FLO-Power Plant (JB 11)

Aditya Birla

Harihara

On-site

INR 700,000 - 1,100,000

Full time

28 hours ago
Be an early applicant

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

Aditya Birla Group is seeking a Power Plant Maintenance professional to organize and monitor maintenance activities for a captive CPP. The role focuses on ensuring high equipment availability, adherence to IBR norms, and safe operation in a highly corrosive industrial environment.

The incumbent will coordinate preventive and breakdown maintenance, develop SMPs, and drive continuous improvement in maintenance practices to support continuous pulp production and energy optimization.

Qualifications

  • Experience in power plant maintenance operations.
  • Knowledge of maintenance planning and control.
  • Familiarity with safety and compliance norms.

Responsibilities

  • Organize and control daily maintenance of power plant equipment.
  • Coordinate preventive, breakdown maintenance and stoppages with operations.
  • Prepare and implement standard maintenance procedures (SMP).
  • Monitor and update maintenance plans and lubrication schedules.
  • Analyze maintenance trends and take corrective actions.
  • Coordinate spares planning and integration with condition monitoring.

Skills

Maintenance planning
Preventive maintenance
Safety awareness
Problem solving
Team coordination

Tools

SAP

Job description

At the Aditya Birla Group, our Corporate Vision is aligned and intricately woven with our People Vision.

Job Description:
Job Purpose

Organize, implement and monitor Power Plant Maintenance to improve the reliability & availability of mechanical equipment to achieve targeted Production with Zero quality losses, Delivery & Environmental losses, ensuring compliance to safety, environmental & Indian Boiler Regulation (IBR) norms.

Job Context

Harihar Polyfibers was started in 1972 with 100 TPD production using indigenous machinery and technology. This is the only integrated Pulp & Fibre units in the business, which demands for continuous availability of Pulp for our Fibre plant. Currently plant is operating at 210 TPD production. Steam & Power generated and distributed from the Captive Power Plant is a key factor for quality & throughput in continuous pulp production process. Hence maintaining an uninterrupted supply of steam/power is an essential requirement for the CPP. Over period of time, there has been technological upgradations/modifications in TG Set & Recovery Boiler which has led to stringent operation & maintenance requirements. The Captive Power Plant works with High pressure Recovery Boiler & TG set, which are critical equipment subject to stringent legal, safety and environmental requirements. Hence CPP operations cater to plant requirements in a demanding scenario.

Major Challenges
  • Sustain Power Plant equipment availability under highly corrosive environment
  • Maintenance actions to increase uptime of old machinery to sustain production levels
  • Continued development/indigenization of imported equipment parts & spares
  • Due to intensive manual operations it’s a challenge to ensure safety of employees
Key Result Areas

KRA (Accountabilities) (Max 1325 Characters)

Supporting Actions (Max 1325 Characters)

KRA1 Maintenance

Managing day to day maintenance activities

  • Organize & control daily maintenance activities of Power Plant equipment to ensure the availability of all equipment.
  • Coordinate Preventive Maintenance / breakdown maintenance / stoppage with operations
  • Prepare & Implement Standard Maintenance Procedures (SMP) for all equipment.
  • Prepare & Monitor Equipment Maintenance Plan (PM schedules & Lubrication schedules)
  • Analyse & take actions based on Predictive / Preventive maintenance trends
  • Ensure Spares and Assembly Preparation
  • Integrate Maintenance activities with Condition monitoring and Planning Cell
KRA2 Cost Optimization

To initiate cost reduction plan/measures.

  • Control overtime & initiate corrective actions to minimize overtime
  • Perform Life Value analysis for design and Material of Construction Change & implement actions
  • Improve productivity by eliminating Non Value Adding activities & wastages in the section.
  • Monitor SOP compliance to avoid equipment stoppage/breakdown
  • Implement cost effective practically applicable budget schemes to ensure Work services are met.
KRA3 Spares Management
  • Ensure optimum availability of spares & consumables
  • Execute inspection of equipment / spares periodically
  • Coordinate for localization of high value & high lead time OEM spares by interacting with vendors
  • Develop sub component drawings and specifications
  • Monitor & ensure sub assembly inter-changeability for continuous availability of equipment
KRA4 Continuous Improvement Projects

Implement the proposed projects ensuring that all SOPs are followed

KRA5 Ensure Safety & Environment Compliance
  • Implement improvement actions to reduce pollution at source
  • Implement safety standards in section as per unit safety guidelines in accordance with PSAP
  • Implement & close the safety & environment audit observations
  • Follow environmental standards for smooth plant operations
  • Ensure proper handling of hazardous chemicals
  • Ensure immediate rectification in case of abnormalities
  • Implement processes for energy saving & resource conservation
  • Implement & monitor energy efficient products and services.
KRA6 System Implementation
  • Implementation of QMS, EMS, EnMS & OHSMS
  • Implementation of departmental objectives & targets
  • Implementation of SAP activities
  • Discover more about life at Aditya Birla Group
Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

FLO-Power Plant (JB 11)
FLO-Power Plant (JB 11)

Aditya Birla • Harihara

On-site
INR 650,000 - 950,000
FLO Boiler (JB 10/11)
FLO Boiler (JB 10/11)

Aditya Birla • Davanagere

On-site
INR 600,000 - 900,000
FLO Boiler (JB 10/11)
FLO Boiler (JB 10/11)

Aditya Birla • Davanagere

On-site
INR 600,000 - 900,000
FLO CPP Mech Maint
FLO CPP Mech Maint

GRASIM INDUSTRIES LIMITED ( ADITYA BIRLA GROUP) • Madhya Pradesh

On-site
INR 600,000 - 1,000,000
FLE - Mechanical (Boiler)
FLE - Mechanical (Boiler)

Aditya Birla • Ganjam

Remote
INR 900,000 - 1,500,000
AH Desk Engineer
AH Desk Engineer

Aditya Birla • Madhya Pradesh

On-site
INR 1,200,000 - 1,800,000
PF Mechanical (Kiln & Cooler)
PF Mechanical (Kiln & Cooler)

Aditya Birla • Nathdwara

On-site
INR 850,000 - 1,400,000
PF Process (CRO & Raw Mill )
PF Process (CRO & Raw Mill )

UltraTech Cement Ltd. • Rajasthan

On-site
INR 1,200,000 - 1,800,000
PF Process (CRO & Raw Mill )
PF Process (CRO & Raw Mill )

Aditya Birla Group • Rajasthan

On-site
INR 500,000 - 700,000
PF Mechanical (Kiln & Cooler)
PF Mechanical (Kiln & Cooler)

Aditya Birla • Nathdwara

On-site
INR 900,000 - 1,300,000