A complete application in a minute
Tailored resume and cover letter, ready to send.
UltraTech Cement Roorkee Cement Works invites a seasoned Mechanical professional to support packing plant operations, organize maintenance, and drive cost optimization through productivity improvements while upholding UTCL safety standards.
Based at Roorkee, Uttarakhand, the role focuses on planning, coordinating, and supervising RMH, clinker handling, and related equipment to ensure maximum despatch targets are met safely and efficiently.
To support Section Head Mechancial by planning, organizing and coordinating operation and maintenance activities, manpower planning, spare parts management and execution of improvement / modification jobs in Packing plant for ensuring maximum plant availability and bringing cost optimization through productivity improvement to meet budgeted despatch targets adhering with UTCL safety standards.
Job Job Context : Roorkee Cement Works Unit is a clinker grinding unit located in Village Nalheri Dehviran, P.O. Anantpur, Tahsil- Roorkee, Dist. Haridwar, Uttarakhand. The company is spread in an area of 19.0777 Ha. The plant is situated on Pohana-Iqbalpur road ((SH-28), at a distance of about 15 km from Roorkee city and 185 km from Delhi. The plant is located at a distance of 5 km from NH-73. The nearest railway station is Roorkee which is 15 km from the plant and nearest airport is Jauligrant which is 65 km from the plant.
To support Section Head Mechancial by planning, organizing and coordinating operation and maintenance activities, manpower planning, spare parts management and execution of improvement / modification jobs in Packing plant for ensuring maximum plant availability and bringing cost optimization through productivity improvement to meet budgeted despatch targets adhering with UTCL safety standards.
Job Job Context : Roorkee Cement Works Unit is a clinker grinding unit located in Village Nalheri Dehviran, P.O. Anantpur, Tahsil- Roorkee, Dist. Haridwar, Uttarakhand. The company is spread in an area of 19.0777 Ha. The plant is situated on Pohana-Iqbalpur road ((SH-28), at a distance of about 15 km from Roorkee city and 185 km from Delhi. The plant is located at a distance of 5 km from NH-73. The nearest railway station is Roorkee which is 15 km from the plant and nearest airport is Jauligrant which is 65 km from the plant.
Rated production capacity of the unit is 1.2 MTPA. Presently it is capable of producing 1.5 MTPA due to enhanced output rate of production.
The unit was commissioned in 2nd Jan 2010 and despatch was commenced wef from 18th Jan 2010. The Unit has achieved increased output rate by and surpassed the rated capacity of 165 TPH, with increased fly ash absorption > 32% and reduction in total specific energy consumption close to 30 kWH/T.
The company gets 100% excise exemption for 10 years and 100% income tax exemption for initial 5 years and 30% for further 5 years. Merit of Certificate for best Energy Conservation by Bureau of Energy Efficiency (BEE), Ministry of Power, Govt. of India was awarded to JRCGU in the year 2012-13.consumptions.
KRA1 Accountability- Supervise & coordinate all the Mechanical activities of packing plant to maximize the plant availability to achieve continuous
production as per targets * Take regular packing plant rounds /study check list daily and identify problems.
* Coordinate with other departments for jobs. *
Updating of daily & weekly checklist.
KRA2 Cost Control Support SH Mechanical in budget preparation based on past data and future requirements.
Check consumption pattern equipment-wise with respect to budget and Take corrective actions.
Arrange manpower requirement in coordination with other section to control overtime & contractor cost.
Monitor the indents / inventory
Avoid idle running of packer and equipment’s
Cost Control-reduction in bag bust age.
Mechanize / improve handling system of materials.
Propose changes / modification for attending leakages.
Reduction in section cost by reducing breakdowns.
KRA3 Management Information System 1. Ensuring timely submission of monthly MIS / Presentations and Reports.
KRA4 Focus on SHE (Safety, Health & Environment) along with Sustainability initiatives.
KRA5 System Management
(Effective implementation of all IMS and other systems requirements through involvement for continuous improvement in plant working condition & quality standards) -To implement improvement project to reduce repetitive problems/breakdown or losses.