Electrical Engineer (Data Center Construction)

Arbeit Infotech

Desa Ciranjeng

On-site

IDR 167,400,000 - 267,840,000

Full time

7 days ago
Be an early applicant
Application generator

An application made for this job — a tailored resume and cover letter that speak straight to the posting.

Get past ATS filters

Job summary

Arbeit Infotech is hiring an experienced Commissioning Engineer – Electrical to support the data centre commissioning activities in West Java, Indonesia. The role focuses on LV/MV systems, switchgear, UPS, generators, and IST readiness.

The ideal candidate holds a Bachelor’s/Diploma in Electrical Engineering with at least 2 years of electrical testing and commissioning experience, preferably on data centre projects, and strong coordination and communication skills for cross-team collaboration.

Qualifications

  • Bachelor’s/Diploma degree in Electrical Engineering or a related field.
  • Minimum 2 years of experience in electrical testing & commissioning.
  • Experience in Data Centre projects is highly preferred.
  • Strong knowledge of electrical systems including UPS, transformers, switchgear, ATS/STS, and distribution systems.
  • Experience with testing and commissioning procedures, documentation, and troubleshooting.
  • Familiar with electrical safety standards and commissioning practices.
  • Strong coordination and communication skills.
  • Able to work independently and as part of a project team.

Responsibilities

  • Plan, coordinate, and execute electrical commissioning activities for data centre systems.
  • Review electrical drawings, specifications, method statements, and commissioning procedures.
  • Conduct testing and commissioning of LV/MV electrical systems, including switchgear, transformers, UPS, generators, ATS/STS, and related systems.
  • Perform functional and performance testing of electrical equipment and systems.
  • Coordinate with contractors, consultants, vendors, and other project teams during commissioning activities.
  • Identify, troubleshoot, and resolve electrical issues during testing and commissioning.
  • Prepare and review commissioning test scripts, checklists, and reports.
  • Ensure all commissioning activities comply with project specifications, safety requirements, and applicable standards.
  • Monitor and document testing results, defects, and rectification works.
  • Support integrated systems testing (IST) and ensure systems are ready for handover.
  • Assist with the preparation of commissioning and handover documentation.

Skills

Electrical testing
Commissioning
Coordination
Communication

Education

Bachelor’s/Diploma in Electrical Engineering

Job description

Electrical Engineer (Data Center Construction)

WE ARE HIRING – COMMISSIONING ENGINEER (ELECTRICAL)

Location: Cikarang, West Java

Project: Data Centre Project

We are looking for an experienced Commissioning Engineer – Electrical to join our team and support the commissioning activities for a data centre project.

Responsibilities
  • Plan, coordinate, and execute electrical commissioning activities for data centre systems.
  • Review electrical drawings, specifications, method statements, and commissioning procedures.
  • Conduct testing and commissioning of LV/MV electrical systems, including switchgear, transformers, UPS, generators, ATS/STS, and related systems.
  • Perform functional and performance testing of electrical equipment and systems.
  • Coordinate with contractors, consultants, vendors, and other project teams during commissioning activities.
  • Identify, troubleshoot, and resolve electrical issues during testing and commissioning.
  • Prepare and review commissioning test scripts, checklists, and reports.
  • Ensure all commissioning activities comply with project specifications, safety requirements, and applicable standards.
  • Monitor and document testing results, defects, and rectification works.
  • Support integrated systems testing (IST) and ensure systems are ready for handover.
  • Assist with the preparation of commissioning and handover documentation.
Requirements
  • Bachelor’s/Diploma degree in Electrical Engineering or a related field.
  • Minimum 2 years of experience in electrical testing & commissioning.
  • Experience in Data Centre projects is highly preferred.
  • Strong knowledge of electrical systems, including UPS, generators, transformers, switchgear, ATS/STS, and distribution systems.
  • Experience with testing and commissioning procedures, documentation, and troubleshooting.
  • Familiar with electrical safety standards and commissioning practices.
  • Strong coordination and communication skills.
  • Able to work independently and as part of a project team

Information Technology Services 51-100 employees

Arbeit is an IT-driven, Innovation-obsessed Consulting Firm with years of unparalleled expertise at helping telcos and other telecom-connected enterprises achieve enviable success in their business.

Arbeit is an IT-driven, Innovation-obsessed Consulting Firm with years of unparalleled expertise at helping telcos and other telecom-connected enterprises achieve enviable success in their business.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Data Center Electrical Commissioning Engineer
Data Center Electrical Commissioning Engineer

Arbeit Infotech • Desa Ciranjeng

On-site
IDR 167,400,000 - 267,840,000
Commissioning (CX) Engineer (Data Center)
Commissioning (CX) Engineer (Data Center)

PT Talenta Eksekutif Asia • Jakarta Pusat

On-site
IDR 350,000,000 - 550,000,000
Commissioning (CX) Engineer (Data Center)
Commissioning (CX) Engineer (Data Center)

PT Talenta Eksekutif Asia • Tangerang

On-site
IDR 240,000,000 - 360,000,000
Commissioning (CX) Engineer (Data Center)
Commissioning (CX) Engineer (Data Center)

PT Talenta Eksekutif Asia • Depok

On-site
IDR 360,000,000 - 700,000,000
Electrical Commissioning Lead (Data Centre Project Delivery) – Indonesia
Electrical Commissioning Lead (Data Centre Project Delivery) – Indonesia

Erthamilestone • Daerah Khusus Ibukota Jakarta

On-site
IDR 240,000,000 - 360,000,000
Work Visa sponsorship
Project Engineer (Data Center)
Project Engineer (Data Center)

Arbeit Infotech • Desa Ciranjeng

On-site
IDR 200,880,000 - 357,120,000
Power Engineer (Data Center) - Cikarang
Power Engineer (Data Center) - Cikarang

Arbeit Infotech • Desa Ciranjeng

On-site
IDR 180,000,000 - 240,000,000
Senior Commissioning Manager – Electrical
Senior Commissioning Manager – Electrical

CTA Comtech Asia • Indonesia

On-site
IDR 890,630,000 - 1,425,009,000
Commissioning Engineer
Commissioning Engineer

MatchaTalent • Jakarta Selatan

On-site
IDR 260,000,000 - 420,000,000
Commissioning Engineer
Commissioning Engineer

MatchaTalent • Tangerang Selatan

On-site
IDR 500,000,000 - 900,000,000
Travel opportunities