Nuclear Commissioning Planner | Hybrid & P6 Expert

Assystem

Bradley Stoke

Hybrid

GBP 65,000 - 90,000

Full time

14 days+

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Benefits offered by this job

25 days annual leave
Private medical insurance
Competitive salary and bonus
Professional development support
Life assurance
Collaborative team environment
Hybrid working

Job summary

Assystem is seeking a Commissioning Planning Engineer to join the IPC function at Hinkley Point C. You will own and maintain the Level 2/4 Integrated Work Schedule in Primavera P6 and coordinate across Cost, Risk and Earned Value disciplines to keep the programme on track.

The role is embedded from commissioning through energisation, with hybrid working and a base at HPC Bridgwater, requiring the ability to travel to site as needed and to operate at senior leadership level.

Qualifications

  • Primavera P6 experience.
  • Worked in engineering or construction before would be ideal.
  • Nuclear experience is a bonus — the right major programme background will be considered.

Responsibilities

  • Own and maintain the master IWS in Primavera P6, fully logic-linked and aligned to the Work Breakdown Structure.
  • Be the central point of contact for schedule performance — coordinating across Cost, Risk, Estimating, and Earned Value disciplines.
  • Drive the Trend & Change process, identifying risks and opportunities at project level.
  • Produce programme-level schedule reports and present performance insights to senior leadership.
  • Act as the intelligent centre of planning — the person teams turn to when they need clarity.

Skills

Primavera P6

Tools

Primavera P6

Job description

Assystem is seeking a Commissioning Planning Engineer to join the IPC function at Hinkley Point C. You will own and maintain the Level 2/4 Integrated Work Schedule in Primavera P6 and coordinate across Cost, Risk and Earned Value disciplines to keep the programme on track.

The role is embedded from commissioning through energisation, with hybrid working and a base at HPC Bridgwater, requiring the ability to travel to site as needed and to operate at senior leadership level.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Commissioning Planning Engineer - Nuclear IPC (Hybrid)
Commissioning Planning Engineer - Nuclear IPC (Hybrid)

Assystem • West of England

Hybrid
GBP 65,000 - 90,000
25 days leave and holidays
Private medical insurance
Salary and performance bonus
+3
Hybrid Commissioning Planning Engineer - Nuclear Project
Hybrid Commissioning Planning Engineer - Nuclear Project

Assystem • Newport

Hybrid
GBP 60,000 - 85,000
25 days annual leave + bank holidays
Private medical insurance
Competitive salary and performance
+4
Planner
Planner

Assystem • Newport

Hybrid
GBP 60,000 - 85,000
25 days annual leave + bank holidays
Private medical insurance
Competitive salary and performance
+4
Planner
Planner

Assystem • Bradley Stoke

Hybrid
GBP 65,000 - 90,000
25 days annual leave
Private medical insurance
Competitive salary and bonus
+4
Planner
Planner

Assystem • West of England

Hybrid
GBP 65,000 - 90,000
25 days leave and holidays
Private medical insurance
Salary and performance bonus
+3
Nuclear IPC Planning & Scheduling Engineer
Nuclear IPC Planning & Scheduling Engineer

EDF Energy Limited • Stogursey

Remote
GBP 65,000 - 90,000
IPC Planning Engineer – P6 Scheduling & Controls
IPC Planning Engineer – P6 Scheduling & Controls

EDF • Bridgwater

On-site
GBP 70,000 - 90,000
Nuclear Electrical Commissioning Engineer – Hybrid
Nuclear Electrical Commissioning Engineer – Hybrid

Assystem • Wedmore

Hybrid
GBP 50,000 - 75,000
Hybrid working
25 days annual leave
8% pension contributions
+5
Senior Project Planner – Nuclear & Major Infrastructure
Senior Project Planner – Nuclear & Major Infrastructure

ASSYSTEM • Stogursey

Hybrid
GBP 55,000 - 85,000
Hybrid working
25 days annual leave
Company pension
+2
Nuclear LV Commissioning Engineer - Hybrid/On-Site
Nuclear LV Commissioning Engineer - Hybrid/On-Site

Assystem • Bridgwater

Hybrid
GBP 60,000 - 90,000
Hybrid Working
Annual Leave
Pension Contributions
+10