Senior Planner - HVP

Bilfinger Berger SE

Manchester

On-site

GBP 70,000 - 110,000

Full time

14 days+
Application generator

A complete application in a minute — tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Bilfinger UK, an engineering and maintenance leader, seeks a Senior Planner for a complex LAES project in Greater Manchester. You will develop and maintain cost-loaded schedules, manage progress updates, and drive schedule risk analysis across the full lifecycle of the project.

Key duties include coordinating with engineering and commercial teams, producing detailed lookahead schedules, and ensuring NEC4 compliance. Strong Primavera P6 and MS 365 skills required.

Qualifications

  • Minimum of 8 years’ experience in an EPC environment.
  • NEC3/4 qualification and/or significant experience.
  • Expert level Primavera P6 planning software.
  • Capability in Microsoft 365 applications (MS Office, Teams, etc.)
  • Strong communication and analytical skills.
  • APM, AcostE or APE membership/qualification.
  • Certified Oracle P6 Training (P102 & P106).
  • Power BI, Power Platform and SAP experience.

Responsibilities

  • Develop and manage all scheduling processes and documents.
  • Create cost and resource loaded Primavera P6 schedules.
  • Embed schedule risk management and QSRA.
  • Coordinate with PMs, engineers and commercial to align cost, cashflow, and resources.
  • Manage NEC4 compliant progress updates and reporting.
  • Produce monthly reporting outputs (S-Curves, manpower histograms).
  • Support cost engineering and earned value management requirements.
  • Assist in best-practice project controls across the business.

Skills

Primavera P6
Power BI
MS Office
Strong communication
Power Platform
SAP experience

Education

BSc / BEng / MSc in Engineering or Construction Project Management
NEC3/4 qualification
APM, AcostE or APE membership
Oracle P6 training (P102/P106)

Tools

Primavera P6
Power BI
Power Platform
SAP

Job description

Bilfinger UK is a leading engineering and maintenance provider, supporting customers across the chemical & petrochemical, nuclear, oil & gas, pharmaceuticals & biopharma, power & energy, utilities, renewables and food & beverage markets. We enhance the efficiency of assets, ensuring a high level of availability and reducing maintenance costs.

We have extensive experience in offshore and onshore facilities; specialising in asset management services throughout all life cycle phases from consulting, engineering, manufacturing, assembly, operations, maintenance, and decommissioning.

This commitment is delivered by an experienced and highly competent workforce of over 4,500 employees operating from 14 offices in strategic industrial hubs, upholding the highest standards of safety, compliance and quality.

Highview Power Carrington – LAES Project (FOAK)
50MW / 300MWh Liquid Air Energy Storage Facility | Greater Manchester

The project utilisesproprietary LAES technology, converting surplus renewable electricity into stored liquid air, with later pressurisation and reheating to drive turbines for electricity generation.

  • Principal contractor forMechanical, Electrical & Instrumentation (MEI) construction, includingstructural steelwork
  • Delivery of complex, safety‑critical systems within a novel technology environment
  • Working within a largehigh‑performing, multi‑disciplinary integrated delivery teamon a technically challenging FOAK scheme

A landmark project combining innovation, engineering excellence, and collaboration to deliver one of the UK’s most advanced energy storage assets.

The Role

The Senior Planner is responsible for the creation and maintenance of all project schedules across the full lifecycle of the project, inclusive of all required supporting documentation, procedures and standards. These responsibilities range from liaising with the business development, engineering and project management teams to develop a fully cost and resource loaded schedule for tender / contractual submissions, through to the management of the periodic progress updates and submissions with all required reporting outputs.

Key Responsibilities

The responsibilities of the Senior Planner include (but are not limited to):

  • Development and management of all key scheduling processes and key documentation (inclusive of robust basis of schedule, WBS/OBS/CBS structures, Cost Accounts, activity coding structures)
  • Development and management of all required fully cost and resource loaded Primavera P6 schedules as needed for the Project, inclusive of integrated master schedules, detailed construction schedules (level 4 / 5) and periodic lookahead schedules.
  • Embedding schedule risk management best practices, ensuring that all schedules contain appropriate time risk allowances using Quantitative Schedule Risk Management Analysis (QSRA).
  • Management of the alignment and interaction between the schedule, project cost estimate / cashflow and resource forecasting and utilisation.
  • Establish effective change control management including the use of techniques such as critical path analysis and float erosion to provide early warning of potential issues.
  • To establish and manage the periodic progress capture, schedule update and submission process and outputs in-line with NEC4 requirements.
  • Development and production of all required monthly reporting outputs (e.g. planned vs actual progress reporting / narrative, S-Curves, manpower histograms)
  • Work closely with the Project Controls Manager and commercial teams to establish cost engineering systems to monitor, control and report costs (inclusive of all Earned Value Management output requirements).
  • Provide contract management support including development of bespoke and/or generic rules of credit, KPI development and monitoring, NEC programme acceptance management and production / assessment of compensation event impact schedules
  • Liaise with PMs/RDs to manage the provision of appropriate resources and expertise to successfully deliver the project control activities
  • Support the wider business with the identification and adoption of project controls best practices

Qualifications & Experience

  • Minimum of 8 years’ experience in an EPC environment
  • NEC3/4 qualification and/or significant experience
  • Expert level capability in the use of Primavera P6 planning software
  • Capability in Microsoft 365 applications (MS Office, teams, etc.)
  • Strong communication skills both verbal and written, plusstrong analytical skills
  • BSc / BEng / MSc in Engineering, Construction Project Management or relevant subject
  • APM, AcostE or APE membership and/or qualification
  • Certified Oracle P6 Training (P102 & P106)
  • Power BI, Power Platform and SAP experience
Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Senior Planner - HVP
Senior Planner - HVP

Bilfinger Berger SE • Carrington

On-site
GBP 70,000 - 90,000
Senior Planner - HVP
Senior Planner - HVP

Bilfinger UK • Carrington

On-site
GBP 70,000 - 90,000
Senior Project Planner
Senior Project Planner

NES Fircroft • United Kingdom

Hybrid
GBP 50,000 - 70,000
Competitive Salary
Company Car / Allowance
Bonus
+1
Senior Principal Planner
Senior Principal Planner

Airswift • Greater London

On-site
GBP 80,000 - 110,000
Senior Project Planner
Senior Project Planner

Airswift • Manchester

On-site
GBP 55,000 - 85,000
Senior Project Planner - Energy & Natural Resources
Senior Project Planner - Energy & Natural Resources

Turner & Townsend • Tees Valley

On-site
GBP 65,000 - 90,000
Senior Planner
Senior Planner

Mercury • Greater London

On-site
GBP 70,000 - 110,000
MEH Planner - Nuclear
MEH Planner - Nuclear

Vulcain Engineering Group • Ipswich

On-site
GBP 65,000 - 90,000
Project Planner
Project Planner

AtkinsRéalis • Greater London

On-site
GBP 45,000 - 65,000
Planning Engineer
Planning Engineer

Cobalt Consulting (UK) Ltd • Greater London

On-site
GBP 58,500 - 71,500