Aditya Birla's Harihar Polyfibers plant seeks a Power Plant Maintenance professional to organize and monitor maintenance to improve reliability and ensure uninterrupted steam and power for continuous production. You will lead safety, environmental, and IBR-compliance initiatives to maintain operational excellence.
The role focuses on organizing daily maintenance, coordinating with operations for preventive and breakdown maintenance, and implementing standard procedures to optimize equipment
Country India
DCS (Distributed Control System) Shift Management Power Plant Operations Steam Turbines Steam Systems Safety Environment Boiler Operations
Bachelor Of Engineering Masters of Mechanical Engg.
Organize, implement and monitor Power Plant Maintenance to improve the reliability & availability of mechanical equipment to achieve targeted Production with Zero quality losses, Delivery & Environmental losses, ensuring compliance to safety, environmental & Indian Boiler Regulation (IBR) norms.
Job Context
Harihar Polyfibers was started in 1972 with 100 TPD production using indigenous machinery and technology. This is the only integrated Pulp & Fibre units in the business, which demands for continuous availability of Pulp for our Fibre plant. Currently plant is operating at 210 TPD production.
Steam & Power generated and distributed from the Captive Power Plant is a key factor for quality & throughput in continuous pulp production process. Hence maintaining an uninterrupted supply of steam/power is an essential requirement for the CPP. Over period of time, there has been technological upgradations/modifications in TG Set & Recovery Boiler which has led to stringent operation & maintenance requirements. The Captive Power Plant works with High pressure Recovery Boiler & TG set, which are critical equipment subject to stringent legal, safety and environmental requirements.
Hence CPP operations cater to plant requirements in a demanding scenario.
Major Challenges
Sustain Power Plant equipment availability under highly corrosive environment
Maintenance actions to increase uptime of old machinery to sustain production levels
Continued development/indigenization of imported equipment parts & spares
Due to intensive manual operations it’s a challenge to ensure safety of employees
KRA (Accountabilities) (Max 1325 Characters)
Supporting Actions (Max 1325 Characters)
KRA1 Maintenance
Managing day to day maintenance activities Organize & control daily maintenance activities of Power Plant equipment to ensure the availability of all equipment.
Coordinate Preventive Maintenance / breakdown maintenance / stoppage with operations
Prepare & Implement Standard Maintenance Procedures (SMP) for all equipment.
Prepare & Monitor Equipment Maintenance Plan (PM schedules & Lubrication schedules)
Analyse & take actions based on Predictive / Preventive maintenance trends
Ensure Spares and Assembly Preparation
Integrate Maintenance activities with Condition monitoring and Planning Cell
KRA2 Cost Optimization
To initiate cost reduction plan/measures. Control overtime & initiate corrective actions to minimize overtime
Perform Life Value analysis for design and Material of Construction Change & implement actions
Improve productivity by eliminating Non Value Adding activities & wastages in the section.
Monitor SOP compliance to avoid equipment stoppage/breakdown
Implement cost effective practically applicable budget schemes to ensure Work services are met.
KRA3 Spares Management Ensure optimum availability of spares & consumables
Execute inspection of equipment / spares periodically
Coordinate for localization of high value & high lead time OEM spares by interacting with vendors
Develop sub component drawings and specifications
Monitor & ensure sub assembly inter-changeability for continuous availability of equipment
KRA4 Continuous Improvement Projects Implement the proposed projects ensuring that all SOPs are followed
KRA5 Ensure Safety & Environment Compliance Implement improvement actions to reduce pollution at source
Implement safety standards in section as per unit safety guidelines in accordance with PSAP
Implement & close the safety & environment audit observations
Follow environmental standards for smooth plant operations
Ensure proper handling of hazardous chemicals
Ensure immediate rectification in case of abnormalities
Implement processes for energy saving & resource conservation
Implement & monitor energy efficient products and services.
KRA6 System Implementation Implementation of QMS, EMS, EnMS & OHSMS
Implementation of departmental objectives & targets
Implementation of SAP activities