&R, obtain possession of land, procure and renew EC, FC, licenses, permits, etc.
Major Challenges:
Some of the major challenges includes achieve and maintain peak coal production and overburden removal, ensure safe operation, maintain coal quality, shifting of Project PDFs, facilitate land acquisition, physical possession of land, implementation of R&R policy, construction, operation and maintece of Coal Handling Plant (CHP), Coal Conveyor and Railway Siding, compliance with statutory norms, renewal/ amendment of statutory clearances, undertake progressive mine closure, facilitate smooth operation and comply with the requirements as per terms of contract with THDC, Contractors, Sub-Contractors, etc.