Sr. Engineer - Launch Management

OPmobility SE

Aurangabad

On-site

INR 600,000 - 900,000

Full time

3 days ago
Be an early applicant

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

OPMobility SE in Aurangabad, India, seeks an Engineering Graduate with 3–6 years in the automotive sector to monitor operational financial performance and reporting for new product launches. You will optimize launch cost, ensure smooth SOP handovers to production, and track production readiness, design status, tooling, PFMEA, and capacity to support a zero-event launch.

This role requires coordinating with RD, ME, BD, and suppliers on BOM, material availability, and scheduling, while managing

Qualifications

  • Minimum Qualification: Engineering Graduate.
  • 3–6 years of experience in automotive sector.
  • Automotive industry with the same product range.
  • Process knowledge and familiarity with launch processes.
  • MS Office and SAP PM experience.
  • Strong stakeholder management and teamwork.

Responsibilities

  • Facilitating optimization of Launch Cost, quality and timelines of projects.
  • Ensure smooth handover of the new product to production for SOP.
  • Monitor plant production activity for the first 3 months after SOP.
  • Identify risks in product launches and discuss mitigation with plant CFT for zero-event launches.
  • Track Launch Readiness Criteria across multiple dimensions (design, tooling, PFMEA, capacity, etc.).
  • Track launch cost across all stages and flag deviations in the Launch Readiness Report.

Skills

MS Office
Stakeholder Management
Interpersonal Skills
Team Player
Process Knowledge

Education

Engineering Graduate

Tools

SAP PM

Job description

Operational financial performance Monitoring and reporting
  • a. Facilitating optimization of Launch Cost, quality and timelines of projects.
  • b. Ensure smooth handover of the new product to the production team for SOP.
  • c. Monitor plant production activity for the first 3 months after SOP.
  • d. Risk identification in product launch in plant and discuss mitigation plan in consensus with plant CFT for zero event program launch.
  • e. Track Launch Readiness Criteria in the Launch Readiness Report Format for every program. Metrices are as follows: 1. Design status and PD readiness 2.Tooling, facility and Equipment status 3. Process design Feasibility, Lot Control, PFMEA, control Plan, Operating standards, process data collection, boundary sample boards, process capability, non-conforming material control, container and part labelling 4. Production capacity 5. In-Line and Off-Line Gage readiness 6. Supplier Qualification, supply capacity, Material Delivery and PO, Material Validation 7. Material Flow, End item packaging, Inventory, Manufacturing Plan Development, IT/EDI, shipping and logistics 8. Manpower plan and hiring, associate support, Launch support 9. Quality operating system, safe launch and build support, Engineering Change Control System and Change Point Control, Non-conforming Material Control 10. Matching, Graining, and Color Approval (Trim only), Production Trial Run, Engineering Specification Testing, DFMEA / PFMEA Completion and Integration, PSW Approval
  • f. Track elements of launch cost incurred in all the stage of launch readiness. Track for deviation, if any, using Launch readiness format for every program.
Resource Management
  • a. Ensure assembly line readiness for New Product Development.
  • b. Coordinate for assembly of parts with the approval of concerned authority within the timeline at later sample stages.
  • c. Ensure sample part availability in the plant as per drawing.
  • d. Provide the sample required by the program manager within the target timeline by liaising with RD, ME, BD, and customer regarding BOM, data on shortages, part availability during the assembly stage. Ensure there is no part shortage.
  • e. Check availability of material as per part list/BOM.
  • f. Obtain production slot and run online (in presence of ME, Quality RD members) based on PPC data for the build of NPD and ensure avoidance of mix-up of identical products.
  • g. Monitor kitting loading process executed by production and pass on for quality assurance of the first-made product.
  • h. Provide BOM updates to ME and monitor coordinate for completion of programming (if any).
  • i. Follow up with relevant stakeholders at each stage of the process and provide go-ahead.
  • j. Ensure raw material readiness, child part review, RD software program, and final handover to production and quality FDR.
Stakeholder Management
  • a. Integrating and resolving inter team dependencies and deliverables in plant.
  • b. Cross verify specification received from RD and BC code for every description.
  • c. Coordinate with Quality for cross-checking of BOM.
  • d. Liaise follow up with the production team for line availability, CD ME for jigs, fixtures and machine availability.
  • e. Coordinate for signoff on the checklist with CD for all components, ME for process followed, production for machine programming, and quality for final inspection.
  • f. Ensure smooth handover of the new product to the production team for mass production (SOP+90 days) by ensuring timely closure of issues prior to launch.
  • g. Monitor if program is executed through NPD QA and production teams as per timelines and adherence to quality parameters.
  • h. Risk identification in product launch in plant at every stage using launch readiness report. Escalating to the launch Segment head and discuss mitigation plan in consensus with CFT for zero event program launch.
Qualifications
  • Minimum Qualification required: Engineering Graduate
Work Experience
  • 3 to 6 years of experience
  • Automotive industry with the same product range only
  • Process knowledge
  • MS office, SAP - PM
  • Stakeholder Management
  • Interpersonal Skill
  • Team Player
Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

PROGRAM LAUNCH ENGINEER
PROGRAM LAUNCH ENGINEER

OPmobility • Maharashtra

On-site
INR 900,000 - 1,300,000
Manager - NPD QP - LCV Platform
Manager - NPD QP - LCV Platform

Mahindra & Mahindra Ltd • Chennai

On-site
INR 900,000 - 1,200,000
Head - NPL
Head - NPL

Aumovio SE • Gurugram District

On-site
INR 3,500,000 - 6,000,000
Head - NPL
Head - NPL

Aumovio SE • Gurugram District

On-site
INR 2,500,000 - 5,000,000
Onsite Job
No Referral Bonus
Asst. Manager / Dy. Manager - Program
Asst. Manager / Dy. Manager - Program

Mployee.me • Pune District

On-site
INR 900,000 - 1,300,000
Asst. Manager- Process Quality
Asst. Manager- Process Quality

Tata Ficosa Automotive Systems • Chakan

On-site
INR 2,000,000 - 2,800,000
Deputy Manager - Launch
Deputy Manager - Launch

Tenneco Inc. • Pune District

On-site
INR 2,500,000 - 4,000,000
Deputy Manager - Launch
Deputy Manager - Launch

Tenneco • Maharashtra

On-site
INR 1,600,000 - 2,200,000
Engineer - Customer Material Planner
Engineer - Customer Material Planner

Bloom Engineering • Hosur

On-site
INR 1,200,000 - 1,800,000
Manager Engineering
Manager Engineering

SFS Group • Belagavi

On-site
INR 1,800,000 - 3,000,000