Lead HSE Manager, Data Centre Construction

Walker & Sloan

Greater London

On-site

GBP 70,000 - 90,000

Full time

5 days ago
Be an early applicant
Application generator

An application made for this job — a tailored resume and cover letter that speak straight to the posting.

Get past ATS filters

Benefits offered by this job

Car allowance (eligible roles)
Competitive pension scheme
Electric vehicle scheme
Cycle to Work scheme
25 days holiday + Bank Holidays + BDay

Job summary

Walker & Sloan is recruiting an experienced HSE Manager to support a major hyperscale data centre project in Hayes, West London. The role is hands-on, involving on-site leadership, risk assessment reviews and ensuring compliance with legal, client and company requirements.

You will engage with site operatives through to senior management, delivering inductions, toolbox talks and continuous improvement of HSE processes in a complex mission-critical environment.

Qualifications

  • Experience as a construction HSE professional on large, fast-paced projects.
  • Knowledge of ISO 45001, ISO 14001 and ISO 9001 and practical site controls.
  • Ability to challenge unsafe behaviour professionally and constructively.

Responsibilities

  • Support project team in implementing robust HSE standards across all activities.
  • Carry out site inspections, audits and behavioural observations; ensure closure of actions.
  • Investigate incidents/near misses and drive root-cause analyses.
  • Deliver inductions, toolbox talks and workforce briefings to subcontractors.
  • Develop and enhance HSE processes for a mission-critical environment.

Skills

Risk assessments
Audits & inspections
Incident investigations
Site safety management
Workforce engagement
Leadership & stakeholder management
HSE process development

Education

NEBOSH Diploma or NVQ Level 5 Diploma in Occupational Health & Safety
IOSH membership
CSCS Card
UK driving licence

Job description

Walker & Sloan is recruiting an experienced HSE Manager to support a major hyperscale data centre project in Hayes, West London. The role is hands-on, involving on-site leadership, risk assessment reviews and ensuring compliance with legal, client and company requirements.

You will engage with site operatives through to senior management, delivering inductions, toolbox talks and continuous improvement of HSE processes in a complex mission-critical environment.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Health and Safety Manager
Health and Safety Manager

Walker & Sloan • Greater London

On-site
GBP 70,000 - 90,000
Car allowance (eligible roles)
Competitive pension scheme
Electric vehicle scheme
+2
Senior Design Manager — Hyperscale Data Centre Lead
Senior Design Manager — Hyperscale Data Centre Lead

Walker & Sloan • Ealing

On-site
GBP 90,000 - 110,000
Car Allowance
Competitive Pension Scheme
BUPA Healthcare & Cash Plan
+4
HSW Lead: Safety, Culture & Compliance Leader
HSW Lead: Safety, Culture & Compliance Leader

Smart 4 EPC • City Of London

On-site
GBP 90,000 - 130,000
Global EHS Lead – Hyperscale Data Centre Construction
Global EHS Lead – Hyperscale Data Centre Construction

Spencer Ogden • Greater London

On-site
GBP 90,000 - 130,000
Project Manager – Hyperscale Data Centre Infrastructure
Project Manager – Hyperscale Data Centre Infrastructure

Walker & Sloan Ltd | Certified B Corp • Corsham

On-site
GBP 70,000 - 85,000
Car allowance
Pension
Healthcare
+4
Senior HSE Lead – Construction (Data Centre) + Car Allowance
Senior HSE Lead – Construction (Data Centre) + Car Allowance

Kenton Black • High Wycombe

On-site
GBP 50,000 - 70,000
Environmental Health Safety Lead
Environmental Health Safety Lead

Spencer Ogden • Greater London

On-site
GBP 90,000 - 130,000
Senior Design Manager: Lead Hyperscale Data Centre Design
Senior Design Manager: Lead Hyperscale Data Centre Design

Walker & Sloan • Bath

On-site
GBP 85,000 - 95,000
Electric Vehicle Scheme
Cycle to Work Scheme
25 days annual leave
Data Centre Health & Safety Lead | On-site HSE Manager
Data Centre Health & Safety Lead | On-site HSE Manager

Bimplus • Greater London

Hybrid
GBP 70,000 - 110,000
Comprehensive Benefits Package (Freel
EHS Lead
EHS Lead

Winthrop Technologies • Blyth

On-site
GBP 65,000 - 90,000