ELV Site Engineer (Data Center Constructions)

Sterling & Wilson

Navi Mumbai

On-site

INR 800,000 - 1,200,000

Full time

10 days ago

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Sterling & Wilson in Navi Mumbai is seeking an experienced ELV site supervisor to oversee the installation and integration of CCTV, access control, cabling, fiber optics, PA and related ELV systems on data center projects.

You will review layouts, shop drawings, and submittals; coordinate with MEP teams; monitor progress and ensure safety, quality, and timely execution per approved methods.

Qualifications

  • 510 years of experience in ELV installation and execution, preferably in data center construction projects.
  • Strong knowledge of CCTV, Access Control, Structured Cabling, Fiber Optics, and other ELV systems.
  • Ability to interpret ELV layouts, schematics, and technical specifications.
  • Experience in testing, commissioning, quality inspections, and coordination with multiple MEP disciplines.
  • Proficiency in AutoCAD and MS Office preferred.

Responsibilities

  • Supervise and execute ELV system installations as per approved drawings, specifications, and project schedules.
  • Oversee installation of CCTV, Access Control, Structured Cabling, Fiber Optics, Public Address (PA), Intercom, and other ELV systems.
  • Review ELV layouts, shop drawings, schematics, and technical submittals before execution.
  • Coordinate with electrical, IT, civil, security, and other MEP teams for interface management.
  • Monitor daily site progress, manpower deployment, material availability, and subcontractor activities.
  • Ensure compliance with project quality standards, inspection procedures, safety requirements, and approved method statements.
  • Coordinate testing, commissioning, system integration, and troubleshooting of ELV systems.
  • Maintain inspection reports, testing records, as-built drawings, and punch-list closure documentation.
  • Coordinate with consultants, vendors, and project management teams to resolve site issues and ensure timely execution.

Tools

AutoCAD
MS Office

Job description

Role & responsibilities
  • Supervise and execute ELV system installations as per approved drawings, specifications, and project schedules.
  • Oversee installation of CCTV, Access Control, Structured Cabling, Fiber Optics, Public Address (PA), Intercom, and other ELV systems.
  • Review ELV layouts, shop drawings, schematics, and technical submittals before execution.
  • Coordinate with electrical, IT, civil, security, and other MEP teams for interface management.
  • Monitor daily site progress, manpower deployment, material availability, and subcontractor activities.
  • Ensure compliance with project quality standards, inspection procedures, safety requirements, and approved method statements.
  • Coordinate testing, commissioning, system integration, and troubleshooting of ELV systems.
  • Maintain inspection reports, testing records, as-built drawings, and punch-list closure documentation.
  • Coordinate with consultants, vendors, and project management teams to resolve site issues and ensure timely execution.
Preferred candidate profile
  • 510 years of experience in ELV installation and execution, preferably in data center construction projects.
  • Strong knowledge of CCTV, Access Control, Structured Cabling, Fiber Optics, and other ELV systems.
  • Ability to interpret ELV layouts, schematics, and technical specifications.
  • Experience in testing, commissioning, quality inspections, and coordination with multiple MEP disciplines.
  • Proficiency in AutoCAD and MS Office preferred.
Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Sie Engineer - ELV - HYD 124
Sie Engineer - ELV - HYD 124

Larsen & Toubro Limited • Hyderabad

On-site
INR 600,000 - 900,000
ELV SME
ELV SME

Jones Lang LaSalle (JLL) • Gandhinagar

On-site
INR 1,800,000 - 3,000,000
ELV Design Engineer
ELV Design Engineer

Yakkaservices • Thanjavur

On-site
INR 1,200,000 - 2,000,000
Competitive salary
Incentives
Training programs
+2
ELV Engineer
ELV Engineer

Sammraksha Digital Security Systems • Ernakulam, Bhopal, Vadodara

Hybrid
INR 350,000 - 520,000
Project Manager - ELV
Project Manager - ELV

Black Box • Mumbai

On-site
INR 2,000,000 - 3,500,000
Elv Design Engineer
Elv Design Engineer

AIR Treament Engineering Private Limited • Ahmedabad District

On-site
INR 1,800,000 - 2,400,000
ELV Commissioning Engineer
ELV Commissioning Engineer

Yakkaservices • Thanjavur

On-site
INR 600,000 - 800,000
Competitive salary
Performance-based incentives
Training and skill development
+3
Manager ELV
Manager ELV

Updater Services (UDS) • New Delhi

On-site
INR 1,800,000 - 2,500,000
ELV SIte Engineer
ELV SIte Engineer

Neetdeep Group • Ahmedabad District

On-site
INR 279,000 - 446,000
Project Manager - ELV (Data Center)
Project Manager - ELV (Data Center)

Turner & Townsend • Mumbai

On-site
INR 1,800,000 - 2,800,000